Shed & Accessory Structure Permit in Salt Lake City, Utah
Required for detached garages, sheds, carports, and other accessory structures over 200 square feet in Salt Lake City.
Verified 2026-06-27 · Source
When you need this permit
- Detached structures over 200 square feet
- Detached garages and carports
- Accessory structures with electrical or plumbing
- Structures over 10 feet in height
Required documents
- Req
Building Plans
Floor plan, elevations, and structural details
- Req
Site Plan
Structure location showing setbacks from property lines and other buildings
- Req
Foundation Details
Slab, pier, or post foundation design
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit | $75-$300 based on square footage | — |
| Plan Review | 50-65% of permit fee | — |
Review timeline
~5–14 business days
Typical estimate — confirm current times with the Salt Lake City building department
Inspection process
- 1
Foundation
Footings or slab prep before concrete pour
- 2
Framing
Structure framing, sheathing, and anchor connections
- 3
Final
Structure complete, roofing, siding, and any electrical or plumbing
Tips
- Sheds under 200 sq ft and under 10 feet tall in Salt Lake City may not require a building permit — but still must meet setbacks.
- Accessory structures in Salt Lake City typically require 5-foot side and rear setbacks — no structure in easements.
- If adding electricity to a shed or garage, a separate electrical permit is required.
- Prefab/kit sheds over 200 sq ft still need a permit in Salt Lake City — the permit is based on size, not construction method.
Frequently asked questions
- Do I need a permit for a shed in Salt Lake City?
- It depends on size. Sheds under 200 sq ft and under 10 feet tall are typically exempt from building permits in Salt Lake City, but must still comply with setback requirements. Larger structures require a permit.
- How close to the property line can I build a shed in Salt Lake City?
- Accessory structures in Salt Lake City typically require a minimum 5-foot setback from side and rear property lines. Corner lots have additional restrictions. Always verify setbacks with Salt Lake City before building.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
- Salt Lake City Building Services — official building department
- Salt Lake City Consolidated Fee Schedule (Ord. 2025-34)
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Salt Lake City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Salt Lake City
Related guides
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.