Solar PV Installation Permit — Unincorporated Juab County, Utah · Requirements sheet
Verified 2026-07-21 · Source: https://juabcounty.gov/wp-content/uploads/2022/07/Bldg-Permit-form.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar PV Installation Permit in Unincorporated Juab County, Utah
Juab County does not publish a distinct solar, solar PV, or renewable-energy installation permit or fee. The county's own Building Permit Application form (juabcounty.gov/wp-content/uploads/2022/07/Bldg-Permit-form.pdf) offers only "Residential," "Electrical," "Commercial/Industrial," "Shed/Garage," "Agricultural," "Remodel/Addition," and "Other" checkboxes under "Type of Construction" — there is no "Solar" or "PV" category, and the word "solar" appears nowhere on the form. A solar PV installation (rooftop or ground-mount, residential or commercial) is processed under this same single Building Permit Application and valuation-based fee, computed by the Planning and Zoning Department from the project's Total Valuation, the same as any other electrical or remodel/addition work.
Verified 2026-07-21 · Source
When you need this permit
- Installation of a residential or commercial rooftop or ground-mount solar PV system on unincorporated county land
- Completed Juab County Building Permit Application, checking "Electrical" and/or "Residential"/"Commercial/Industrial" and "Remodel/Addition" as applicable under Type of Construction — no separate solar-specific checkbox exists on the form
- Compliance with the 2023 National Electrical Code (NEC) Article 690 (Solar Photovoltaic Systems), adopted statewide by Utah Code § 15A-2-103(1)(g)
- Compliance with the 2024 International Residential Code / International Building Code structural provisions for roof-mounted equipment loads, adopted statewide by Utah Code § 15A-2-103(1)(a)/(b)
- Owner/Builder Certification (Utah DOPL) filed if the owner is acting as their own contractor rather than using a licensed electrical/solar contractor Owner-builder
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Verification of PV system wiring, inverter/disconnect installation, and interconnection per NEC Article 690, performed under the general Building Permit inspection process. Specific solar inspection checklist not separately published online.
- 2
Final
Final inspection and sign-off before the system may be energized/interconnected; occupancy/use restrictions from the general Building Permit Application apply to any structural work performed alongside the installation.
See the full Unincorporated Juab County inspection guide — scheduling & re-inspection fees →
Tips
- Juab County has no separate solar or solar PV permit type — check "Electrical" (and, if applicable, "Residential"/"Commercial/Industrial" or "Remodel/Addition") under Type of Construction on the single county Building Permit Application form for a solar installation.
- Because the county computes the Building Permit Fee from declared Total Valuation with no published rate table, confirm the exact fee for a specific solar project with Planning and Zoning at (435) 623-3400 before applying.
- This entry covers residential/commercial rooftop or ground-mount solar installed on an individual parcel's own building permit — it does not cover utility-scale solar energy generation facilities (e.g., the 80-megawatt Clover Creek Solar Project in Juab County), which are development-scale projects reviewed through a separate site-plan/conditional-use and, in that project's case, Community Reinvestment Agency process rather than this Building Permit Application.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Juab County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Juab County
Solar PV Installation Permit in other cities
Compare solar pv installation permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Juab County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Juab County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →