When you need this permit

  • MAPLE VALLEY GIVES EACH GAS CODE ITS OWN NUMBERED SECTION, WHICH NO OTHER CITY IN THIS SET DOES: MVMC 15.05.090 International Fuel Gas Code, 15.05.100 National Fuel Gas Code (NFPA 54), and 15.05.110 Liquefied Petroleum Gas Code (NFPA 58). Elsewhere these standards are named inside a mechanical adoption sentence, if at all.
  • NFPA 58 GETS ITS OWN NUMBERED SECTION HERE, WHICH NO OTHER CITY IN THIS SET DOES, AND IT NAMES 2020 WHILE EVERYTHING AROUND IT NAMES 2021. MVMC 15.05.110: “There is adopted … that certain code known as the Liquefied Petroleum Gas Code, 2020 Edition, as adopted by the State Building Code Council in Chapter 51-52 WAC, as published by NFPA.” The National Fuel Gas Code (NFPA 54) has its own section at 15.05.100 in the same form. >>> FIVE CITIES IN THIS SERIES NOW NAME AN NFPA 58 EDITION AND THEY SPLIT FOUR TO ONE: Lake Stevens, Issaquah, Walla Walla and Maple Valley say 2020; University Place says 2021. A MAJORITY IS NOT AN ADJUDICATION and this entry does not treat it as one — the error that started this thread was never a miscount, it was letting agreement end the search. >>> AND THE ATTRIBUTION IS CHECKABLE, SO IT WAS CHECKED, AND IT DID NOT CORROBORATE. Maple Valley attributes the 2020 edition to the State Building Code Council's adoption in Chapter 51-52 WAC. WAC 51-52-003, read at app.leg.wa.gov on 2026-09-16, adopts only “The 2021 edition of the International Mechanical Code” and contains NO occurrence of “NFPA”. THAT NEITHER CONFIRMS NOR REFUTES THE 2020 VALUE: the chapter's exception sections and the mechanical code's own referenced-standards list were NOT read, and NFPA 58 may reach the city through either. What is established is only that the section Maple Valley points at does not itself name NFPA 58.
  • WITHIN THIS ONE CHAPTER THE EDITION YEARS SORT BY PUBLISHER, WHICH IS THE SECOND CITY TO SHOW THAT PATTERN IN ITS OWN TEXT. The ICC and IAPMO documents are all 2021 — IBC, IRC, UPC, IMC — while the NFPA document is 2020. Walla Walla shows the same split inside a single sentence. It is consistent with two standards bodies running separate revision cycles, and IT IS RECORDED AS A HYPOTHESIS AND NOT A FINDING, because University Place names NFPA 58 at 2021 and contradicts it, and because two cities agreeing is a sample of two.
  • MAPLE VALLEY NAMES ITS YEARS AND PUBLISHES NO ROLLING CLAUSE, WHICH IS UNUSUAL IN THIS SET, AND THE ABSENCE IS MEASURED RATHER THAN ASSUMED. A regular expression for the usual rolling formulations (“as now or hereafter amended”, “hereafter be amended”, “as presently constituted”, “as the same exists”, “as now in effect”, “as amended from time to time”, “as now existing”, “subsequently amended”) returns ZERO matches across the whole of Chapter 15.05 (31,082 characters) AND the whole of Chapter 15.01 (12,306 characters). A control term fired 11 times in the first and 85 in the second, so the search was alive and the zero is real. Walla Walla taught that a roll can hide in a section of its own; that check was run here and found nothing. >>> SO THE ENTRY RECORDS TWO READINGS AND ADJUDICATES NEITHER. On its face the adoption is named-and-static: each section names an edition and nothing says it moves. But every adopting sentence also reads “as adopted by the State Building Code Council in Chapter 51-xx WAC”, and that reference can be read as incorporating the state chapter, which does move. USEFULLY, THE TWO READINGS AGREE TODAY, AND THAT IS CHECKED AGAINST THE STATE SOURCE RATHER THAN ASSUMED: Chapter 51-52 WAC is titled “STATE BUILDING CODE ADOPTION AND AMENDMENT OF THE 2021 EDITION OF THE INTERNATIONAL MECHANICAL CODE” and WAC 51-52-003 reads “The 2021 edition of the International Mechanical Code published by the International Code Council is hereby adopted by reference”, read at app.leg.wa.gov on 2026-09-16. The city's named 2021 and the state's current adoption are the same edition, so the ambiguity is not biting at present.
  • MVMC 15.01.020 requires the City to “at all times keep on file with the City Clerk, for reference by the general public” copies of the adopted codes. With no rolling clause published, that filed copy is the practical way to establish which text the city is working from.
  • Appeal provisions sit at MVMC 15.01.035. This guide does not summarise them, so no appeal body, deadline or procedure is stated here.

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Permit fee
A WHOLE CHAPTER IS TITLED “FEE SCHEDULE” AND IT CONTAINS NO SCHEDULE. Show full citationA WHOLE CHAPTER IS TITLED “FEE SCHEDULE” AND IT CONTAINS NO SCHEDULE. MVMC Chapter 15.02 consists of a single section and a single sentence: “All fees associated with this title shall be as shown in the currently adopted Development Fee Schedule.” That is the entire chapter. NO DOLLAR AMOUNT APPEARS ANYWHERE IN TITLE 15, and the Development Fee Schedule is a separate document that was not opened for this entry. TWO THINGS ARE WORTH NOTING IN THAT ONE SENTENCE. It names the instrument — a “Development Fee Schedule”, so there is a document to ask for by name, unlike Des Moines where the code names only an officer. And “currently adopted” makes it roll: the schedule changes without the city amending its code, which is the one place in this Title where something is expressly kept current.
Set by Development Fee Schedule

Review timeline

Plan review
Not published — contact the department

How long did your Fuel gas permit permit actually take in Maple Valley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • THE PROPANE CODE IS NAMED AT 2020 WHILE EVERYTHING AROUND IT IS 2021. MVMC 15.05.110 adopts the Liquefied Petroleum Gas Code, 2020 Edition. Washington cities do not agree on this — four in this set name 2020 and University Place names 2021 — so confirm the operative edition with the Building Official rather than carrying a year across a city line.
    • BECAUSE EACH GAS CODE HAS ITS OWN SECTION HERE, a search of the mechanical section alone will miss them. Look at MVMC 15.05.090, .100 and .110 together before assuming which standard governs your installation.

    Frequently asked questions

    Maple Valley requires a fuel gas permit for: MAPLE VALLEY GIVES EACH GAS CODE ITS OWN NUMBERED SECTION, WHICH NO OTHER CITY IN THIS SET DOES: MVMC 15.05.090 International Fuel Gas Code, 15.05.100 National Fuel Gas Code (NFPA 54), and 15.05.110 Liquefied Petroleum Gas Code (NFPA 58). Elsewhere these standards are named inside a mechanical adoption sentence, if at all.; NFPA 58 GETS ITS OWN NUMBERED SECTION HERE, WHICH NO OTHER CITY IN THIS SET DOES, AND IT NAMES 2020 WHILE EVERYTHING AROUND IT NAMES 2021. MVMC 15.05.110: “There is adopted … that certain code known as the Liquefied Petroleum Gas Code, 2020 Edition, as adopted by the State Building Code Council in Chapter 51-52 WAC, as published by NFPA.” The National Fuel Gas Code (NFPA 54) has its own section at 15.05.100 in the same form. >>> FIVE CITIES IN THIS SERIES NOW NAME AN NFPA 58 EDITION AND THEY SPLIT FOUR TO ONE: Lake Stevens, Issaquah, Walla Walla and Maple Valley say 2020; University Place says 2021. A MAJORITY IS NOT AN ADJUDICATION and this entry does not treat it as one — the error that started this thread was never a miscount, it was letting agreement end the search. >>> AND THE ATTRIBUTION IS CHECKABLE, SO IT WAS CHECKED, AND IT DID NOT CORROBORATE. Maple Valley attributes the 2020 edition to the State Building Code Council's adoption in Chapter 51-52 WAC. WAC 51-52-003, read at app.leg.wa.gov on 2026-09-16, adopts only “The 2021 edition of the International Mechanical Code” and contains NO occurrence of “NFPA”. THAT NEITHER CONFIRMS NOR REFUTES THE 2020 VALUE: the chapter's exception sections and the mechanical code's own referenced-standards list were NOT read, and NFPA 58 may reach the city through either. What is established is only that the section Maple Valley points at does not itself name NFPA 58.; WITHIN THIS ONE CHAPTER THE EDITION YEARS SORT BY PUBLISHER, WHICH IS THE SECOND CITY TO SHOW THAT PATTERN IN ITS OWN TEXT. The ICC and IAPMO documents are all 2021 — IBC, IRC, UPC, IMC — while the NFPA document is 2020. Walla Walla shows the same split inside a single sentence. It is consistent with two standards bodies running separate revision cycles, and IT IS RECORDED AS A HYPOTHESIS AND NOT A FINDING, because University Place names NFPA 58 at 2021 and contradicts it, and because two cities agreeing is a sample of two.; MAPLE VALLEY NAMES ITS YEARS AND PUBLISHES NO ROLLING CLAUSE, WHICH IS UNUSUAL IN THIS SET, AND THE ABSENCE IS MEASURED RATHER THAN ASSUMED. A regular expression for the usual rolling formulations (“as now or hereafter amended”, “hereafter be amended”, “as presently constituted”, “as the same exists”, “as now in effect”, “as amended from time to time”, “as now existing”, “subsequently amended”) returns ZERO matches across the whole of Chapter 15.05 (31,082 characters) AND the whole of Chapter 15.01 (12,306 characters). A control term fired 11 times in the first and 85 in the second, so the search was alive and the zero is real. Walla Walla taught that a roll can hide in a section of its own; that check was run here and found nothing. >>> SO THE ENTRY RECORDS TWO READINGS AND ADJUDICATES NEITHER. On its face the adoption is named-and-static: each section names an edition and nothing says it moves. But every adopting sentence also reads “as adopted by the State Building Code Council in Chapter 51-xx WAC”, and that reference can be read as incorporating the state chapter, which does move. USEFULLY, THE TWO READINGS AGREE TODAY, AND THAT IS CHECKED AGAINST THE STATE SOURCE RATHER THAN ASSUMED: Chapter 51-52 WAC is titled “STATE BUILDING CODE ADOPTION AND AMENDMENT OF THE 2021 EDITION OF THE INTERNATIONAL MECHANICAL CODE” and WAC 51-52-003 reads “The 2021 edition of the International Mechanical Code published by the International Code Council is hereby adopted by reference”, read at app.leg.wa.gov on 2026-09-16. The city's named 2021 and the state's current adoption are the same edition, so the ambiguity is not biting at present.; MVMC 15.01.020 requires the City to “at all times keep on file with the City Clerk, for reference by the general public” copies of the adopted codes. With no rolling clause published, that filed copy is the practical way to establish which text the city is working from.; Appeal provisions sit at MVMC 15.01.035. This guide does not summarise them, so no appeal body, deadline or procedure is stated here.. If your project isn't listed, confirm with City of Maple Valley at (425) 413-8800 before starting work.

    In Maple Valley, the published Permit fee is: Set by Development Fee Schedule. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Maple Valley does not publish a plan-review timeline for this permit. Contact City of Maple Valley at (425) 413-8800 for current turnaround.

    You'll need: Building permit application; Current Development Fee Schedule. See the required-documents checklist on this page for details on each.

    Apply through City of Maple Valley at 22017 SE Wax Road, Suite 200, Maple Valley, WA 98038. Phone: (425) 413-8800. Official information: https://www.maplevalleywa.gov/.

    Maple Valley, Washington has adopted: IBC — MVMC 15.05.040(A): “the International Building Code (IBC), 2021 Edition, as adopted by the State Building Code Council and as published by the International Code Council together with Appendix Chapters: H – Signs, and J – Grading”.; IRC — MVMC 15.05.050: “the International Residential Code (IRC), 2021 Edition, as adopted by the State Building Code Council in Chapter 51-51 WAC”.; UPC — MVMC 15.05.070: “the Uniform Plumbing Code (UPC), 2021 Edition, as adopted by the State Building Code Council in Chapter 51-56 WAC, as published by the International Association of Plumbing and Mechanical Officials”.; IMC — MVMC 15.05.080: “the International Mechanical Code (IMC), 2021 Edition, as adopted by the State Building Code Council”.; NFPA 58 — MVMC 15.05.110: “the Liquefied Petroleum Gas Code, 2020 Edition, as adopted by the State Building Code Council in Chapter 51-52 WAC, as published by NFPA.”; ADOPTED IN THEIR OWN SECTIONS BUT READ BY TITLE ONLY, so NO edition year is asserted for these: International Existing Building Code (15.05.060), International Fuel Gas Code (15.05.090), National Fuel Gas Code / NFPA 54 (15.05.100), International Energy Conservation Code (15.05.120), International Wildland Urban Interface Code (15.05.130) and International Property Maintenance Code (15.05.135).; NO ELECTRICAL CODE IS ADOPTED ANYWHERE IN TITLE 15, whose five chapters are 15.01 General Provisions, 15.02 Fee Schedule, 15.05 Construction Codes, 15.10 Signs and 15.20 Fire Code.; MVMC Chapter 15.20 FIRE CODE was NOT opened for this entry.. Local amendments apply — see the Maple Valley overview page for the full list.

    The 2020 Edition, named at MVMC 15.05.110, which attributes it to the State Building Code Council's adoption in Chapter 51-52 WAC. Two cautions. Washington cities disagree: Lake Stevens, Issaquah and Walla Walla also say 2020, while University Place says 2021. And the attribution does not check out on its face — WAC 51-52-003 adopts only the 2021 International Mechanical Code and contains no reference to NFPA, though the chapter's exceptions and the mechanical code's own referenced standards were not read. Confirm with the Building Official.

    Sources & verification

    Verified against official sources. Last reviewed 2026-09-16.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Maple Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Maple Valley's permit history isn't searchable here yet

    This page covers what the permit requires. What we don't have for Maple Valley yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

    Your email, and the place — never an address. We only use it to tell you when Maple Valley lands. Privacy.

    Compare fuel gas permit fees across Washington

    Look up this fee in a different city →

    Embed this data card →

    Now live

    Build your Maple Valley project checklist

    Describe your project once and get every permit, document, and fee it triggers in Maple Valley — in one checklist. Free, for any city and any number of projects.

    Get started →