Skip to main content
PermitBase

Unincorporated Juab County building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Juab County, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
160 N Main Street, Office #117, Nephi, UT 84648
Phone
(435) 623-3400
Office hours
Monday–Thursday 7:00 AM – 6:00 PM

Inspection guide

See how inspections work in Unincorporated Juab County — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026). Show full text

    2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026). Juab County's Planning and Zoning Department does not publish a distinct local-vintage code page; the county building permit application and land use materials reference compliance with 'all County and State Building Laws and Ordinances,' indicating adoption of the statewide-standard edition without a documented local override.

  • 2021 International Residential Code (IRC), plus Appendix AQ of the 2021 IRC — Utah Code § 15A-2-103(1)(b)/(c); unchanged by the July 1, 2026 revision — still the current edition.
  • 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).
  • 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).
  • 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).
  • 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); statute has no residential/commercial split — one edition applies to both.
  • 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i). ADDED 2026-07-16: this code was missing entirely from the codesAdopted array; it is not listed on Juab County's own building-permit materials, but it is adopted statewide by statute, so it applies here regardless of the county's omission. Current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).
  • 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n). ADDED 2026-07-16: this code was also missing entirely from the codesAdopted array; same statewide-statute basis as the IEBC entry above.
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the July 1, 2026 revision.
  • Utah Code § 15A-2-103, in the version headed 'Effective 7/1/2026 / Superseded 1/1/2027', puts the 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC in effect from July 1, 2026, replacing the 2021 editions. IRC (2021) and NEC (2023) did not change. The 1/1/2027 version of the statute carries identical editions, so no further edition change is expected then.

Permit types & fees

Unincorporated Juab County's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Unincorporated Juab County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Unincorporated Juab County lands. Privacy.

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
12units

12 buildings · $7.8M valuation

Trailing 12 months
82units

12 of 12 months reported · #64 in Utah coverage by units

Year to date (2026 YTD through 2026-07)
48units

48 buildings · $29M valuation

Full year 2025
102units

81 buildings · $36M valuation

County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder — county totals include incorporated Nephi (place FIPS 54220), which issues its own separate building permits via its own contracted Building Department (see nephi.json).

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Juab County Planning and Zoning issues permits ONLY for unincorporated county land. Nephi (the county's only incorporated city) operates its own separate Building Department under a competitively-bid professional-services contract (RFP No. 22-01) — Nephi contracts with the county for planning services but retains its own permit-issuing authority. Confirm which jurisdiction covers your parcel before applying; a parcel inside Nephi city limits uses nephi.json, not this record.
  • No published fee schedule, percentage table, or per-square-foot rate exists for Juab County building permits — the department computes the Building Permit Fee from project valuation at time of review. The county's own Building Permit Application form leaves the fee fields blank for department completion, and Utah's Public Notice Website (PMN) carries no county-specific building fee resolution for Juab County.
  • The county's official Land Use Code is hosted on a client-rendered CivicLinq portal (hosting.civiclinq.com/juabcounty/books/county-code/preface); ordinance body text beyond what is documented in the county's own published PDF forms is not independently verified here.
  • Utah Code § 17-36-55(3)(a) sets a 14-business-day statutory ceiling for county plan review of one-to-two-family dwellings and townhomes, measured from a complete application; a separate 3-business-day maximum applies to inspection scheduling response under § 17-36-55(2)(b).
  • Acreage-based unincorporated lots may require a recorded 'Pledge for Building Permit,' restricting the pledged property from being reused for acreage determination on a future permit application.
  • As of July 1, 2026, the 2024 IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect statewide per Utah Code § 15A-2-103, replacing the 2021 editions; the 2021 IRC continues unchanged, and the 2023 NEC continues unchanged. The IEBC and ISPSC apply statewide under that same statute.

Comparable nearby cities

Nephi
Both in Juab County8 shared permit types
Compare fees →
Unincorporated Iron County
8 shared permit typesBoth on the 2024 International Plumbing Code (IPC)
Compare fees →