Grading & Excavation Permit — Unincorporated Utah County, Utah · Requirements sheet
Verified 2026-07-16 · Source: https://codev.utahcounty.gov/building
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Grading & Excavation Permit in Unincorporated Utah County, Utah
Required for significant grading, excavation, or land disturbance on properties in Unincorporated Utah County. The county fee schedule lists flat rates by volume.
Verified 2026-07-16 · Source
When you need this permit
- Grading or filling that changes drainage patterns
- Excavation deeper than 4 feet
- Land disturbance over 1 acre (state UPDES stormwater permit also required)
- Cut or fill exceeding limits set in the Utah County Land Use Ordinance
- Hillside grading in sensitive slope areas
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Show full citationHide
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate for grading of 10,001 cubic yards or more (and retaining walls). Note: retaining walls over 4 feet are otherwise $101.00. The codified schedule lists both grading tiers: $101.00 up to 10,000 cu yd; $303.00 for 10,001+ and retaining walls.Review timeline
Inspection process
- 1
Erosion Control
Silt fence, inlet protection, and stabilization measures in place before work begins
- 2
Rough Grade
Cut/fill completed, verify elevations match approved plan
- 3
Final Grade
Drainage verified, slopes stabilized, permanent landscaping or erosion control in place
See the full Unincorporated Utah County inspection guide — scheduling & re-inspection fees →
Tips
- Erosion control measures must be in place before any grading begins — silt fence at a minimum.
- Grading that alters drainage onto neighboring properties is prohibited — a drainage plan is required.
- Call 811 before any excavation to locate underground utilities.
- Disturbances over 1 acre also require a state UPDES stormwater permit from the Utah Division of Water Quality.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Utah County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Utah County's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Unincorporated Utah County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Unincorporated Utah County lands. Privacy.
Other permits in Unincorporated Utah County
Compare grading & excavation permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Utah County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Utah County — in one checklist. Free, for any city and any number of projects.
Get started →