Mechanical / HVAC Permit — Unincorporated Utah County, Utah · Requirements sheet
Verified 2026-07-16 · Source: https://codev.utahcounty.gov/building
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Mechanical / HVAC Permit in Unincorporated Utah County, Utah
Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Unincorporated Utah County. Governed by the 2024 International Mechanical Code (IMC) as adopted by Utah Code § 15A-2-103(1)(e), in force since July 1, 2026.
Verified 2026-07-16 · Source
When you need this permit
- Furnace or boiler installation or replacement (including like-for-like)
- Air conditioning system installation or replacement
- Ductwork installation or major modification
- Evaporative cooler installation
- Fireplace insert or wood-burning stove installation
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Ductwork and gas piping installed, before walls closed — verify clearances, support, and combustion air
- 2
Final
Equipment operational, combustion air verified, gas pressure tested, thermostat functional
See the full Unincorporated Utah County inspection guide — scheduling & re-inspection fees →
Tips
- Like-for-like furnace and AC replacements in Unincorporated Utah County still require a mechanical permit.
- The county follows the 2024 IMC (in force since July 1, 2026).
- High-efficiency furnaces require condensate drain lines — plan routing before installation.
- Gas line work may require a separate inspection; confirm with the Building Division at (801) 851-8342.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Utah County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Utah County
Mechanical / HVAC Permit in other cities
Compare mechanical / hvac permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Utah County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Utah County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.