Mechanical / HVAC Permit in Salt Lake City, Utah
Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Salt Lake City. Governed by the 2024 International Mechanical Code (IMC) as adopted by Utah Code § 15A-2-103, effective 2026-07-01 (superseded the 2021 edition).
Verified 2026-06-29 · Source
When you need this permit
- Furnace or boiler installation or replacement
- Air conditioning system installation or replacement
- Ductwork installation or major modification
- Evaporative cooler installation
- Fireplace or wood-burning stove installation (may also require a gas permit)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Ductwork and gas piping installed, before walls closed — verify clearances and support
- 2
Final
Equipment operational, combustion air verified, gas pressure tested, thermostat functional
See the full Salt Lake City inspection guide — scheduling & re-inspection fees →
Tips
- Like-for-like furnace and AC replacements in Salt Lake City still require a mechanical permit.
- Salt Lake City follows the 2024 International Mechanical Code (IMC), effective July 1, 2026 (superseded the 2021 edition).
- High-efficiency furnaces require condensate drain lines — plan routing before installation.
- Gas line work typically requires a separate plumbing permit gas line inspection in addition to the mechanical permit for the appliance.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Salt Lake City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Salt Lake City
Mechanical / HVAC Permit in other cities
Compare mechanical / hvac permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Salt Lake City project checklist
Describe your project once and get every permit, document, and fee it triggers in Salt Lake City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →