Nephi building permits

Verified

Nephi, Utah — as published 2026-07-16.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — current statewide-mandatory edition per Utah Code § 15A-2-103(1)(a), effective July 1, 2026, binding on Nephi per § 15A-1-204; Nephi City's own Building Permit page links directly to the ICC code library (codes.iccsafe.org/codes/i-codes) rather than publishing a distinct local edition page, indicating adoption of whatever the current statewide-standard edition is without a documented local vintage override.2021 International Residential Code (IRC) — current statewide edition per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update, same statutory basis as above.2024 International Plumbing Code (IPC) — current statewide edition per Utah Code § 15A-2-103(1)(d), effective July 1, 2026.2024 International Mechanical Code (IMC) — current statewide edition per Utah Code § 15A-2-103(1)(e), effective July 1, 2026.2024 International Fuel Gas Code (IFGC) — current statewide edition per Utah Code § 15A-2-103(1)(f), effective July 1, 2026; not separately itemized on Nephi's own Building Permit page, but applies statewide.2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide edition per Utah Code § 15A-2-103(1)(h), effective July 1, 2026.2024 International Existing Building Code (IEBC) and the residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — adopted statewide per Utah Code § 15A-2-103(1)(i) and (1)(n) respectively; not separately itemized on Nephi's own Building Permit page, but apply statewide.National Electrical Code (NEC) — Nephi's own Electrical Policy documents (Overhead/Underground Residential Electric Service requirements) require installation 'in accordance with the latest edition of the NATIONAL ELECTRIC CODE' — a self-updating reference with no specific year stated on the city's own documents. The current statewide edition is the 2023 NEC per Utah Code § 15A-2-103(1)(g), unchanged by the July 1, 2026 statewide update (a prior version of this entry incorrectly stated '2020 NEC' as if that were a specific city-documented edition; Nephi's own document does not name a year at all). Nephi Power Department administers electrical service inspections separately from the Building Department (435-623-0276).

Permit types & fees

Residential Building Permit

Verified

Required for new single-family and duplex residential construction and any work regulated by the statewide-adopted 2021 IRC / 2024 IBC. Nephi's Building Department (staffed separately from the Juab County-contracted Planning and Zoning function) issues the permit; plan review and building inspection services are themselves delivered under a competitively-bid professional-services contract (RFP No. 22-01) rather than by county staff. The core Building Permit fee is valuation-based (no flat citywide table is published); a $1,000 non-refundable Building Permit Application Deposit is credited toward the final fee at issuance.

Verified 2026-07-19 · Source

Requirements

  • New single-family or duplex residential construction, or any work regulated by the statewide-adopted 2021 IRC
  • Completed Nephi City Building Permit Application (Rev. 12-6-23), signed by owner and contractor
  • Signed Receipt of Nephi City Policy Documents (Electrical, Natural Gas, Sewer Lateral, and Curb/Gutter/Sidewalk policy packets)
  • Two sets of plans and a plat map/site plan submitted to the Building Department after Planning and Zoning approval of the underlying land use application
  • Toilet on site before work commences (per the official Building Permit Application, Page 2 conditions)
  • Compliance with subdivision soils report recommendations where applicable (collapsible soils notice, per the official application form)

Required documents

  • RequiredNephi City Building Permit Application (Rev. 12-6-23)Two-page application capturing parcel use, construction type/materials, contractor and owner information, and the department fee worksheet (Parks Impact Fee, Electric Fee/Impact Fee, Water Fee/Impact Fee, Sewer Fee, Gas Fee, Engineering Fee, Asphalt Fee, Road Excavation Fee, Garbage Can Fee, Plan Check Fee, Sidewalk Deposit, Building Permit Fee, 1% State Fee, Permit Tracking Fee).
  • RequiredReceipt of Nephi City Policy DocumentsSigned acknowledgment covering Electrical, Natural Gas, Sewer Lateral, and Curb/Gutter/Sidewalk/Drive Approach policy documents and standard drawings; applicant agrees to remove and re-install any non-compliant work at no cost to the city.
  • RequiredSite Plan / Plat MapSubmitted alongside the building permit application following Planning and Zoning (Juab County-contracted) approval of the underlying land use application.

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased off valuation (no flat citywide table published; fee computed by the contracted plans examiner/building inspector from project valuation)Nephi City Fee Schedule Report (effective 6/16/2026), 'Building Permit' > 'Miscellaneous Permit' > 'Building Permit' line: Current Approved Fee listed as $0.00 with Additional Conditions 'Based off valuation.' This is a valuation-driven fee methodology (not an unpublished/unresolved fee) — Nephi has not published a fixed percentage or per-square-foot table distinct from valuation-based calculation performed at plan review.
Building Permit Application Deposit$1,000.00 per permit (non-refundable; credited toward the Building Permit Fee at issuance)Nephi City Fee Schedule Report (6/16/2026): 'This is non-refundable. When a permit is issued it will be credited. If the permit is canceled, this pays for the plan review.' Also appears on the official Building Permit Application, Page 2.
Residential Permit Plan Check Fee$400.00 minimum per plan; $100.00 per hour for review time exceeding 4 hours; $100.00 for a duplicate plan checkNephi City Fee Schedule Report (6/16/2026), 'Building Permit' > 'Residential Permit' rows: Plan Check Fee $400.00 Per Plan (Minimum); Plan Check Fee $100.00 Per hour over 4 hours; Duplicate Plan Check $100.00 Per Plan.
Building Permit State Surcharge1% of building permit feeNephi City Fee Schedule Report (6/16/2026): 'State of Utah charges a 1% surcharge on building permit fees' — statewide surcharge under Utah Code § 15A-1-403.
Permit Tracking Fee$75.00 per permitNephi City Fee Schedule Report (6/16/2026), Building Permit > Miscellaneous Permit > Permit Tracking Fee.
Impact Fee - Parks & Recreation (Single Family Household)$2,802.00 per residential unitNephi City Fee Schedule Report (6/16/2026), Building Permit > Miscellaneous Permit > Impact Fee > Impact Fee - Parks & Recreation, Single Family Household.
Impact Fee - Water$6,067.00 per Equivalent Domestic Unit (EDU)Nephi City Fee Schedule Report (6/16/2026), Building Permit > Miscellaneous Permit > Impact Fee > Impact Fee - Water.
Impact Fee - Electric$2,075.00 per Equivalent Domestic Unit (EDU)Nephi City Fee Schedule Report (6/16/2026), Building Permit > Miscellaneous Permit > Impact Fee > Impact Fee - Electric.
Sidewalk Deposit / Sidewalk Inspection Fee$4,000.00 refundable deposit + $60.00 per inspectionNephi City Fee Schedule Report (6/16/2026): deposit refunded if sidewalk passes ADA-compliance inspection; also stated on the official Building Permit Application (Page 2: Sidewalk Deposit $4,000.00, Sidewalk Inspection $60.00).

Commercial Building Permit

Required for new commercial and industrial construction in Nephi, regulated by the statewide-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a), effective July 1, 2026). Nephi's Building Permits page links to a distinct 'Commercial & Industrial Building' permit application, but the underlying application form, valuation-based fee methodology, and $1,000 non-refundable Building Permit Application Deposit are shared with the Residential Building Permit process — the Plan Check Fee is the primary line item that differs by permit category.

Reviewed 2026-07-23 · Source

Requirements

  • New commercial or industrial construction, or any work regulated by the statewide-adopted 2024 IBC
  • Completed Nephi City Building Permit Application, signed by owner and contractor
  • Two sets of plans and a plat map/site plan submitted to the Building Department after Planning and Zoning approval of the underlying land use application
  • Compliance with Nephi's Commercial-Industrial zoning chart (CU1, CU2, HC1, HC2, CC, ID1, ID2, ID3 zones)
  • Fire Protection review coordination (per Nephi's general permit process for non-residential structures)

Required documents

  • RequiredNephi City Building Permit ApplicationSame two-page application form used for residential permits (parcel use, construction type/materials, contractor and owner information, department fee worksheet); Nephi's Building Permits page separately links to this as the 'Commercial & Industrial Building' application, but a dedicated commercial-only form distinct from the general Building Permit Application was not located as of 2026-07-19.
  • RequiredSite Plan / Plat MapSubmitted alongside the building permit application following Planning and Zoning approval of the underlying land use application, consistent with the residential process.
  • RequiredConstruction DocumentsDigital plan set including code analysis, structural drawings, electrical/mechanical/plumbing plans, and energy code compliance documentation appropriate to commercial occupancy classifications.

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased off valuation (no flat citywide table published; fee computed by the contracted plans examiner/building inspector from project valuation)Nephi City Fee Schedule Report, 'Building Permit' > 'Miscellaneous Permit' > 'Building Permit' line: Current Approved Fee listed as $0.00 with Additional Conditions 'Based off valuation' — the same valuation-driven methodology documented on this file's Residential Building Permit entry; Nephi does not publish a separate commercial-only valuation table.
Commercial Permit Plan Check Fee$600.00 minimum per plan; $150.00 per hour for review time exceeding 4 hoursContent-verified 2026-07-23 against the live Nephi City Fee Schedule Report, effective 6/16/2026 (nephi.utah.gov/DocumentCenter/View/4127/Fee-Schedule-Report-6-16-26-PDF), 'Building Permit' > 'Commercial Permit' rows: Plan Check Fee $600.00 Per Plan (Minimum); Plan Check Fee $150.00 Per hour over 4 hours — figure unchanged from the prior 6/3/2025 edition (DocumentCenter ID 3686, now dead/404, superseded first by a since-also-dead 2/5/2026 edition at ID 3933, then by this 6/16/2026 edition). This is a higher rate than the $400 minimum / $100 per-hour rate documented for the Residential Permit Plan Check Fee on this file's Residential Building Permit entry, both drawn from the same fee-schedule document family.
Building Permit Application Deposit$1,000.00 per permit (non-refundable; credited toward the Building Permit Fee at issuance)Same deposit structure documented on this file's Residential Building Permit entry — Nephi's Fee Schedule Report does not distinguish this deposit by residential vs. commercial permit type.
Building Permit State Surcharge1% of building permit feeStatewide surcharge under Utah Code § 15A-1-403, same as documented for residential permits in this file.
Commercial Impact Fees (Water, Electric)Not found as a single published flat figure — commercial water/electric impact fees are scaled by meter size (Nephi's commercial water service ranges from 2-inch to 6-inch connections per the city's Water and Power Impact Fee Facilities Plan)Nephi City Water and Power Impact Fee Facilities Plan and Impact Fee Analysis (nephi.utah.gov/DocumentCenter/View/2977/Nephi-Water-and-Power-IFFP-and-IFA-PDF) confirms commercial impact fees exist and are meter-size-scaled, unlike the flat per-unit residential figures documented on the Residential Building Permit entry. No single commercial dollar figure is published without knowing the specific meter size for a project. Omitted rather than estimated.

Commercial Tenant Improvement / Tenant Finish Permit

Required for tenant improvement and tenant finish work in existing commercial buildings in Nephi. Nephi does not publish a distinct tenant-improvement application, checklist, or fee tier separate from its general Commercial Building Permit process — tenant improvement projects are processed as commercial construction using the same Building Permit Application, Commercial Permit Plan Check Fee, and valuation-based Building Permit Fee.

Reviewed 2026-07-23 · Source

Requirements

  • Tenant improvement or tenant finish work in an existing commercial building within Nephi
  • Completed Nephi City Building Permit Application, signed by owner and contractor
  • Compliance with Nephi's Commercial-Industrial zoning chart for the applicable zone
  • Construction documents showing the scope of tenant-space work (new vs. existing construction, MEP changes)

Required documents

  • RequiredNephi City Building Permit ApplicationSame form used for new commercial construction and residential permits; Nephi does not publish a separate tenant-improvement-specific application.
  • RequiredConstruction Documents (Tenant Space Scope)Plans showing the specific use of the tenant space, new build-out vs. remodel, and MEP layout appropriate to the scope of work.

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased off valuation (no flat citywide table published)Nephi City Fee Schedule Report, 'Building Permit' > 'Miscellaneous Permit' > 'Building Permit' line — same valuation-driven methodology used for new commercial and residential permits; no separate tenant-improvement valuation bracket is published.
Commercial Permit Plan Check Fee$600.00 minimum per plan; $150.00 per hour for review time exceeding 4 hoursSame Commercial Permit Plan Check Fee documented on this file's Commercial Building Permit entry — Nephi's fee schedule does not carve out a lower tenant-improvement-specific plan check rate. Content-verified 2026-07-23 against the live Fee Schedule Report, effective 6/16/2026 (figure unchanged from the prior 6/3/2025 edition).
Building Permit Application Deposit$1,000.00 per permit (non-refundable; credited toward the Building Permit Fee at issuance)Same deposit structure documented on this file's Residential and Commercial Building Permit entries.
Building Permit State Surcharge1% of building permit feeStatewide surcharge under Utah Code § 15A-1-403.

Sign Permit

Verified

Nephi requires a Sign Permit for new signage under City Code 10.18 Sign Regulations, with separate application tracks for temporary and permanent signs, reviewed and approved by the Planning Commission.

Verified 2026-07-20 · Source

Requirements

  • New sign installation, per Nephi City Code 10.18 Sign Regulations
  • Separate application tracks exist for Temporary and Permanent signs
  • Signed statement from the property owner required if the sign location is not on property owned by the applicant
  • Applicant agrees to keep the sign in good repair and comply with Nephi City sign ordinances
  • Approval by the Planning Commission

Required documents

  • RequiredSign Permit ApplicationNephi City Corporation form; requires business information, sign construction material, whether the sign is attached and/or illuminated (with lighting details), clearance from ground to bottom of sign, and lot dimensions/sign placement drawing or blueprint
  • OptionalProperty Owner StatementSigned statement from the property owner, required only if the sign location is not on property owned by the applicant

Fee schedule

Fee typeAmountNotes
Sign Permit Fee (Sign on Pole)$0.00 base; additional fee determined by the Building Inspector based on valuationNephi City Fee Schedule (current live edition, DocumentCenter/View/4127), Building Permit > Miscellaneous Permit table, page 4 of 26: 'Sign on Pole -- $0.00 -- Building inspector determines fee by valuation.' This is the only sign-related line item in the entire 26-page consolidated fee schedule, using the same $0-base-plus-valuation structure as Nephi's Small/Large Storage Shed Permits. The Sign Permit Application form and Sign Permit web page still do not themselves list a dollar figure, so budget using the valuation-based method the Building Inspector applies at review.

EV Charger / EVSE Permit

Verified

Nephi does not publish a distinct EV-charger fee line item. Per the Nephi City Fee Schedule (effective 6/16/2026), installing an EV charger (EVSE) is electrical work billed under one of the city's standalone electrical permit categories: the Electrical Meter Base Upgrade Permit ($75.00 per inspection, if a service/meter upgrade is required) or the Electrical Re-wire Permit (valuation-based, determined by the building inspector, for new circuit work).

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • New dedicated circuit and/or panel/meter-base capacity to serve the charger
  • Building Permit Application submitted to Nephi City (contracted plan review/building inspector services)

Required documents

  • RequiredNephi City Building Permit ApplicationRev. 12-6-23 official application form.

Fee schedule

Fee typeAmountNotes
Electrical Meter Base Upgrade Permit$75.00 per inspectionNephi City Fee Schedule (effective 6/16/2026), 'Building Permit > Miscellaneous Permit > Electrical Meter Base Upgrade Permit.' Applies if the EV charger installation requires a meter base or service upgrade.
Electrical Re-wire PermitBuilding inspector determines fee by valuationNephi City Fee Schedule (effective 6/16/2026), 'Building Permit > Miscellaneous Permit > Electrical Re-wire Permit.' Applies to new circuit/wiring work for an EV charger not requiring a meter base upgrade.
Building Permit State Surcharge1% of building permit feeNephi City Fee Schedule (effective 6/16/2026) — statewide surcharge under Utah Code § 15A-1-403.

Solar PV Permit

Verified

Nephi does not publish a distinct solar/solar-PV permit type or fee line item. Per the Nephi City Fee Schedule Report (effective 6/16/2026), a rooftop or ground-mounted solar photovoltaic installation is processed as electrical/building work under the same valuation-based Building Permit and the Electrical Re-wire Permit (fee determined by the building inspector from valuation); no 'solar' fee line exists anywhere in the schedule. Separately, any grid-tied ('net metered') system must also go through Nephi City Power's own Net Metering License Application and Interconnection Agreement (Electric Service Schedule No. 16, effective November 1, 2016) — this is a utility interconnection process, not a building-department permit, and it carries its own recurring capacity charge rather than a one-time permit fee.

Verified 2026-07-21 · Source

Requirements

  • Nephi City Power's Net Metering Standards (Section B.1) require: 'Customer shall comply with all the latest applicable National Electric Code (NEC) requirements [NEC Articles 690 and 705], NESC requirements, State of Utah requirements, building codes, and shall obtain electrical permit(s) for the equipment installation' — i.e., the standard building/electrical permit, not a separate solar permit
  • Completed Nephi City Building Permit Application (Rev. 12-6-23) covering the electrical work for the PV installation
  • For any grid-connected ('net metered') system: a completed Net Metering License Application and executed Interconnection Agreement for Net Metering Service with Nephi City Power, prior to interconnection
  • System capacity limited to not more than 25 kW to qualify for Nephi's net metering program (Electric Service Schedule No. 16)
  • A UL-1741-compliant inverter capable of safe synchronous coupling with the utility, plus a UL-approved, padlockable, visible-break safety disconnect switch installed adjacent to Nephi City Power's meter (Net Metering Standards, Sections B.6 and B.8)
  • Solar PV equipment compliant with UL 1741 (static inverters/charge controllers), UL 1703 (flat-plate PV modules/panels), IEEE 1262-1995, and IEEE 929-2000 (Net Metering Standards, Section B.10)
  • A System Diagram (one-line, schematic, or full wiring diagram) submitted with the License Application showing the generator/PV array, inverter, disconnect switch, electrical service panel, and Nephi City Power service meter (Net Metering Standards, Section D)

Required documents

  • RequiredNephi City Building Permit Application (Rev. 12-6-23)Standard building/electrical permit application used for the physical PV installation work; Nephi has no separate solar-specific permit application.
  • RequiredNet Metering License AgreementNephi City Power's interconnection agreement for Net Metering Service, required before any grid-tied solar system is permitted to interconnect and operate in parallel with the city's distribution system.
  • RequiredNephi Net Metering Standards (System Diagram requirement)Sets interconnection requirements (NEC Articles 690/705, UL 1741 inverter, disconnect switch, equipment compliance) and requires a System Diagram documenting the generator, inverter, disconnect switch, service panel, and meter.
  • OptionalElectrical Service RequirementsNephi City's general electrical service/policy packet referenced alongside the Building Permit Application for any electrical work, including solar installations.

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased off valuation (no flat citywide table published)Nephi City Fee Schedule Report (effective 6/16/2026), 'Building Permit' > 'Miscellaneous Permit' > 'Building Permit' line: Current Approved Fee $0.00, Additional Conditions 'Based off valuation.' No separate solar line item exists; a solar installation is fee-assessed under this same valuation-based methodology.
Electrical Re-wire PermitBuilding inspector determines fee by valuationNephi City Fee Schedule Report (effective 6/16/2026), 'Building Permit > Miscellaneous Permit > Electrical Re-wire Permit.' Applies to the new PV circuit/inverter wiring work; no solar-specific fee is published.
Building Permit State Surcharge1% of building permit feeNephi City Fee Schedule Report (effective 6/16/2026) — statewide surcharge under Utah Code § 15A-1-403.
Permit Tracking Fee$75.00 per permitNephi City Fee Schedule Report (effective 6/16/2026), Building Permit > Miscellaneous Permit > Permit Tracking Fee.
Net Metering Distribution Access / Capacity Charge$3.00 per kilowatt (kW) of installed capacity, billed monthly (e.g., an 8.25 kW rooftop array is billed 8.25 x $3.00 = $24.75/month)Nephi City Electric Service Schedule No. 16, Net Metering Service (effective November 1, 2016): 'Capacity Charge: $3.00 per kilowatt (kW) of installed capacity of the Renewable Generating Facility,' billed in addition to standard electric rates. This is a recurring utility interconnection charge tied specifically to solar/renewable net-metered systems — not a one-time permit fee — and is separate from the Building/Electrical Permit fees above. Also confirmed on the Nephi City Fee Schedule Report (6/16/2026), 'Utility Rates > Electric > Net Meter > Monthly System Access Charge,' $3.00/kW.

Fire Sprinkler / Fire Alarm System Permit

Verified

Nephi's own 26-page Fee Schedule Report (effective 6/16/2026) contains zero 'sprinkler,' 'fire alarm,' or 'fire suppression' line items anywhere in its Building Permit, Miscellaneous Permit, or Utility Rates sections (full page-by-page review, 2026-07-22). Fire protection service to Nephi is not run by a standalone Nephi City fire marshal's office — Nephi Fire Department (Chief Kurtis Park, 95 E 100 N) is one of six volunteer departments (Eureka, Levan, Mona, Nephi, Rocky Ridge, and West Desert communities) under the countywide Juab Special Service Fire District, established 2001, addressed at 160 North Main, Nephi, UT 84648 (the same address as Juab County's own offices) per the Utah Public Notice Website's public-body listing. A cross-check of Fire Suppression Services Inc.'s industry-standard 'Authorities Having Jurisdiction' reference document (2026-04-01 edition) lists 'Juab County' with sub-entries for Diamond Valley, Eureka, Nephi (Kurtis Park), and Partoun, but -- unlike dozens of other Utah jurisdictions in the same document -- provides no local fire-marshal plan-review contact, fee, or process for any of them, consistent with these small/rural jurisdictions deferring fire sprinkler and fire alarm plan review to the Utah State Fire Marshal's Office rather than reviewing plans locally. The State Fire Marshal's Office's own official Automatic Fire Sprinkler Plan Submittal Form and Fire Alarm Plan Review Submittal Form (both hosted on firemarshal.utah.gov) set an identical governing fee for either system type: square footage x $0.022, with a $75.00 minimum, payable before plan review is released. Because both fire-sprinkler and fire-alarm submittals route to the same state office under the same fee formula for a jurisdiction served by one joint fire district, this entry combines both system types rather than splitting them, consistent with the combined slug convention used for other Utah joint-fire-district cities in this dataset (e.g. Kaysville, Layton, North Logan, Riverton, Tooele).

Verified 2026-07-22 · Source

Requirements

  • New installation or modification of an automatic fire sprinkler system and/or automatic fire alarm system on a property within Nephi
  • Completed Automatic Fire Sprinkler Plan Submittal Form and/or Fire Alarm Plan Review Submittal Form, submitted to the Utah State Fire Marshal's Office (410 West 9800 South, 3rd Floor, Sandy, UT 84070; planreviews@utah.gov; (801) 256-2390) -- Nephi and Juab County have no local fire-marshal plan reviewer listed for this function
  • Water Supply Analysis information (static pressure, residual pressure, flow) required for sprinkler submittals per Utah Admin. Code R710-4-5
  • A separate Nephi City Building Permit Application for the underlying construction work associated with the fire protection system installation
  • Fees paid to the Utah State Fire Marshal's Office before plan review will be released

Required documents

  • RequiredAutomatic Fire Sprinkler Plan Submittal FormUtah State Fire Marshal's Office form; requires scope-of-work square footage (fee calculation), water supply analysis data (static/residual pressure, flow, source of information), sprinkler drawing and hydraulic calculation set counts, and material/seismic-calculation submittal checkboxes.
  • RequiredFire Alarm Plan Review Submittal FormUtah State Fire Marshal's Office form; requires a floor plan showing room size/use, occupancy type, project code analysis, alarm-initiating/notification device locations, alarm control/annunciation equipment, battery and voltage-drop calculations, conductor sizing, and manufacturer cut sheets.
  • RequiredNephi City Building Permit Application (Rev. 12-6-23)Standard building permit application for the underlying construction accompanying the fire protection system installation; Nephi has no separate fire-sprinkler/alarm-specific application of its own.

Fee schedule

Fee typeAmountNotes
Fire Sprinkler Plan Review FeeSquare footage x $0.022 per square foot; $75.00 minimumUtah State Fire Marshal's Office, Automatic Fire Sprinkler Plan Submittal Form (firemarshal.utah.gov/wp-content/uploads/Automatic-Fire-Sprinkler-Plan-Submittal-Form-2022-R.pdf), fetched and read directly 2026-07-22: 'SQUARE FEET x .022$ = $______ Note: Minimum fee is $75.' Fees must be paid before plan review will be released. Nephi's own Fee Schedule Report has no competing/duplicate local sprinkler fee line item.
Fire Alarm Plan Review FeeSquare footage x $0.022 per square foot; $75.00 minimumUtah State Fire Marshal's Office, Fire Alarm Plan Review Submittal Form (firemarshal.utah.gov/wp-content/uploads/Fire-Alarm-Submittal-Form-2023D-R.pdf), fetched and read directly 2026-07-22: identical 'SQUARE FT x .022$ = $ Note: Minimum fee is $75' formula as the sprinkler form. Nephi's own Fee Schedule Report has no competing/duplicate local alarm fee line item.
Building Permit Fee (associated construction)Based off valuation (no flat citywide table published)Same valuation-based Building Permit Fee documented on this file's Residential and Commercial Building Permit entries -- applies to the underlying construction accompanying the fire protection system, separately from the State Fire Marshal's plan-review fee above.

Change of Use / Change of Occupancy

Verified

Nephi does not publish a distinct Change of Use or Change of Occupancy application, checklist, or fee separate from its standard Building Permit process. The official Nephi City Building Permit Application (Rev. 12-6-23) itself captures a change of use directly on Page 1, with side-by-side 'Existing Use of Parcel' and 'Intended Use of Parcel' checkbox columns (Vacant, Commercial, Agriculture, Industrial, Single Family, Duplex, Multiple Units, Other/Specify) -- the same form used for new construction and remodels. Page 2 of the same application states directly: 'OCCUPANCY OF STRUCTURE IS PROHIBITED UNTIL AFTER FINAL INSPECTIONS AND CERTIFICATE OF OCCUPANCY IS ISSUED,' which functions as Nephi's change-of-occupancy control point. A full page-by-page review of Nephi's 26-page Fee Schedule Report (effective 6/16/2026, re-checked 2026-07-22) found no separate change-of-use or change-of-occupancy fee line item; a use change is fee-assessed under the same valuation-based Building Permit Fee (and Commercial Permit Plan Check Fee, where the change involves commercial space) documented on this file's other Building Permit entries.

Verified 2026-07-22 · Source

Requirements

  • A change in the use or occupancy classification of an existing parcel or structure within Nephi
  • Completed Nephi City Building Permit Application (Rev. 12-6-23), with the 'Existing Use of Parcel' and 'Intended Use of Parcel' columns on Page 1 both completed to reflect the change
  • Compliance with Nephi's underlying zoning for the intended use, verified through the Planning and Zoning function (contracted to Juab County) before the Building Department issues the permit
  • Any construction needed to accommodate the new use or occupancy classification permitted and inspected the same as new construction or tenant improvement work
  • Occupancy of the structure under the new use is prohibited until final inspections are complete and a Certificate of Occupancy is issued

Required documents

  • RequiredNephi City Building Permit Application (Rev. 12-6-23)Same two-page form used for new construction and remodels; the 'Existing Use of Parcel' / 'Intended Use of Parcel' checkbox columns on Page 1 are Nephi's mechanism for documenting a change of use. Nephi has no separate, distinctly-named Change of Use application.

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased off valuation (no flat citywide table published)Nephi City Fee Schedule Report (effective 6/16/2026, re-checked in full 2026-07-22): no separate change-of-use or change-of-occupancy fee line item exists anywhere in the 26-page document. A use change is assessed under the same valuation-based Building Permit Fee methodology documented on this file's Residential and Commercial Building Permit entries -- this is treated as the genuinely governing fee for a change of use, not an omission.
Commercial Permit Plan Check Fee (where applicable)$600.00 minimum per plan; $150.00 per hour for review time exceeding 4 hoursApplies where the change of use involves commercial space requiring plan review, per the same Commercial Permit Plan Check Fee documented on this file's Commercial Building Permit and Commercial Tenant Improvement Permit entries. Content-verified 2026-07-23 against the live Fee Schedule Report, effective 6/16/2026, consistent with those entries.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nephi building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-07)View current record →All versions →

Permalink: /utah/juab-county/nephi/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.