Building Permit in Kennewick, Washington

Required for construction in Kennewick. The city adopts the current state building and residential codes without naming an edition, but keeps its permit fee table from a 1997 model code.

Reviewed 2026-09-16 · Source

When you need this permit

  • Built to the International Building Code or International Residential Code as adopted by the State of Washington - KMC 15.08.010 names no edition year
  • IBC appendix chapters C and J and IRC appendix chapters G and K are adopted
  • A completed application is judged by IBC Section 105.3 / IRC R105.3 criteria
  • Annual permits are not available - IBC 105.1.1 and 105.1.2 are not adopted

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building permit fee
KENNEWICK'S PERMIT FEE TABLE IS IN A CODE PUBLISHED IN 1997, AND THIS GUIDE DOES NOT REPRINT IT. Show full citationKENNEWICK'S PERMIT FEE TABLE IS IN A CODE PUBLISHED IN 1997, AND THIS GUIDE DOES NOT REPRINT IT. KMC 15.08.010 adopts the International Building Code "(with the exception of Section 108.2 which Table 1-A shall be adopted from the 1997 Edition of the Uniform Building Code)" and does the same to the residential code at R108.2. Section 108.2 is the permit fee provision, so the fee schedule is Table 1-A of the 1997 Uniform Building Code - a model code superseded long ago. The same section keeps "grading fee schedules Table A-33-A and Table 33-B of the 1997 Uniform Building Code". THOSE TABLES WERE NOT OPENED FOR THIS ENTRY, so no amount is stated here. Ask the City of Kennewick which edition of Table 1-A it applies and whether any multiplier or update has been adopted since - the code's own adoption was last amended in 2013.
Set by 1997 UBC Table 1-A - see notes

Review timeline

Plan review
Not published — contact the department

How long did your Building Permit permit actually take in Kennewick?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • The permit fee table is Table 1-A of the 1997 Uniform Building Code, not the modern code
    • Check the publisher's "Adopted Ordinances Not Yet Codified" list before relying on a section
    • A complete application does not freeze SEPA conditions

    Frequently asked questions

    Kennewick requires a building permit for: Built to the International Building Code or International Residential Code as adopted by the State of Washington - KMC 15.08.010 names no edition year; IBC appendix chapters C and J and IRC appendix chapters G and K are adopted; A completed application is judged by IBC Section 105.3 / IRC R105.3 criteria; Annual permits are not available - IBC 105.1.1 and 105.1.2 are not adopted. If your project isn't listed, confirm with City of Kennewick at 509-585-4200 before starting work.

    In Kennewick, the published Building permit fee is: Set by 1997 UBC Table 1-A - see notes. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Kennewick does not publish a plan-review timeline for this permit. Contact City of Kennewick at 509-585-4200 for current turnaround.

    You'll need: Completed building permit application. See the required-documents checklist on this page for details on each.

    Apply through City of Kennewick at 210 W 6th Ave, Kennewick, WA 99336. Phone: 509-585-4200. Office hours: 8:30am-4:30pm, Monday to Friday. Official information: https://www.go2kennewick.com/.

    Kennewick, Washington has adopted: KENNEWICK NAMES NO EDITION FOR EITHER CODE. KMC 15.08.010(1): "The International Building Code shall be adopted ... with appendix chapters C and J (WAC 51-50-003)". Subsection (2): "The International Residential Code shall be adopted, as amended by the State of Washington ... with appendix chapters G and K (WAC 51-50-003)." The reference is to the WAC chapter, not to a year.; BUT ONE 1997 CODE IS DELIBERATELY KEPT ALIVE INSIDE THAT ADOPTION. Both subsections except the permit fee provision: the IBC is adopted "(with the exception of Section 108.2 which Table 1-A shall be adopted from the 1997 Edition of the Uniform Building Code)" and the IRC "(with the exception of Section R108.2 which Table 1-A shall be adopted from the 1997 Edition of the Uniform Building Code)". Grading fees likewise come from "Table A-33-A and Table 33-B of the 1997 Uniform Building Code".; FOUR PROVISIONS ARE EXPRESSLY NOT ADOPTED: "Subsections 101.4.1 Electrical, 105.1.1 Annual Permits, 105.1.2 Annual Permit Records, 107.3 Temporary Power, not adopted" from the IBC, and "Subsection R107.3 Temporary Power, not adopted" from the IRC. So the annual permit the model code allows is unavailable here, as it is in Camas, and there is no temporary power provision.; THE ADOPTION ITSELF HAS NOT BEEN RE-ENACTED SINCE 2013. KMC 15.08.010 carries "(Ord. 5496 Sec. 1, 2013; Ord. 5404 Sec. 1, 2012; Ord. 5311 Sec. 1, 2010 ...)". Because the adoption names no edition, the current state code still applies - but the 1997 carve-outs have travelled unchanged through every re-enactment.; RCW 19.27 - the Washington State Building Code applies statewide.. Local amendments apply — see the Kennewick overview page for the full list.

    From a 1997 code. KMC 15.08.010 adopts the International Building Code except that at Section 108.2 - the permit fee provision - "Table 1-A shall be adopted from the 1997 Edition of the Uniform Building Code", and the same applies to the residential code at R108.2. Grading fees come from Table A-33-A and Table 33-B of the same 1997 code. This guide has not opened those tables, so ask the city for the current figures and whether any multiplier applies.

    KMC 15.04.080 says a building permit "is in effect under this Title and Title 18 when a completed application has been submitted", with completeness judged by IBC Section 105.3 and IRC R105.3. Note the express limit: it "do[es] not limit or affect conditions imposed under Chapter 43.21C RCW" - the State Environmental Policy Act - so environmental conditions are not frozen. Other Washington cities word their vesting quite differently.

    Sources & verification

    Key facts verified against official sources. Last reviewed 2026-09-16.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kennewick building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Kennewick's permit history isn't searchable here yet

    This page covers what the permit requires. What we don't have for Kennewick yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

    Your email, and the place — never an address. We only use it to tell you when Kennewick lands. Privacy.

    Other permits in Kennewick

    Compare building permit fees across Washington

    Look up this fee in a different city →

    Embed this data card →

    Now live

    Build your Kennewick project checklist

    Describe your project once and get every permit, document, and fee it triggers in Kennewick — in one checklist. Free, for any city and any number of projects.

    Get started →