Skip to main content
PermitBase

Version history — Nephi, Utah

This is PermitBase’s own verified record for Nephi, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Nephi’s actual law was at that time.

Permanent link to today’s record

/utah/juab-county/nephi/as-of/2026-08-20/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-20Current record
  • 2026-08-02Superseded
    • Nephi, Utah — plan-review timeline record updated: 10–10 business days
    • Nephi, Utah — plan-review timeline record updated: 10–10 business days
  • 2026-07-22Superseded
  • 2026-07-21Superseded
  • 2026-07-20Superseded
    • Nephi, Utah — Sign Permit fee record added: Sign Permit Fee (Sign on Pole) ($0.00 base; additional fee determined by the Building Inspector based on valuation)
    • Nephi, Utah — Sign Permit fee record removed: Sign Permit Fee
    • Nephi, Utah — EV Charger / EVSE Permit record added
    • Nephi, Utah — Sign Permit record added
  • 2026-07-19Superseded
  • 2026-07-16Superseded
  • 2026-07-07Initial record — coverage of Nephi began