Fence Permit in Salt Lake City, Utah

Required for fence installation in Salt Lake City. The SLC Consolidated Fee Schedule lists a flat fencing permit fee.

Verified 2026-06-29 · Source

When you need this permit

  • New fence construction
  • Replacement of existing fence (confirm with SLC Building Services whether replacement in the same location and same height requires a permit)
  • Fences over 6 feet in height

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fencing PermitSLC Consolidated Fee Schedule, Ord. 2025-34, SLC Code § 18.48.030 (Fencing Permit row of the main fee schedule)
$46

Review timeline

Plan reviewTypical estimate — confirm current times with the Salt Lake City building department
~1–5 business days

How long did your Fence Permit permit actually take in Salt Lake City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verify fence matches approved plan and meets height and setback requirements per SLC zoning code

See the full Salt Lake City inspection guide — scheduling & re-inspection fees →

Tips

  • Salt Lake City's fencing permit is a flat $46 fee per the Consolidated Fee Schedule (Ord. 2025-34) — one of the lowest-cost permit types.
  • Check SLC zoning code for fence height limits in your zone before installation — front yard and rear/side setback rules vary by zone.
  • Call 811 before digging fence post holes to locate underground utilities.
  • Fences in historic districts may require additional Historic Preservation review — contact SLC Historic Preservation at (801) 535-7625.

Frequently asked questions

Yes. Salt Lake City requires a fencing permit for new fence construction and modifications. The flat fee is $46 per the Consolidated Fee Schedule (Ord. 2025-34). Contact SLC Building Services at (801) 535-7155 to confirm whether your specific project requires a permit.

The fencing permit fee in Salt Lake City is a flat $46 per the Consolidated Fee Schedule (Ord. 2025-34, amended 06/10/2025).

Plan review for a fence permit in Salt Lake City typically runs 1–5 business days. This is an estimate, not a published figure — confirm current review times with Salt Lake City Building Services at (801) 535-7968.

You'll need: Building Permit Application. Depending on your project, Salt Lake City may also ask for: Site Plan. See the required-documents checklist on this page for details on each.

Salt Lake City requires 1 inspection(s) for a fence permit, in order: Final. Schedule each through Salt Lake City Building Services ((801) 535-7968).

Apply through Salt Lake City Building Services at 451 South State Street, Salt Lake City, UT 84111. Phone: (801) 535-7968, email: permits@slcgov.com. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.slc.gov/buildingservices/.

Salt Lake City, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; Appendix AQ of the 2021 International Residential Code — Utah Code § 15A-2-103(1)(c); 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the 7/1/2026 code cycle; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseding the 2021 edition (in force through 2026-06-30); NOTE (verified 2026-07-16): The 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC took effect 2026-07-01 per Utah Code § 15A-2-103, superseding the 2021 editions that governed through 2026-06-30. The 2021 IRC and 2023 NEC were NOT changed by this cycle. Confirmed directly against the version of § 15A-2-103 effective 7/1/2026 (superseded 1/1/2027) at le.utah.gov; the next scheduled version (1/1/2027) carries identical code editions, so this entry is not expected to go stale before then.. Local amendments apply — see the Salt Lake City overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Salt Lake City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.