Solar PV Installation Permit in Unincorporated Juab County, Utah

Juab County does not publish a distinct solar, solar PV, or renewable-energy installation permit or fee. The county's own Building Permit Application form (juabcounty.gov/wp-content/uploads/2022/07/Bldg-Permit-form.pdf) offers only "Residential," "Electrical," "Commercial/Industrial," "Shed/Garage," "Agricultural," "Remodel/Addition," and "Other" checkboxes under "Type of Construction" — there is no "Solar" or "PV" category, and the word "solar" appears nowhere on the form. A solar PV installation (rooftop or ground-mount, residential or commercial) is processed under this same single Building Permit Application and valuation-based fee, computed by the Planning and Zoning Department from the project's Total Valuation, the same as any other electrical or remodel/addition work.

Verified 2026-07-21 · Source

When you need this permit

  • Installation of a residential or commercial rooftop or ground-mount solar PV system on unincorporated county land
  • Completed Juab County Building Permit Application, checking "Electrical" and/or "Residential"/"Commercial/Industrial" and "Remodel/Addition" as applicable under Type of Construction — no separate solar-specific checkbox exists on the form
  • Compliance with the 2023 National Electrical Code (NEC) Article 690 (Solar Photovoltaic Systems), adopted statewide by Utah Code § 15A-2-103(1)(g)
  • Compliance with the 2024 International Residential Code / International Building Code structural provisions for roof-mounted equipment loads, adopted statewide by Utah Code § 15A-2-103(1)(a)/(b)
  • Owner/Builder Certification (Utah DOPL) filed if the owner is acting as their own contractor rather than using a licensed electrical/solar contractor Owner-builder

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit FeeJuab County Building Permit Application, "FOR DEPARTMENT USE ONLY" section: "Total Valuation $___", "Building Permit Fee $___", "1% State Fee +___", "Total Fee $___". Directly re-fetched and inspected 2026-07-21: the form's "Type of Construction" checkbox list (Residential, Electrical, Commercial/Industrial, Shed/Garage, Agricultural, Remodel/Addition, Other) contains no "Solar" or "PV" entry, and no other fee document on juabcounty.gov (Building Permits page, Codes & Ordinances page, Planning and Zoning page) mentions a solar-specific fee. No flat-fee table, percentage schedule, or per-square-foot/per-kW rate for solar installations is published anywhere on juabcounty.gov or in any located Juab County Commission fee resolution.
Valuation-based; computed by the Planning and Zoning Department from the applicant's Total Valuation at time of review. No separate solar-specific or renewable-energy rate table is published.
1% State SurchargeUtah Code § 15A-1-209 — statewide surcharge on building permit fees, remitted to the Uniform Building Code Commission. Confirmed on the Juab County Building Permit Application form ("1% State Fee +").
1% of the Building Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Solar PV Installation Permit permit actually take in Unincorporated Juab County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Verification of PV system wiring, inverter/disconnect installation, and interconnection per NEC Article 690, performed under the general Building Permit inspection process. Specific solar inspection checklist not separately published online.

  2. 2

    Final

    Final inspection and sign-off before the system may be energized/interconnected; occupancy/use restrictions from the general Building Permit Application apply to any structural work performed alongside the installation.

See the full Unincorporated Juab County inspection guide — scheduling & re-inspection fees →

Tips

  • Juab County has no separate solar or solar PV permit type — check "Electrical" (and, if applicable, "Residential"/"Commercial/Industrial" or "Remodel/Addition") under Type of Construction on the single county Building Permit Application form for a solar installation.
  • Because the county computes the Building Permit Fee from declared Total Valuation with no published rate table, confirm the exact fee for a specific solar project with Planning and Zoning at (435) 623-3400 before applying.
  • This entry covers residential/commercial rooftop or ground-mount solar installed on an individual parcel's own building permit — it does not cover utility-scale solar energy generation facilities (e.g., the 80-megawatt Clover Creek Solar Project in Juab County), which are development-scale projects reviewed through a separate site-plan/conditional-use and, in that project's case, Community Reinvestment Agency process rather than this Building Permit Application.

Frequently asked questions

Unincorporated Juab County requires a solar pv installation permit for: Installation of a residential or commercial rooftop or ground-mount solar PV system on unincorporated county land; Completed Juab County Building Permit Application, checking "Electrical" and/or "Residential"/"Commercial/Industrial" and "Remodel/Addition" as applicable under Type of Construction — no separate solar-specific checkbox exists on the form; Compliance with the 2023 National Electrical Code (NEC) Article 690 (Solar Photovoltaic Systems), adopted statewide by Utah Code § 15A-2-103(1)(g); Compliance with the 2024 International Residential Code / International Building Code structural provisions for roof-mounted equipment loads, adopted statewide by Utah Code § 15A-2-103(1)(a)/(b); Owner/Builder Certification (Utah DOPL) filed if the owner is acting as their own contractor rather than using a licensed electrical/solar contractor. If your project isn't listed, confirm with Juab County Planning and Zoning Department at (435) 623-3400 before starting work.

In Unincorporated Juab County, the published Building Permit Fee is: Valuation-based; computed by the Planning and Zoning Department from the applicant's Total Valuation at time of review. No separate solar-specific or renewable-energy rate table is published.. Additional published fees: 1% State Surcharge — 1% of the Building Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Unincorporated Juab County does not publish a plan-review timeline for this permit. Contact Juab County Planning and Zoning Department at (435) 623-3400 for current turnaround.

You'll need: Juab County Building Permit Application; Plot Plan / Plat Map. Depending on your project, Unincorporated Juab County may also ask for: Owner/Builder Certification (Utah DOPL). See the required-documents checklist on this page for details on each.

Unincorporated Juab County requires 2 inspection(s) for a solar pv installation permit, in order: Electrical Inspection, Final. Schedule each through Juab County Planning and Zoning Department ((435) 623-3400).

Apply through Juab County Planning and Zoning Department at 160 N Main Street, Office #117, Nephi, UT 84648. Phone: (435) 623-3400. Office hours: Monday–Thursday 7:00 AM – 6:00 PM. Official information: https://juabcounty.gov/departments/planning/.

No. Juab County does not publish a distinct solar, solar PV, or renewable-energy permit or fee. A solar PV installation is checked as "Electrical" (and/or the relevant construction-type box) under Type of Construction on the county's single Building Permit Application, and is fee-assessed under the same valuation-based Building Permit Fee as other construction work.

The 2023 National Electrical Code (NEC), Article 690 (Solar Photovoltaic Systems), applies statewide per Utah Code § 15A-2-103(1)(g), along with the 2024 IRC/IBC structural provisions for roof-mounted equipment where applicable.

Sources & verification

Verified against official sources. Last reviewed 2026-07-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Juab County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.