Plumbing Permit in Edmonds, Washington
Required for plumbing work in Edmonds, reviewed under the 2021 Uniform Plumbing Code — not the International Plumbing Code — as amended by the Washington State Building Code Council.
Verified 2026-09-16 · Source
When you need this permit
- 2021 UPC published by IAPMO, including Appendices A, B, I and M, as amended by the WSBCC in Chapter 51-56 WAC (ECDC 19.20.000)
- UPC Chapter 1 is not adopted; Chapter 12 (fuel piping) and Chapter 14 (firestop protection) are deleted (ECDC 19.20.005)
- IRC Part VII (Plumbing) is not adopted for residential work either — ECDC 19.05.015 routes it to Chapter 19.20 ECDC
- Evidence of an adequate potable water supply from the purveyor is required before any building permit issues for new development (ECDC 19.20.010)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
ECDC 19.70 is titled “Fees” and contains no monetary figure. Show full citationHide
ECDC 19.70 is titled “Fees” and contains no monetary figure. Its five live sections were opened in full this session: 19.70.010 states “Fee schedules are on file in the city clerk’s office.” while 19.70.010(C) and 19.70.020 both state the amounts are “set forth in this chapter” — a cross-reference that points at its own chapter and is wrong. The one pointer that leaves the chapter, ECDC 15.00.020(A), was also opened in full and ends outside the code: “Fees are established by resolution of the city council and can be accessed at the following hyperlink: Development Fees.” No dollar amount is therefore published in the Edmonds code, and none is asserted here.ECDC 19.70.010(C): inspection and reinspection fees must be paid prior to any inspection by city staff. Show full citationHide
ECDC 19.70.010(C): inspection and reinspection fees must be paid prior to any inspection by city staff. ECDC 19.70 is titled “Fees” and contains no monetary figure. Its five live sections were opened in full this session: 19.70.010 states “Fee schedules are on file in the city clerk’s office.” while 19.70.010(C) and 19.70.020 both state the amounts are “set forth in this chapter” — a cross-reference that points at its own chapter and is wrong. The one pointer that leaves the chapter, ECDC 15.00.020(A), was also opened in full and ends outside the code: “Fees are established by resolution of the city council and can be accessed at the following hyperlink: Development Fees.” No dollar amount is therefore published in the Edmonds code, and none is asserted here.Review timeline
Inspection process
See the full Edmonds inspection guide — scheduling & re-inspection fees →
Tips
- Edmonds is a Uniform Plumbing Code city, which catches people arriving from IPC jurisdictions: fixture unit tables, venting rules and sizing all differ. ECDC 19.20.000 adopts the 2021 UPC published by IAPMO including Appendices A, B, I and M, through Chapter 51-56 WAC.
- The potable water evidence requirement at ECDC 19.20.010 gates the BUILDING permit, not just the plumbing one — the building official must have substantive evidence of adequate supply from the purveyor before any permit issues for new development, and the city reserves the right to declare a moratorium regardless.
- Only two plumbing items are permit-exempt under ECDC 19.00.025(G)(3): stopping leaks in drains, water, soil, waste or vent pipe, and reinstalling or replacing approved prefabricated fixtures that do not require valves or pipes to be replaced or rearranged. Even the leak exemption requires new material, a permit and an inspection where defective material is replaced.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-09-16.
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edmonds building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Edmonds's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Edmonds yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Edmonds lands. Privacy.
Other permits in Edmonds
Plumbing Permit in other cities
Compare plumbing permit fees across Washington →
Look up this fee in a different city →
Related guides
Now live
Build your Edmonds project checklist
Describe your project once and get every permit, document, and fee it triggers in Edmonds — in one checklist. Free, for any city and any number of projects.
Get started →