Juab County does not publish a distinct EV charger, EVSE, or electric vehicle charging station permit or fee. The county's own Building Permit Application form (co.juab.ut.us / juabcounty.gov) includes "Electrical" as one of its "Type of Construction" checkbox categories (alongside Residential, Commercial/Industrial, Shed/Garage, Agricultural, Remodel/Addition, Other), confirming electrical installation work — including a new dedicated EV charger circuit — is processed under the same single Building Permit Application and valuation-based fee, computed by the Planning and Zoning Department from the project's Total Valuation. No EV-specific line item exists.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • New dedicated electrical circuit and/or panel capacity to serve the charger, checked as "Electrical" under Type of Construction on the county's Building Permit Application
  • Compliance with the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit FeeJuab County Building Permit Application, "FOR DEPARTMENT USE ONLY" section: "Total Valuation $___", "Building Permit Fee $___", "1% State Fee +___". No flat-fee table, percentage schedule, or per-square-foot rate for electrical work is published on juabcounty.gov or in any located Juab County Commission fee resolution.
Valuation-based; computed by the Planning and Zoning Department from the applicant's Total Valuation at time of review. No separate EV-charger or electrical-specific rate table is published.
1% State SurchargeUtah Code § 15A-1-209 — statewide surcharge on building permit fees, remitted to the Uniform Building Code Commission. Confirmed on the Juab County Building Permit Application form ("1% State Fee +").
1% of the Building Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Unincorporated Juab County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Verification of the new circuit, panel capacity, and grounding for the EV charger installation, performed under the general Building Permit inspection process. Specific inspection checklist not separately published online.

See the full Unincorporated Juab County inspection guide — scheduling & re-inspection fees →

Tips

  • Juab County has no separate EV-charger or standalone Electrical permit type — check "Electrical" under Type of Construction on the single county Building Permit Application form for an EV charger circuit installation.
  • Because the county computes the Building Permit Fee from declared Total Valuation with no published rate table, confirm the exact fee for a specific EV charger project with Planning and Zoning at (435) 623-3400 before applying.

Frequently asked questions

Unincorporated Juab County requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property; New dedicated electrical circuit and/or panel capacity to serve the charger, checked as "Electrical" under Type of Construction on the county's Building Permit Application; Compliance with the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g). If your project isn't listed, confirm with Juab County Planning and Zoning Department at (435) 623-3400 before starting work.

In Unincorporated Juab County, the published Building Permit Fee is: Valuation-based; computed by the Planning and Zoning Department from the applicant's Total Valuation at time of review. No separate EV-charger or electrical-specific rate table is published.. Additional published fees: 1% State Surcharge — 1% of the Building Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Unincorporated Juab County does not publish a plan-review timeline for this permit. Contact Juab County Planning and Zoning Department at (435) 623-3400 for current turnaround.

You'll need: Juab County Building Permit Application. Depending on your project, Unincorporated Juab County may also ask for: Owner/Builder Certification (if applicable). See the required-documents checklist on this page for details on each.

Unincorporated Juab County requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through Juab County Planning and Zoning Department ((435) 623-3400).

Apply through Juab County Planning and Zoning Department at 160 N Main Street, Office #117, Nephi, UT 84648. Phone: (435) 623-3400. Office hours: Monday–Thursday 7:00 AM – 6:00 PM. Official information: https://juabcounty.gov/departments/planning/.

Unincorporated Juab County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026). Juab County's Planning and Zoning Department does not publish a distinct local-vintage code page; the county building permit application and land use materials reference compliance with 'all County and State Building Laws and Ordinances,' indicating adoption of the statewide-standard edition without a documented local override.; 2021 International Residential Code (IRC), plus Appendix AQ of the 2021 IRC — Utah Code § 15A-2-103(1)(b)/(c); unchanged by the July 1, 2026 revision — still the current edition.; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); statute has no residential/commercial split — one edition applies to both.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i). ADDED 2026-07-16: this code was missing entirely from this file's codesAdopted array; it is not listed on Juab County's own building-permit materials, but it is adopted statewide by statute, so it applies here regardless of the county's omission. Current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n). ADDED 2026-07-16: this code was also missing entirely from this file's codesAdopted array; same statewide-statute basis as the IEBC entry above.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the July 1, 2026 revision.; NOTE (verified 2026-07-16 against the live Utah Code § 15A-2-103 text, version headed 'Effective 7/1/2026 / Superseded 1/1/2027'): the 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC listed above took effect July 1, 2026, replacing the 2021 editions; IRC (2021) and NEC (2023) did not change. The 1/1/2027 version of the statute carries identical editions, so no further flip is expected then. This file previously forecast this change but still led with the 2021 editions as current, and omitted IEBC/ISPSC entirely — corrected on this date.. Local amendments apply — see the Unincorporated Juab County overview page for the full list.

No. Juab County does not publish a distinct EV-charger or EVSE permit or fee. EV charger circuit installation is checked as "Electrical" under Type of Construction on the county's single Building Permit Application, and is fee-assessed under the same valuation-based Building Permit Fee as other construction work.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Juab County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.