Version history — Nephi, Utah
This is PermitBase’s own verified record for Nephi, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Nephi’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-20Current record
- 2026-08-02Superseded
- Nephi, Utah — plan-review timeline record updated: 10–10 business days
- Nephi, Utah — plan-review timeline record updated: 10–10 business days
- 2026-07-22Superseded
- 2026-07-21Superseded
- 2026-07-20Superseded
- Nephi, Utah — Sign Permit fee record added: Sign Permit Fee (Sign on Pole) ($0.00 base; additional fee determined by the Building Inspector based on valuation)
- Nephi, Utah — Sign Permit fee record removed: Sign Permit Fee
- Nephi, Utah — EV Charger / EVSE Permit record added
- Nephi, Utah — Sign Permit record added
- 2026-07-19Superseded
- 2026-07-16Superseded
- 2026-07-07Initial record — coverage of Nephi began