Skip to main content
PermitBase

Nephi building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Nephi, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
21 E 100 N, Nephi, UT 84648
Phone
(435) 250-8086
Office hours
Mon–Thu 7:30 AM – 5:30 PM, Fri 8:00 AM – 12:00 PM

Inspection guide

See how inspections work in Nephi — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — current statewide-mandatory edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026, binding on Nephi per § 15A-1-204; Nephi City's own Building Permit page links directly to the ICC code library (codes.iccsafe.org/codes/i-codes) rather than publishing a distinct local edition page, indicating adoption of whatever the current statewide-standard edition is without a documented local vintage override.
  • 2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update, same statutory basis as above.
  • 2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026.
  • 2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026.
  • 2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026; not separately itemized on Nephi's own Building Permit page, but applies statewide.
  • 2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026.
  • 2024 International Existing Building Code (IEBC) and the residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — adopted statewide per Utah Code § 15A-2-103(1)(i) and (1)(n) respectively; not separately itemized on Nephi's own Building Permit page, but apply statewide.
  • National Electrical Code (NEC) — Nephi's own Electrical Policy documents (Overhead/Underground Residential Electric Service requirements) require installation 'in accordance with the latest edition of the NATIONAL ELECTRIC CODE' — a self-updating reference with no specific year stated on the city's own documents. The current statewide edition is the 2023 NEC per Utah Code § 15A-2-103(1)(g), unchanged by the July 1, 2026 statewide update (a prior version of this entry incorrectly stated '2020 NEC' as if that were a specific city-documented edition; Nephi's own document does not name a year at all). Nephi Power Department administers electrical service inspections separately from the Building Department (435-623-0276).

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
4units

4 buildings · $3M valuation

Trailing 12 months
68units

12 of 12 months reported · #60 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
20units

20 buildings · $10.8M valuation

5 month(s) reported to Census

Full year 2025
67units

50 buildings · $22.2M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Nephi City's Planning and Zoning function is contracted to Juab County (confirmed via Nephi's own budget page: 'Nephi contracts with Juab County for planning services... plan reviews to ensure compliance with Nephi City's land use ordinance'), but the Building Department (permit issuance, fee collection, plan review, and inspection) is administered separately by Nephi City itself, with plan review and inspection labor delivered under a competitively bid professional-services contract (RFP No. 22-01) rather than performed by county staff. This mirrors the West Bountiful UT pattern (contracts inspection to a private firm, keeps its own permit-issuing authority) and is treated as a NOT-excluded, independent jurisdiction for PermitBase purposes.
  • RFP No. 22-01 states directly: 'Nephi City, and Levan Town are independent political subdivisions of the state of Utah operating within Juab County. Juab County is an independent political subdivision of the state of Utah' — Nephi's own procurement document affirms its separate legal status.
  • Nephi's Building Permit fee is valuation-based with no flat citywide table published (contrast with Murray's published percentage-bracket table) — valuation is determined by the contracted plans examiner/building inspector at plan review, not by a self-service formula on Nephi's website.
  • No jurisdiction-published plan-review SLA appears on Nephi's public Building Permits web pages; the 10-business-day plan-review and 2-business-day inspection-scheduling figures come from Nephi's own RFP No. 22-01 procurement document defining the contracted plans examiner/building inspector's service expectations — an official city-issued source, not an estimate.
  • Nephi's online City Code (hosting.civiclinq.com/nephicity/books/city-code) is a React-rendered single-page application that returns only navigation shell on a static fetch — full ordinance text for Title 10/11 could not be independently rendered; only the chapter's existence and the department's own published PDFs (application, fee schedule, RFP, policy packet) are cited as authority here.
  • Utility inspections (electrical, natural gas, sewer lateral, curb/gutter/sidewalk) are scheduled directly with the respective Nephi City utility department (Power, Gas, Sewer, Streets), not through the Building Department's inspector — each requires 24 hours' advance notice, per the Building Permit Policy Document Packet.
  • Nephi's office hours follow a compressed 4/10 schedule: Monday–Thursday 7:30 AM–5:30 PM, Friday 8:00 AM–12:00 PM (city offices closed Friday afternoon).

Comparable nearby cities

Unincorporated Juab County
Both in Juab County8 shared permit types
Compare fees →
Midvale
8 shared permit typesBoth on the 2024 International Plumbing Code (IPC)
Compare fees →
Springville
8 shared permit types~34 mi away
Compare fees →