Residential Building Permit (Single Family Dwelling, New Construction) — Unincorporated Wasatch County, Utah · Requirements sheet
Verified 2026-07-13 · Source: https://www.wasatchcounty.gov/DocumentCenter/View/1032/Checklist-Single-Family-Dwelling
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (Single Family Dwelling, New Construction) in Unincorporated Wasatch County, Utah
Required for new single-family dwelling construction in unincorporated Wasatch County. The 2021 IRC governs architectural design (unchanged) and the 2024 IBC governs structural design per Utah Code §15A-2-103, though the county's own Single Family Dwelling plan-submission checklist still directs applicants to the 2021 IBC for structural design (live-checked 2026-07-16) — confirm with the Building Department which edition current plan review actually applies. Fees are assessed on a per-square-foot basis for the Building Department portion, per the county's Building Permit FAQ.
Verified 2026-07-13 · Source
When you need this permit
- New single-family dwelling construction
- Construction plans designed to and reflecting the 2021 IRC (architectural, unchanged per Utah Code §15A-2-103(1)(b)) and the 2024 IBC (structural, per §15A-2-103(1)(a)); Wasatch County's own checklist still names the 2021 IBC for structural design (live-checked 2026-07-16)
- Structural engineering calculations designed to the 2024 IBC (governs per §15A-2-103(1)(a)), stamped and signed by the engineer of record; Wasatch County's own checklist still names the 2021 IBC (live-checked 2026-07-16)
- Res-Check energy compliance documentation (or a minimum insulation table on the plan set cover sheet if Res-Check is not provided); a passing score of 5% or better is required if using the Utah Energy Conservation Code
- Septic Approval Letter, if the property uses or will use a septic system (contact Wasatch County Health Department, (435) 657-3264)
- Engineering Permit (separate, from the county's Engineering Department) required in addition to the building permit if total disturbed area on a parcel over 1 acre is 1 acre or more
- Fire Hazard Severity Form and Landscape Plan, if the property is in a Wildland Fire area
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing/Foundation
Foundation and footing inspection consistent with the statewide-adopted 2024 IBC (Utah Code §15A-2-103(1)(a); Wasatch County's own checklist still names the 2021 IBC, live-checked 2026-07-16); specific county inspection checklist sequence beyond the plan-submission checklist not separately published online as of 2026-07-04.
- 2
Framing
Structural framing inspection; roof-framing inspection requires the Truss Package (if manufactured trusses are used) to have been uploaded to and approved on the inspection portal beforehand.
- 3
Rough Fire Sprinkler
Applicable if fire sprinklers are required; Fire Sprinkler Plans and Calculations must be onsite for this inspection.
- 4
Gas Line Test & Schematic
Gas Schematic must be onsite for this inspection.
- 5
4-Way
Manual J & D Heat Loss Calculations/Duct Design must be onsite for this inspection.
- 6
Final
Final building inspection; certificate of occupancy takes approximately 7-10 business days after final inspection passes to receive necessary signatures, per the Building Permit FAQ.
See the full Unincorporated Wasatch County inspection guide — scheduling & re-inspection fees →
Tips
- The Plan Review Fee is invoiced by email AFTER you submit for review — it is not collected at the time of initial application, and only online payment (check or card) is accepted; no in-office payments.
- As of April 8, 2025, Gas Schematics, Manual J & D Heat Loss Calculations, Fire Sprinkler Plans, and Truss Packages are no longer required for a COMPLETE submittal, but each is still required to be present onsite/uploaded before its corresponding inspection (Gas Line Test & Schematic, 4-Way, Rough Fire Sprinkler, and roof framing inspection, respectively).
- If your parcel is over 1 acre and total disturbed area (structure footprint + driveways/parking) reaches 1 acre or more, you need a separate Engineering Permit from the county's Engineering Department in addition to your building permit.
- The $1.25/sq ft Building Department fee figure published in the county's own FAQ is explicitly dated to June 2016 and described as an average — confirm current per-project costs directly with the Building Department at (435) 657-3200.
- The County Impact Fee for a new single-family residence drops from $3,085 to just $278 if the property is within Wallsburg Town — a large jurisdictional carve-out worth confirming if your parcel is near that boundary.
- EV charger (EVSE) installation is treated as standard electrical work under this same Building Permit process — the county's official Building Permit FAQ (wasatchcounty.gov/215/Frequently-Asked-Questions, live-checked 2026-07-19) itemizes 'Other Fees' (temp power, Solid Waste SSD garbage fee, Fire/Water/Sewer/Power district fees) with no separate electrical trade-permit line and no EV-charger or electric-vehicle-charging line item anywhere on the page. Confirm project-specific requirements with the Building Department at (435) 657-3200.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Wasatch County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Wasatch County
Residential Building Permit (Single Family Dwelling, New Construction) in other cities
Compare residential building permit (single family dwelling, new construction) fees across Utah →
Look up this fee in a different city →