Plumbing permit — Des Moines, Washington · Requirements sheet
Verified 2026-09-16 · Source: https://ecode360.com/47124043
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing permit in Des Moines, Washington
Permit for plumbing installations in Des Moines under the Uniform Plumbing Code adopted by reference at DMMC 14.01.050.
Verified 2026-09-16 · Source
When you need this permit
- DMMC 14.01.050(7) adopts “Chapter 51-56 WAC – Uniform Plumbing Code”, with no edition year and no edition phrase, under the chapter's general rolling clause.
- NO APPLICANT-ELECTED INTERNATIONAL PLUMBING CODE ALTERNATE APPEARS in the adoption list at DMMC 14.01.050. SeaTac and Longview both publish one; DMMC 14.01.050 does not.
- A SEPARATE CHAPTER GOVERNS SEWAGE DISPOSAL SYSTEMS — DMMC Chapter 14.25 SEWAGE DISPOSAL SYSTEMS CODE — which was NOT opened for this entry. On-site sewage questions are likely to sit there rather than in the plumbing adoption.
- TWO EXPIRY TRIGGERS AND NO ABSOLUTE CAP, WHICH IS UNUSUAL IN THIS SET. DMMC 14.05.110(1): “Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The Building Official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.” “ONE OR MORE EXTENSIONS” IS THE PHRASE TO NOTICE. Puyallup, Wenatchee and Walla Walla all add a two-year absolute limit that runs regardless of progress, and SeaTac allows a single extension only. Des Moines publishes neither an absolute cap nor a limit on the number of extensions.
- THE APPLICATION HAS ITS OWN 180-DAY CLOCK, AND MISSING IT CAN COST YOU THE DRAWINGS. DMMC 14.05.110(2): “Applications for which no permit is issued within 180 days following the date of application filing shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official.” One extension of up to 180 days is available on request with cause shown.
- CONSTRUCTION HOURS PUT SATURDAY WITH SUNDAY, NOT WITH THE WORKING WEEK. DMMC 14.01.100: activities “shall be limited to the following hours: (1) Monday through Friday: 7:00 a.m. to 7:00 p.m. (2) Saturday, Sunday and Holidays: 8:00 a.m. to 5:00 p.m.” THREE CITIES IN THIS SET, THREE DIFFERENT PLACES FOR SATURDAY: Issaquah permits no nonemergency construction on weekends or legal holidays at all without an expanded work hours permit; University Place runs Monday THROUGH SATURDAY 7:00 to 7:00 with Sunday and legal holidays at 8:00 to 5:00; Des Moines gives Saturday the short day.
- DES MOINES RESOLVES CODE CONFLICTS BY A DIFFERENT PRINCIPLE FROM ITS NEIGHBOURS, AND CARRYING THEIRS HERE WOULD GIVE THE WRONG ANSWER. DMMC 14.05.040: “Where, in any specific case, different sections of this code specify different materials, methods of construction or other requirements, the most restrictive shall govern except that the hierarchy of the codes established in RCW 19.27.031 shall govern.” >>> SO THE DEFAULT IS MOST-RESTRICTIVE AND THE OVERRIDE IS A STATE STATUTE, NOT A LOCAL LIST. Pullman and Walla Walla both publish their own ordering and make the FIRST LISTED code govern — and they disagree with each other about where plumbing sits. Des Moines publishes no ordering of its own at all. RCW 19.27.031 was not read for this entry, so what that hierarchy contains is NOT asserted here.
- DMMC 14.01.050 closes with a filing duty that is useful to a reader: “Not less than one copy of each such code, standards, rules, and regulations, in the form in which it was adopted, and suitably marked to indicate amendments, additions, deletions and exceptions as provided in this Title, shall be filed in the Building Official's office and be available for use and examination by the public.” Because the city adopts by WAC chapter with no edition year, that marked-up filed copy is the concrete way to see which text is actually in force.
- DMMC 14.01.140: appeals go to the Hearing Examiner under DMMC 18.20.150, 18.20.160 and chapter 18.240 DMMC, and “All references to ‘board of appeals’ in any codes, standards, rules, and regulations adopted in this Title shall hereafter mean the Hearing Examiner.” THE EXAMINER'S POWER IS BOUNDED: “The Hearing Examiner shall have no authority to waive requirements of this Title.” Chapter 18.240 DMMC was not opened, so no deadline is asserted.
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
DMMC 14.01.090: “Except as otherwise provided in this Title, the fee for any permit issued by the City under the authority of this Title shall be established by the City Manager or the City Manager's… Show full citationHide
DMMC 14.01.090: “Except as otherwise provided in this Title, the fee for any permit issued by the City under the authority of this Title shall be established by the City Manager or the City Manager's designee.” NO DOLLAR AMOUNT APPEARS IN THE CODE and the schedule itself was not opened. THIS IS THE SECOND CITY-MANAGER FEE IN THIS WASHINGTON SET AND THE TWO ARE NOT IDENTICAL: Puyallup sets its fees by EXECUTIVE ORDER of the city manager, naming the instrument; Des Moines names the officer and the delegate but no instrument at all, so there is no document type to ask for by name. Note also the opening words — “Except as otherwise provided in this Title” — which means the manager's schedule is not necessarily the whole answer; the electrical chapter carries its own fee provision at amended WCEC Section 85.13(N).Review timeline
Inspection process
Tips
- IF THE WORK INVOLVES AN ON-SITE SEWAGE SYSTEM, THE PLUMBING ADOPTION IS NOT THE WHOLE PICTURE. DMMC Chapter 14.25 is a dedicated Sewage Disposal Systems Code; it was not opened for this entry and nothing here rests on it, but it is the obvious place to look.
- Conflicts here are resolved most-restrictive-first subject to RCW 19.27.031, NOT by a local ranking of the codes. Pullman ranks plumbing second of seven and Walla Walla ranks it last; neither ordering applies in Des Moines.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-09-16.
Checklists & handouts
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Des Moines building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Des Moines's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Des Moines yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Des Moines lands. Privacy.
Other permits in Des Moines
Plumbing permit in other cities
Compare plumbing permit fees across Washington →
Look up this fee in a different city →
Related guides
Now live
Build your Des Moines project checklist
Describe your project once and get every permit, document, and fee it triggers in Des Moines — in one checklist. Free, for any city and any number of projects.
Get started →