Nephi requires a Sign Permit for new signage under City Code 10.18 Sign Regulations, with separate application tracks for temporary and permanent signs, reviewed and approved by the Planning Commission.

Verified 2026-07-20 · Source

When you need this permit

  • New sign installation, per Nephi City Code 10.18 Sign Regulations
  • Separate application tracks exist for Temporary and Permanent signs
  • Signed statement from the property owner required if the sign location is not on property owned by the applicant
  • Applicant agrees to keep the sign in good repair and comply with Nephi City sign ordinances
  • Approval by the Planning Commission

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit Fee (Sign on Pole)Nephi City Fee Schedule (current live edition, DocumentCenter/View/4127), Building Permit > Miscellaneous Permit table, page 4 of 26: 'Sign on Pole -- $0.00 -- Building inspector determines fee by valuation.' This is the only sign-related line item in the entire 26-page consolidated fee schedule, using the same $0-base-plus-valuation structure as Nephi's Small/Large Storage Shed Permits. The Sign Permit Application form and Sign Permit web page still do not themselves list a dollar figure, so budget using the valuation-based method the Building Inspector applies at review.
$0.00 base; additional fee determined by the Building Inspector based on valuation

Review timeline

Plan reviewTypical estimate — confirm current times with the Nephi building department
~5–14 business days

How long did your Sign Permit permit actually take in Nephi?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Nephi inspection guide — scheduling & re-inspection fees →

    Tips

    • Nephi's Sign Permit process is split into Temporary and Permanent application tracks, both submitted through the city's online CivicReview portal.
    • Full sign regulations are codified at Nephi City Code 10.18 — review that chapter for size, height, and placement standards before submitting.
    • If the sign will sit on property you don't own, you must attach a signed statement from the property owner with your application.
    • The Sign Permit Application and Sign Permit web page don't list a dollar figure directly, but Nephi's citywide Fee Schedule prices sign permits (listed as 'Sign on Pole') at a $0.00 base fee with the Building Inspector determining any additional amount by valuation -- confirm the specific valuation-based total with the Building Permits office before applying.

    Frequently asked questions

    Nephi requires a sign permit for: New sign installation, per Nephi City Code 10.18 Sign Regulations; Separate application tracks exist for Temporary and Permanent signs; Signed statement from the property owner required if the sign location is not on property owned by the applicant; Applicant agrees to keep the sign in good repair and comply with Nephi City sign ordinances; Approval by the Planning Commission. If your project isn't listed, confirm with Nephi City Building Department (Planning and Zoning, Buildings, and Development) at (435) 250-8086 before starting work.

    Nephi's citywide Fee Schedule lists sign permits (as 'Sign on Pole', under Building Permit > Miscellaneous Permit) at a $0.00 base fee, with the Building Inspector determining any additional amount by valuation -- the same method used for storage shed permits. Confirm the specific total for your sign with Nephi City Building Permits at (435) 250-8086.

    Plan review for a sign permit in Nephi typically runs 5–14 business days. This is an estimate, not a published figure — confirm current review times with Nephi City Building Department (Planning and Zoning, Buildings, and Development) at (435) 250-8086.

    You'll need: Sign Permit Application. Depending on your project, Nephi may also ask for: Property Owner Statement. See the required-documents checklist on this page for details on each.

    Nephi's Sign Permit application is submitted through the city's online CivicReview portal, with separate Temporary and Permanent sign tracks, and is subject to Planning Commission approval under City Code 10.18 Sign Regulations.

    Nephi, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — current statewide-mandatory edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026, binding on Nephi per § 15A-1-204; Nephi City's own Building Permit page links directly to the ICC code library (codes.iccsafe.org/codes/i-codes) rather than publishing a distinct local edition page, indicating adoption of whatever the current statewide-standard edition is without a documented local vintage override.; 2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update, same statutory basis as above.; 2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026.; 2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026.; 2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026; not separately itemized on Nephi's own Building Permit page, but applies statewide.; 2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026.; 2024 International Existing Building Code (IEBC) and the residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — adopted statewide per Utah Code § 15A-2-103(1)(i) and (1)(n) respectively; not separately itemized on Nephi's own Building Permit page, but apply statewide.; National Electrical Code (NEC) — Nephi's own Electrical Policy documents (Overhead/Underground Residential Electric Service requirements) require installation 'in accordance with the latest edition of the NATIONAL ELECTRIC CODE' — a self-updating reference with no specific year stated on the city's own documents. The current statewide edition is the 2023 NEC per Utah Code § 15A-2-103(1)(g), unchanged by the July 1, 2026 statewide update (a prior version of this entry incorrectly stated '2020 NEC' as if that were a specific city-documented edition; Nephi's own document does not name a year at all). Nephi Power Department administers electrical service inspections separately from the Building Department (435-623-0276).. Local amendments apply — see the Nephi overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-20.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nephi building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.