Electrical Permit — University Place, Washington · Requirements sheet
Verified 2026-09-16 · Source: https://ecode360.com/48791127
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electrical Permit in University Place, Washington
University Place adopts no electrical code in its building and construction chapter.
Verified 2026-09-16 · Source
When you need this permit
- NO ELECTRICAL CODE APPEARS in the UPMC 14.05.030 adoption list as read — the paragraphs cover the IBC/IEBC/ISPSC, IRC, IMC/IFGC/NFPA 58, IFC, UPC and Washington State Energy Code
- The absence is bounded by what was read; UPMC 14.05.090 and 14.05.100 were not opened
- Electrical permitting in Washington is generally the Department of Labor and Industries' under Chapter 19.28 RCW; THIS ENTRY DOES NOT ESTABLISH the arrangement for University Place
- CONFIRM WITH THE CITY OR L&I before filing
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
Tips
- This guide records an absence rather than a finding: no electrical code appears in the adoption list at UPMC 14.05.030, but two sections of the chapter were not opened, so treat this as “not found where it would be expected” rather than “confirmed absent”. Several cities in this guide have stepped back from electrical and left it to L&I under Chapter 19.28 RCW; whether University Place has done the same is not established here.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-09-16.
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the University Place building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
University Place's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for University Place yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when University Place lands. Privacy.
Other permits in University Place
Electrical Permit in other cities
Compare electrical permit fees across Washington →
Look up this fee in a different city →
Now live
Build your University Place project checklist
Describe your project once and get every permit, document, and fee it triggers in University Place — in one checklist. Free, for any city and any number of projects.
Get started →