EV Charger / EVSE Permit in Unincorporated Wasatch County, Utah
Wasatch County does not publish a distinct EV charger / EVSE permit type or fee line item. EV charger (EVSE) installation is treated as standard electrical work under the same general Building Permit process used for all other permit types — the county's official Building Permit FAQ (wasatchcounty.gov/215/Frequently-Asked-Questions, live-checked 2026-07-19, re-checked 2026-07-20) itemizes 'Other Fees' (Temporary Power $75.00, Solid Waste SSD Garbage Fee, Fire/Water/Sewer/Power district fees) with no separate electrical trade-permit line and no EV-charger or electric-vehicle-charging line item anywhere on the page. Because Wasatch County does not publish a distinct standalone Electrical Permit fee line either (unlike Murray or several other Utah cities in this corpus), an EV charger installation is billed under the same general per-square-foot Building Department fee mechanism documented for this jurisdiction's residential-building-permit entry.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Wasatch County — treated as standard electrical work under the county's general Building Permit process
- Building Permit Application submitted through the county's online Plan Review Portal (wasatchcounty.gov/Building)
- Compliance with the 2023 NEC, which governs statewide per Utah Code § 15A-2-103(1)(g)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical
Not separately published for EV chargers by the county; follows the standard rough-in and final electrical inspection sequence documented for this jurisdiction's residential-building-permit entry.
See the full Unincorporated Wasatch County inspection guide — scheduling & re-inspection fees →
Tips
- Wasatch County treats EV charger installation as ordinary electrical work under its general Building Permit process — there is no dedicated EV-charger permit type, application, or fee category.
- Unlike some Utah cities in this corpus (e.g. Murray), Wasatch County does not publish a distinct standalone Electrical Permit fee line at all — confirm the applicable fee for a standalone EV charger installation directly with the Building Department, (435) 657-3200.
- The Plan Review Fee (65% of the Building Department fee) is invoiced by email after submittal, not collected at time of application — online payment only.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Wasatch County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Wasatch County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Wasatch County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Wasatch County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →