Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Wasatch County, Utah.

Verified 2026-07-13 · Source

How to schedule

Inspections are requested through the building department below.

Address
1891 W 3000 S, Heber City, UT 84032
Phone
(435) 657-3200
Office hours
7:30 AM to 5:30 PM, Monday–Friday, per the Wasatch County Building Department FAQ page (wasatchcounty.gov/215/Frequently-Asked-Questions). Building Department is distinct from the county's Engineering Department (435-657-3305, handles right-of-way/grading/subdivision permits) and Planning Department (435-657-3205, handles impact fees for multi-family/commercial and zoning).

Published scheduling rules

  • Fire Sprinkler Plans and Calculations, if required, must be present/uploaded to the inspection portal before the Rough Fire Sprinkler inspection — deferred from the initial complete-submittal requirement as of April 8, 2025, per the county's Single Family Dwelling checklist (already documented in this jurisdiction's residential-building-permit entry) (Fire Sprinkler & Fire Alarm Permit)

Inspection sequence

Applies to: Residential Building Permit (Single Family Dwelling, New Construction)

  1. 1

    Footing/Foundation

    Foundation and footing inspection consistent with the statewide-adopted 2024 IBC (Utah Code §15A-2-103(1)(a); Wasatch County's own checklist still names the 2021 IBC, live-checked 2026-07-16); specific county inspection checklist sequence beyond the plan-submission checklist not separately published online as of 2026-07-04.

  2. 2

    Framing

    Structural framing inspection; roof-framing inspection requires the Truss Package (if manufactured trusses are used) to have been uploaded to and approved on the inspection portal beforehand.

  3. 3

    Rough Fire Sprinkler

    Applicable if fire sprinklers are required; Fire Sprinkler Plans and Calculations must be onsite for this inspection.

  4. 4

    Gas Line Test & Schematic

    Gas Schematic must be onsite for this inspection.

  5. 5

    4-Way

    Manual J & D Heat Loss Calculations/Duct Design must be onsite for this inspection.

  6. 6

    Final

    Final building inspection; certificate of occupancy takes approximately 7-10 business days after final inspection passes to receive necessary signatures, per the Building Permit FAQ.

Applies to: Commercial Building Permit

  1. 1

    Footing/Foundation

    Foundation and footing inspection; no commercial-specific inspection sequence is separately published by the county beyond the general plan-submission checklist requirements.

  2. 2

    Framing

    Structural framing inspection.

  3. 3

    Final

    Final building inspection; certificate of occupancy takes approximately 7-10 business days after final inspection passes to receive necessary signatures, per the Building Permit FAQ.

Applies to: Solar PV Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing — not separately published for solar by the county; follows the standard MEP rough-in sequence documented for this jurisdiction's residential-building-permit entry.

  2. 2

    Final

    Panel/array mounting and electrical connections verified — not separately published for solar by the county; follows the standard final inspection documented for this jurisdiction's residential-building-permit entry.

Unincorporated Wasatch County building permits

Get alerts for Unincorporated Wasatch County

We'll email you when Unincorporated Wasatch County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.