Mechanical / HVAC Permit — Unincorporated Utah County, Utah · Requirements sheet
Verified 2026-07-16 · Source: https://codev.utahcounty.gov/building
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Mechanical / HVAC Permit in Unincorporated Utah County, Utah
Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Unincorporated Utah County. Governed by the 2024 International Mechanical Code (IMC) as adopted by Utah Code § 15A-2-103(1)(e), in force since July 1, 2026.
Verified 2026-07-16 · Source
When you need this permit
- Furnace or boiler installation or replacement (including like-for-like)
- Air conditioning system installation or replacement
- Ductwork installation or major modification
- Evaporative cooler installation
- Fireplace insert or wood-burning stove installation
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee.' Single flat rate covering replacement of AC units, furnaces, water heaters,… Show full citationHide
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee.' Single flat rate covering replacement of AC units, furnaces, water heaters, boilers, or similar equipment. The codified schedule lists the $101.00 replacement rate and a $303.00 'Adding Mechanical' rate.Review timeline
Inspection process
- 1
Rough-In
Ductwork and gas piping installed, before walls closed — verify clearances, support, and combustion air
- 2
Final
Equipment operational, combustion air verified, gas pressure tested, thermostat functional
See the full Unincorporated Utah County inspection guide — scheduling & re-inspection fees →
Tips
- Like-for-like furnace and AC replacements in Unincorporated Utah County still require a mechanical permit.
- The county follows the 2024 IMC (in force since July 1, 2026).
- High-efficiency furnaces require condensate drain lines — plan routing before installation.
- Gas line work may require a separate inspection; confirm with the Building Division at (801) 851-8342.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Utah County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Utah County's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Unincorporated Utah County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Unincorporated Utah County lands. Privacy.
Other permits in Unincorporated Utah County
Mechanical / HVAC Permit in other cities
Compare mechanical / hvac permit fees across Utah →
Look up this fee in a different city →