Fire Sprinkler & Fire Extinguishing System Permit in Salt Lake City, Utah

Required for installation or modification of fire sprinkler systems, fire extinguishing systems, and standpipes in Salt Lake City. Separate from the building permit.

Verified 2026-06-29 · Source

When you need this permit

  • New fire sprinkler system installation
  • Modification or extension of existing fire sprinkler systems
  • Hood extinguishing system installation
  • Wet or dry standpipe installation

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Base FeeSLC Consolidated Fee Schedule, Ord. 2025-34, SLC Code § 18.56.040 (Fire Extinguishing Systems section)
$57
Automatic Fire Sprinklers in Range Hood or VentSLC Consolidated Fee Schedule, Ord. 2025-34
$8
Dry StandpipeSLC Consolidated Fee Schedule, Ord. 2025-34
$20 plus $3 each outlet
Fire PumpSLC Consolidated Fee Schedule, Ord. 2025-34
$59 each
Fire Sprinkler Systems — 1 to 100 sprinkler headsSLC Consolidated Fee Schedule, Ord. 2025-34
$49
Fire Sprinkler Systems — over 100 sprinkler headsSLC Consolidated Fee Schedule, Ord. 2025-34
$49 plus $0.1398 per head over 100
Hood Extinguishing SystemSLC Consolidated Fee Schedule, Ord. 2025-34
$49 each
Wet StandpipeSLC Consolidated Fee Schedule, Ord. 2025-34
$20 each, plus $2 each hose cabinet
Water Storage TankSLC Consolidated Fee Schedule, Ord. 2025-34
$20 each
Underground PipingSLC Consolidated Fee Schedule, Ord. 2025-34
$25
Re-Inspection FeeSLC Consolidated Fee Schedule, Ord. 2025-34
$129 per occurrence

Review timeline

Plan reviewTypical estimate — confirm current times with the Salt Lake City building department
~7–14 business days

How long did your Fire Sprinkler & Fire Extinguishing System Permit permit actually take in Salt Lake City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Piping installed, heads in place — before ceiling is closed

  2. 2

    Hydrostatic Test

    System pressure tested per NFPA requirements

  3. 3

    Final

    System operational, flow test complete

See the full Salt Lake City inspection guide — scheduling & re-inspection fees →

Tips

  • Fire sprinkler permit fees in SLC are based on the number of heads, not valuation — consult the Consolidated Fee Schedule (Ord. 2025-34) for the exact calculation.
  • SLC fire codes are governed by SLC Code Title 18, Chapter 44 — Fire Prevention and International Fire Code.
  • Coordinate sprinkler rough-in with the framing inspection — both must pass before insulation is installed.
  • The SLC Fire Alarm section is governed by SLC Code Title 18, Chapter 44; a separate fire alarm permit may be required from the Fire Department — contact SLC Fire at (801) 535-6306.

Frequently asked questions

Salt Lake City requires a fire sprinkler & fire extinguishing system permit for: New fire sprinkler system installation; Modification or extension of existing fire sprinkler systems; Hood extinguishing system installation; Wet or dry standpipe installation. If your project isn't listed, confirm with Salt Lake City Building Services at (801) 535-7968 before starting work.

Per the SLC Consolidated Fee Schedule (Ord. 2025-34): base fee $57, plus $49 for 1–100 heads, or $49 plus $0.1398 per head over 100. Fire pumps are $59 each. Hood extinguishing systems are $49 each. Dry standpipes are $20 plus $3 per outlet. Wet standpipes are $20 plus $2 per hose cabinet.

Plan review for a fire sprinkler & fire extinguishing system permit in Salt Lake City typically runs 7–14 business days. This is an estimate, not a published figure — confirm current review times with Salt Lake City Building Services at (801) 535-7968.

You'll need: Building Permit Application; Sprinkler Plans; Contractor License. See the required-documents checklist on this page for details on each.

Salt Lake City requires 3 inspection(s) for a fire sprinkler & fire extinguishing system permit, in order: Rough-In, Hydrostatic Test, Final. Schedule each through Salt Lake City Building Services ((801) 535-7968).

Apply through Salt Lake City Building Services at 451 South State Street, Salt Lake City, UT 84111. Phone: (801) 535-7968, email: permits@slcgov.com. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.slc.gov/buildingservices/.

Salt Lake City, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; Appendix AQ of the 2021 International Residential Code — Utah Code § 15A-2-103(1)(c); 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the 7/1/2026 code cycle; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); NOTE (verified 2026-07-16): The 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect 2026-07-01 per Utah Code § 15A-2-103, superseding the 2021 editions that governed through 2026-06-30. The 2021 IRC and 2023 NEC were NOT changed by this cycle. Confirmed directly against the version of § 15A-2-103 effective 7/1/2026 (superseded 1/1/2027) at le.utah.gov; the next scheduled version (1/1/2027) carries identical code editions, so this entry is not expected to go stale before then.. Local amendments apply — see the Salt Lake City overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Salt Lake City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.