EV Charger / EVSE Permit in Unincorporated Juab County, Utah
Juab County does not publish a distinct EV charger, EVSE, or electric vehicle charging station permit or fee. The county's own Building Permit Application form (co.juab.ut.us / juabcounty.gov) includes "Electrical" as one of its "Type of Construction" checkbox categories (alongside Residential, Commercial/Industrial, Shed/Garage, Agricultural, Remodel/Addition, Other), confirming electrical installation work — including a new dedicated EV charger circuit — is processed under the same single Building Permit Application and valuation-based fee, computed by the Planning and Zoning Department from the project's Total Valuation. No EV-specific line item exists.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- New dedicated electrical circuit and/or panel capacity to serve the charger, checked as "Electrical" under Type of Construction on the county's Building Permit Application
- Compliance with the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Verification of the new circuit, panel capacity, and grounding for the EV charger installation, performed under the general Building Permit inspection process. Specific inspection checklist not separately published online.
See the full Unincorporated Juab County inspection guide — scheduling & re-inspection fees →
Tips
- Juab County has no separate EV-charger or standalone Electrical permit type — check "Electrical" under Type of Construction on the single county Building Permit Application form for an EV charger circuit installation.
- Because the county computes the Building Permit Fee from declared Total Valuation with no published rate table, confirm the exact fee for a specific EV charger project with Planning and Zoning at (435) 623-3400 before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Juab County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Juab County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Juab County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Juab County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →