Mechanical Permit in Edmonds, Washington
Required for mechanical and fuel gas work in Edmonds, reviewed under the 2021 International Mechanical Code and the 2021 International Fuel Gas Code.
Verified 2026-09-16 · Source
When you need this permit
- 2021 IMC as amended by the WSBCC in Chapter 51-52 WAC (ECDC 19.15.000); IMC Chapter 1 is not adopted, administration comes from IBC Chapter 1 via ECDC 19.00.015
- 2021 IFGC as amended in Chapter 51-52 WAC “inclusive of NFPA 54 and 58” (ECDC 19.15.010)
- Fuel gas is deliberately routed out of the plumbing code: UPC Chapter 12 (fuel piping) is deleted and the UPC is adopted “provided, that any provisions that affect fuel gas piping are not adopted” (ECDC 19.20.000, 19.20.005)
- Where a residential fire sprinkler system is installed, all fuel fired equipment under combustible construction must be protected by at least one sprinkler head, except under exterior projections less than 48 inches (ECDC 19.05.020(B)(3)(d))
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
ECDC 19.70 is titled “Fees” and contains no monetary figure. Show full citationHide
ECDC 19.70 is titled “Fees” and contains no monetary figure. Its five live sections were opened in full this session: 19.70.010 states “Fee schedules are on file in the city clerk’s office.” while 19.70.010(C) and 19.70.020 both state the amounts are “set forth in this chapter” — a cross-reference that points at its own chapter and is wrong. The one pointer that leaves the chapter, ECDC 15.00.020(A), was also opened in full and ends outside the code: “Fees are established by resolution of the city council and can be accessed at the following hyperlink: Development Fees.” No dollar amount is therefore published in the Edmonds code, and none is asserted here.ECDC 19.70.010(C) requires inspection and reinspection fees to be paid prior to any inspection by city staff, and states they are “established and set forth in this chapter” — but Chapter 19.70 sets out no amount. Show full citationHide
ECDC 19.70.010(C) requires inspection and reinspection fees to be paid prior to any inspection by city staff, and states they are “established and set forth in this chapter” — but Chapter 19.70 sets out no amount. ECDC 19.70 is titled “Fees” and contains no monetary figure. Its five live sections were opened in full this session: 19.70.010 states “Fee schedules are on file in the city clerk’s office.” while 19.70.010(C) and 19.70.020 both state the amounts are “set forth in this chapter” — a cross-reference that points at its own chapter and is wrong. The one pointer that leaves the chapter, ECDC 15.00.020(A), was also opened in full and ends outside the code: “Fees are established by resolution of the city council and can be accessed at the following hyperlink: Development Fees.” No dollar amount is therefore published in the Edmonds code, and none is asserted here.Review timeline
Inspection process
See the full Edmonds inspection guide — scheduling & re-inspection fees →
Tips
- Fuel gas lives in the mechanical chapter in Edmonds, not the plumbing one. ECDC 19.20.000 adopts the UPC expressly excluding “any provisions that affect fuel gas piping” and deletes UPC Chapter 12 outright, so gas piping is reviewed against the 2021 IFGC inclusive of NFPA 54 and 58 under Chapter 19.15 ECDC.
- A handful of mechanical jobs need no permit at all under ECDC 19.00.025(G)(2): portable heating, ventilation, cooling, cooking or clothes drying appliances; replacement parts that do not alter equipment approval; portable fuel cell appliances not connected to fixed piping; steam or chilled water piping inside regulated equipment; portable evaporative coolers; and self-contained refrigeration systems with ten pounds or less of refrigerant.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-09-16.
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edmonds building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Edmonds's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Edmonds yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Edmonds lands. Privacy.
Other permits in Edmonds
Mechanical Permit in other cities
Compare mechanical permit fees across Washington →
Look up this fee in a different city →
Now live
Build your Edmonds project checklist
Describe your project once and get every permit, document, and fee it triggers in Edmonds — in one checklist. Free, for any city and any number of projects.
Get started →