EV Charger / EVSE Permit in Unincorporated Wasatch County, Utah

Wasatch County does not publish a distinct EV charger / EVSE permit type or fee line item. EV charger (EVSE) installation is treated as standard electrical work under the same general Building Permit process used for all other permit types — the county's official Building Permit FAQ (wasatchcounty.gov/215/Frequently-Asked-Questions, live-checked 2026-07-19, re-checked 2026-07-20) itemizes 'Other Fees' (Temporary Power $75.00, Solid Waste SSD Garbage Fee, Fire/Water/Sewer/Power district fees) with no separate electrical trade-permit line and no EV-charger or electric-vehicle-charging line item anywhere on the page. Because Wasatch County does not publish a distinct standalone Electrical Permit fee line either (unlike Murray or several other Utah cities in this corpus), an EV charger installation is billed under the same general per-square-foot Building Department fee mechanism documented for this jurisdiction's residential-building-permit entry.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Wasatch County — treated as standard electrical work under the county's general Building Permit process
  • Building Permit Application submitted through the county's online Plan Review Portal (wasatchcounty.gov/Building)
  • Compliance with the 2023 NEC, which governs statewide per Utah Code § 15A-2-103(1)(g)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Department portion (general, applies to EV charger/EVSE installation)Wasatch County Building Permit FAQ (wasatchcounty.gov/215/Frequently-Asked-Questions), re-fetched 2026-07-20: 'Permit fees are based on square footage and vary from project to project... the average cost for the Building Department portion of the permit is around $1.25 per sq. ft.' (figure dated June 2016 but still the county's own currently-published guidance). No EV-charger-specific or general standalone-electrical-permit fee line was found published anywhere on wasatchcounty.gov as of this 2026-07-20 re-check; the county's FAQ 'Other Fees' section lists only Temporary Power ($75.00), Solid Waste SSD, and Special Service District fees, with no electrical trade-permit or EV-specific line item. Contact the Building Department at (435) 657-3200 for a project-specific quote.
approximately $1.25 per square foot where new square footage/valuation applies; for a standalone electrical alteration with no added square footage, no distinct dollar figure is published
Plan Review FeeWasatch County Building Permit FAQ.
65% of the Building Department fee (varies from project to project)

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Unincorporated Wasatch County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical

    Not separately published for EV chargers by the county; follows the standard rough-in and final electrical inspection sequence documented for this jurisdiction's residential-building-permit entry.

See the full Unincorporated Wasatch County inspection guide — scheduling & re-inspection fees →

Tips

  • Wasatch County treats EV charger installation as ordinary electrical work under its general Building Permit process — there is no dedicated EV-charger permit type, application, or fee category.
  • Unlike some Utah cities in this corpus (e.g. Murray), Wasatch County does not publish a distinct standalone Electrical Permit fee line at all — confirm the applicable fee for a standalone EV charger installation directly with the Building Department, (435) 657-3200.
  • The Plan Review Fee (65% of the Building Department fee) is invoiced by email after submittal, not collected at time of application — online payment only.

Frequently asked questions

Unincorporated Wasatch County requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Wasatch County — treated as standard electrical work under the county's general Building Permit process; Building Permit Application submitted through the county's online Plan Review Portal (wasatchcounty.gov/Building); Compliance with the 2023 NEC, which governs statewide per Utah Code § 15A-2-103(1)(g). If your project isn't listed, confirm with Wasatch County Building Department at (435) 657-3200 before starting work.

No distinct fee figure is published. The general Building Department fee mechanism (approximately $1.25 per square foot where applicable, plus a 65% Plan Review Fee) governs building-permit work generally, but Wasatch County does not publish a standalone electrical-permit or EV-charger-specific dollar figure. Contact the Building Department at (435) 657-3200 for a project-specific quote.

Unincorporated Wasatch County does not publish a plan-review timeline for this permit. Contact Wasatch County Building Department at (435) 657-3200 for current turnaround.

You'll need: Building Permit Application (online, via Plan Review Portal). Depending on your project, Unincorporated Wasatch County may also ask for: Electrical Single-Line Diagram / Equipment Specifications. See the required-documents checklist on this page for details on each.

Unincorporated Wasatch County requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical. Schedule each through Wasatch County Building Department ((435) 657-3200).

Apply through Wasatch County Building Department at 1891 W 3000 S, Heber City, UT 84032. Phone: (435) 657-3200, email: Bldinfo@wasatch.utah.gov. Office hours: 7:30 AM to 5:30 PM, Monday–Friday, per the Wasatch County Building Department FAQ page (wasatchcounty.gov/215/Frequently-Asked-Questions). Building Department is distinct from the county's Engineering Department (435-657-3305, handles right-of-way/grading/subdivision permits) and Planning Department (435-657-3205, handles impact fees for multi-family/commercial and zoning).. Official information: https://www.wasatchcounty.gov/211/Building-Department.

Unincorporated Wasatch County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — governs per Utah Code §15A-2-103(1)(a) (https://le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), in force statewide since 7/1/2026 and binding on counties under §15A-1-204. Wasatch County's own 'Plan Submission Requirements - Single Family Dwelling' checklist (wasatchcounty.gov/DocumentCenter/View/1032/Checklist-Single-Family-Dwelling) still states plans 'must be designed to and reflect... 2021 International Building Code for structural' (no appendices cited) — live-checked 2026-07-16, the county's own checklist has not been updated to the current statewide edition.; 2021 International Residential Code (IRC), including Appendix AQ — governs per Utah Code §15A-2-103(1)(b)/(c); this edition is UNCHANGED from the prior code cycle. Wasatch County's own checklist states plans 'must be designed to and reflect the 2021 International Residential Code for architectural' (no distinct Appendix AQ citation) — live-checked 2026-07-16, consistent with the current statute on the base edition.; 2024 International Plumbing Code (IPC) — governs per Utah Code §15A-2-103(1)(d). Not separately listed on Wasatch County's own Building Department pages, Forms & Checklists index (wasatchcounty.gov/380), or the Single Family Dwelling checklist — live-checked 2026-07-16; per Utah's Title 15A compliance-agency model (§15A-1-202), unincorporated Wasatch County is bound by this statewide-adopted edition absent its own published amendment.; 2024 International Mechanical Code (IMC) — governs per Utah Code §15A-2-103(1)(e). Not separately listed on Wasatch County's own pages — live-checked 2026-07-16; bound by the statewide-adopted edition per §15A-1-202, absent its own published amendment.; 2024 International Fuel Gas Code (IFGC) — governs per Utah Code §15A-2-103(1)(f). Not separately listed on Wasatch County's own pages — live-checked 2026-07-16; bound by the statewide-adopted edition per §15A-1-202, absent its own published amendment.; 2023 National Electrical Code (NEC) — governs per Utah Code §15A-2-103(1)(g); this edition is UNCHANGED from the prior code cycle. Not separately listed on Wasatch County's own pages — live-checked 2026-07-16; bound by the statewide-adopted edition per §15A-1-202, absent its own published amendment.; 2024 International Energy Conservation Code (IECC) — one code, no residential/commercial split, per Utah Code §15A-2-103(1)(h). Wasatch County's own checklist references only 'the Utah Energy Conservation Code' without citing an ICC edition number ('If using the Utah Energy Conservation Code, the ResCheck must have a passing score of 5% or better') — live-checked 2026-07-16, still no edition cited; the current statewide edition is stated here rather than the prior 2021 edition previously assumed.; 2024 International Existing Building Code (IEBC) — governs per Utah Code §15A-2-103(1)(i). Not separately listed on Wasatch County's own pages — live-checked 2026-07-16; bound by the statewide-adopted edition per §15A-1-202, absent its own published amendment.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — governs per Utah Code §15A-2-103(1)(n). Not separately listed on Wasatch County's own pages — live-checked 2026-07-16; bound by the statewide-adopted edition per §15A-1-202, absent its own published amendment.; Modular Building Institute (MBI) Standards 1200 and 1205 — governs statewide per Utah Code §15A-2-103(1)(o). Not listed on Wasatch County's own pages — live-checked 2026-07-16.; 2006 Utah Wildland Urban Interface Code, adopted under Utah Code §15A-2-103(2) — referenced directly on the same county checklist for site-plan defensible-space requirements ('defensible space provisions and elevations, if required by the Utah Wildland Urban Interface Code adopted under Section 15A-2-103').; 2026-07-16 codesAdopted re-verification: Utah Code §15A-2-103 (live-checked at the canonical le.utah.gov URL, current version 'Effective 7/1/2026') now governs statewide construction codes for counties per §15A-1-204, adopting 2024 IBC/IPC/IMC/IFGC/IEBC/IECC and residential 2024 ISPSC, while IRC stays 2021 (App AQ) and NEC stays 2023. Wasatch County's own Single Family Dwelling checklist (live-checked 2026-07-16, re-fetched and confirmed unchanged from the prior review) still names only '2021 International Residential Code' (architectural) and '2021 International Building Code' (structural), with no separate citation for IPC, IMC, IFGC, NEC, IECC edition, IEBC, ISPSC, or MBI Standards — reported verbatim as the county's own published text; the statute is stated as governing above rather than silently assumed.. Local amendments apply — see the Unincorporated Wasatch County overview page for the full list.

No. The county's Building Permit FAQ lists no EV-charger or electric-vehicle-charging line item under its 'Other Fees' section. EV/EVSE installation is treated as standard electrical work under the county's general Building Permit process.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Wasatch County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.