Electrical Permit — Longview, Washington · Requirements sheet
Verified 2026-09-16 · Source: https://ecode360.com/48938151
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electrical Permit in Longview, Washington
Electrical regulation in Longview is in transition: the codified electrical chapter is still published in full while an adopted ordinance repealing it has not yet been codified.
Verified 2026-09-16 · Source
When you need this permit
- LMC Chapter 16.24 ELECTRICAL CODE is still published complete — Article I Adoption By Reference (§ 16.24.010), Article II General Provisions (§§ 16.24.020–.120), Article III Authority (§§ 16.24.200–.220), Article IV Permits And Approvals (§§ 16.24.300–.390), Article V Plan Review (§ 16.24.400)
- THE PUBLISHER'S NEW LAWS PANEL ON THAT CHAPTER LISTS: “Ord. 3577 — Adopted 2026-04-09 — Buildings and Construction: Repeals Electrical Code — Affects Ch 16.24”
- Separately and already codified, LMC 16.02.020 deletes IBC “Section 101.4.8, Electrical”
- THE CODIFIED TEXT AND THE ADOPTED ORDINANCE DISAGREE. This entry reports both and resolves neither
- THE BODY OF CHAPTER 16.24 WAS NOT OPENED for this entry — only its article and section structure and the New Laws panel were read
- ASK THE CITY which applies before filing
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
No electrical fee is asserted. LMC Chapter 16.24 remains published with a Plan Review article, while Ord. Show full citationHide
No electrical fee is asserted. LMC Chapter 16.24 remains published with a Plan Review article, while Ord. 3577 (adopted 2026-04-09) is listed as repealing that chapter and is not yet reflected in the codified text. Where the fee lands depends on which of the two governs, which this entry does not determine.Review timeline
Inspection process
Tips
- Do not rely on this guide, or on the published chapter, for electrical in Longview. LMC Chapter 16.24 still reads as a complete electrical code with its own permit and plan review articles, and the publisher simultaneously lists Ord. 3577, adopted 2026-04-09, as repealing it. Those cannot both describe the current position, and the city is the only authority on which one does.
- One corroborating detail if you are trying to read the direction of travel: LMC 16.02.020 already deletes IBC Section 101.4.8, the provision that would otherwise apply the building code to electrical work. That deletion is codified and predates Ord. 3577, so the city was narrowing its electrical role before the repeal was adopted.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-09-16.
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Longview building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Longview's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Longview yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Longview lands. Privacy.
Other permits in Longview
Electrical Permit in other cities
Compare electrical permit fees across Washington →
Look up this fee in a different city →
Now live
Build your Longview project checklist
Describe your project once and get every permit, document, and fee it triggers in Longview — in one checklist. Free, for any city and any number of projects.
Get started →