Patio Cover & Pergola Permit in South Jordan, Utah
Required for attached or detached patio covers, pergolas, gazebos, and similar shade structures in South Jordan.
Verified 2026-06-27 · Source
When you need this permit
- Attached patio covers (connected to the house)
- Detached patio covers and pavilions over 200 sq ft
- Pergolas with solid roof panels
- Screened-in porches and three-season rooms
- Gazebos over 200 sq ft
Required documents
- Req
Building Plans
Structural details — post sizes, beam spans, rafter spacing, and attachment
- Req
Site Plan
Structure location showing setbacks from property lines
- Req
Footing Details
Post footing size and depth (below frost line)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit | $75-$250 based on square footage | — |
| Plan Review | 50-65% of permit fee | — |
Review timeline
~5–14 business days
Typical estimate — confirm current times with the South Jordan building department
Inspection process
- 1
Footings
Post footings excavated to proper depth, rebar, and forms
- 2
Framing
Posts, beams, rafters, and attachment to house (if attached)
- 3
Final
Roofing, electrical (if applicable), and completed structure
Tips
- Open-lattice pergolas with no solid roof may be exempt from permits in South Jordan — check local rules.
- Attached patio covers must not block bedroom egress windows.
- Footings in South Jordan must extend below frost line (typically 30 inches along the Wasatch Front).
- Solid-roof patio covers count toward lot coverage — verify you are within South Jordan maximum lot coverage.
Frequently asked questions
- Do I need a permit for a pergola in South Jordan?
- It depends. Open-lattice pergolas without solid roofing may be exempt in South Jordan. Pergolas with solid roof panels, attached structures, and any structure over 200 sq ft typically require a permit.
- Do I need a permit for a patio cover in South Jordan?
- Yes. Solid-roof patio covers in South Jordan require a building permit, whether attached or detached. They must meet structural, setback, and lot coverage requirements.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
- South Jordan Building Department — official building department
- South Jordan FY2025-2026 Fee Schedule
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in South Jordan
Related guides
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.