Skip to main content
PermitBase

Commercial building permit in Des Moines, Washington

Permit for commercial, industrial and institutional construction in Des Moines under the International Building Code adopted by reference at DMMC 14.01.050.

Verified 2026-09-16 · Source

When you need this permit

  • DMMC 14.01.050 adopts “Chapter 51-50 WAC – International Building Code (IBC)”, again with no edition year and no edition phrase, under the same rolling opening sentence.
  • The same section adopts Chapter 51-11C WAC (IECC Commercial), Chapter 51-11R WAC (IECC Residential), Chapter 51-52 WAC (International Mechanical Code), Chapter 51-54A WAC (International Fire Code, “including the Appendices B, C, E, F and I”), Chapter 51-56 WAC (Uniform Plumbing Code) and the Washington Cities Electrical Code.
  • A LOCAL FIRE-FLOW CONCESSION FOR SPRINKLERED BUILDINGS. IFC Appendix B Section B105.2 is replaced so that, for buildings other than one- and two-family dwellings, “A reduction in required fire flow of up to 50 percent, as approved, is allowed when the building is protected throughout with an automatic fire sprinkler system installed in accordance with NFPA 13 or NFPA 13R. The resulting fire flow shall not be less than 1,500 gallons per minute (5,678 L/min) for the prescribed duration as specified in Table B105.1(2).” Table B105.2 is deleted.
  • >>> DES MOINES ONCE HAD A FIVE-STOREY WOOD FRAME REGIME AND REPEALED THE WHOLE OF IT. DMMC 14.05.130 through 14.05.220 — ten sections covering purpose, construction, occupancy, stair enclosures, fire detection and protection, height, basic allowable floor area, Fire Department access and construction inspection — every one now reads “Repealed by Ord. 1800.” MEASURED: exactly ten occurrences of that phrase in the chapter, all citing the same ordinance. THE SECTION INDEX STILL SHOWS THE FULL DESCRIPTIVE NAMES, so the contents list reads like a live regime. Ordinance 1800 was not read and WHY the city repealed it is not asserted. Compare SeaTac, which grants a five-storey Type VA allowance on seven conditions.
  • A SECOND, NARROWER CONFLICT RULE APPLIES TO ONE CLASS OF FACILITY AND INVERTS THE USUAL SHAPE. DMMC 14.01.050(9): “The design of HCT stations and associated facilities, including elevated structures, shall conform to the most current versions of all applicable sections of the building code, fire code, and National Fire Protection Standard No. 130 (NFPA 130). Conflicts among these codes shall be resolved in favor of the NFPA 130 or as otherwise approved by the Fire Marshal and Building Official.” A single named standard wins for high-capacity transit work, rather than a list position or a most-restrictive test.
  • DES MOINES RESOLVES CODE CONFLICTS BY A DIFFERENT PRINCIPLE FROM ITS NEIGHBOURS, AND CARRYING THEIRS HERE WOULD GIVE THE WRONG ANSWER. DMMC 14.05.040: “Where, in any specific case, different sections of this code specify different materials, methods of construction or other requirements, the most restrictive shall govern except that the hierarchy of the codes established in RCW 19.27.031 shall govern.” >>> SO THE DEFAULT IS MOST-RESTRICTIVE AND THE OVERRIDE IS A STATE STATUTE, NOT A LOCAL LIST. Pullman and Walla Walla both publish their own ordering and make the FIRST LISTED code govern — and they disagree with each other about where plumbing sits. Des Moines publishes no ordering of its own at all. RCW 19.27.031 was not read for this entry, so what that hierarchy contains is NOT asserted here.
  • TWO EXPIRY TRIGGERS AND NO ABSOLUTE CAP, WHICH IS UNUSUAL IN THIS SET. DMMC 14.05.110(1): “Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The Building Official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.” “ONE OR MORE EXTENSIONS” IS THE PHRASE TO NOTICE. Puyallup, Wenatchee and Walla Walla all add a two-year absolute limit that runs regardless of progress, and SeaTac allows a single extension only. Des Moines publishes neither an absolute cap nor a limit on the number of extensions.
  • THE APPLICATION HAS ITS OWN 180-DAY CLOCK, AND MISSING IT CAN COST YOU THE DRAWINGS. DMMC 14.05.110(2): “Applications for which no permit is issued within 180 days following the date of application filing shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official.” One extension of up to 180 days is available on request with cause shown.
  • A BOND OR CASH IS REQUIRED BEFORE ANY BUILDING PERMIT ISSUES, AND THE CODE PUBLISHES NO AMOUNT. DMMC 14.05.080: “Before issuing any building permit, the City shall require the applicant to execute and file with the City a bond or cash. The bond shall be in a form approved by the City Manager or the City Manager's designee in such reasonable sum and with such securities as the Building Official may specify. In the event of a failure by the applicant to satisfactorily complete the work included in the building permit, the bond or cash may be claimed by the City”. THIS IS SECURITY, NOT A FEE — it is returned if the work is completed satisfactorily. It applies to EVERY building permit, not to a class of work, and because the sum is set case by case there is no figure to budget from until the Building Official specifies one.
  • CONSTRUCTION HOURS PUT SATURDAY WITH SUNDAY, NOT WITH THE WORKING WEEK. DMMC 14.01.100: activities “shall be limited to the following hours: (1) Monday through Friday: 7:00 a.m. to 7:00 p.m. (2) Saturday, Sunday and Holidays: 8:00 a.m. to 5:00 p.m.” THREE CITIES IN THIS SET, THREE DIFFERENT PLACES FOR SATURDAY: Issaquah permits no nonemergency construction on weekends or legal holidays at all without an expanded work hours permit; University Place runs Monday THROUGH SATURDAY 7:00 to 7:00 with Sunday and legal holidays at 8:00 to 5:00; Des Moines gives Saturday the short day.
  • THERE IS A PUBLISHED ROUTE TO VEST BEFORE YOU FILE FOR THE BUILDING PERMIT. DMMC 14.05.070 “Optional method of obtaining prior approvals – Agreement regarding vested rights” lets an applicant seek design review approval, a shoreline substantial development permit, environmental review under SEPA and/or a land clearing, grading or filling permit BEFORE filing a building permit application, on terms the section sets out. The full terms run past the extract read for this entry and the vesting effect is NOT asserted here — the section title says an agreement regarding vested rights is involved, and the agreement itself was not read.
  • DMMC 14.01.050 closes with a filing duty that is useful to a reader: “Not less than one copy of each such code, standards, rules, and regulations, in the form in which it was adopted, and suitably marked to indicate amendments, additions, deletions and exceptions as provided in this Title, shall be filed in the Building Official's office and be available for use and examination by the public.” Because the city adopts by WAC chapter with no edition year, that marked-up filed copy is the concrete way to see which text is actually in force.
  • DMMC 14.01.140: appeals go to the Hearing Examiner under DMMC 18.20.150, 18.20.160 and chapter 18.240 DMMC, and “All references to ‘board of appeals’ in any codes, standards, rules, and regulations adopted in this Title shall hereafter mean the Hearing Examiner.” THE EXAMINER'S POWER IS BOUNDED: “The Hearing Examiner shall have no authority to waive requirements of this Title.” Chapter 18.240 DMMC was not opened, so no deadline is asserted.

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Permit fee
DMMC 14.01.090: “Except as otherwise provided in this Title, the fee for any permit issued by the City under the authority of this Title shall be established by the City Manager or the City Manager's… Show full citationDMMC 14.01.090: “Except as otherwise provided in this Title, the fee for any permit issued by the City under the authority of this Title shall be established by the City Manager or the City Manager's designee.” NO DOLLAR AMOUNT APPEARS IN THE CODE and the schedule itself was not opened. THIS IS THE SECOND CITY-MANAGER FEE IN THIS WASHINGTON SET AND THE TWO ARE NOT IDENTICAL: Puyallup sets its fees by EXECUTIVE ORDER of the city manager, naming the instrument; Des Moines names the officer and the delegate but no instrument at all, so there is no document type to ask for by name. Note also the opening words — “Except as otherwise provided in this Title” — which means the manager's schedule is not necessarily the whole answer; the electrical chapter carries its own fee provision at amended WCEC Section 85.13(N).
Set by the City Manager or designee

Review timeline

Plan review
Not published — contact the department

How long did your Commercial building permit permit actually take in Des Moines?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • DO NOT READ THE FIVE-STOREY WOOD FRAME SECTIONS FROM THE CONTENTS LIST. DMMC 14.05.130 to .220 keep their full descriptive titles in the section index but every one of them is “Repealed by Ord. 1800.” If you need a five-storey wood frame scheme here, the local regime is gone and the question goes to the adopted state code.
    • CONFLICTS RESOLVE MOST-RESTRICTIVE-FIRST, SUBJECT TO A STATE STATUTE. DMMC 14.05.040 does not publish a local ranking of the codes the way Pullman and Walla Walla do; it defers to the hierarchy in RCW 19.27.031. Do not carry a neighbouring city's ordering across the line.
    • SPRINKLERS CAN CUT REQUIRED FIRE FLOW BY UP TO 50 PERCENT, with a floor of 1,500 gallons per minute, where the building is protected throughout to NFPA 13 or 13R (amended IFC B105.2). That is a real design lever on water supply and site cost.

    Frequently asked questions

    Des Moines requires a commercial building permit for: DMMC 14.01.050 adopts “Chapter 51-50 WAC – International Building Code (IBC)”, again with no edition year and no edition phrase, under the same rolling opening sentence.; The same section adopts Chapter 51-11C WAC (IECC Commercial), Chapter 51-11R WAC (IECC Residential), Chapter 51-52 WAC (International Mechanical Code), Chapter 51-54A WAC (International Fire Code, “including the Appendices B, C, E, F and I”), Chapter 51-56 WAC (Uniform Plumbing Code) and the Washington Cities Electrical Code.; A LOCAL FIRE-FLOW CONCESSION FOR SPRINKLERED BUILDINGS. IFC Appendix B Section B105.2 is replaced so that, for buildings other than one- and two-family dwellings, “A reduction in required fire flow of up to 50 percent, as approved, is allowed when the building is protected throughout with an automatic fire sprinkler system installed in accordance with NFPA 13 or NFPA 13R. The resulting fire flow shall not be less than 1,500 gallons per minute (5,678 L/min) for the prescribed duration as specified in Table B105.1(2).” Table B105.2 is deleted.; >>> DES MOINES ONCE HAD A FIVE-STOREY WOOD FRAME REGIME AND REPEALED THE WHOLE OF IT. DMMC 14.05.130 through 14.05.220 — ten sections covering purpose, construction, occupancy, stair enclosures, fire detection and protection, height, basic allowable floor area, Fire Department access and construction inspection — every one now reads “Repealed by Ord. 1800.” MEASURED: exactly ten occurrences of that phrase in the chapter, all citing the same ordinance. THE SECTION INDEX STILL SHOWS THE FULL DESCRIPTIVE NAMES, so the contents list reads like a live regime. Ordinance 1800 was not read and WHY the city repealed it is not asserted. Compare SeaTac, which grants a five-storey Type VA allowance on seven conditions.; A SECOND, NARROWER CONFLICT RULE APPLIES TO ONE CLASS OF FACILITY AND INVERTS THE USUAL SHAPE. DMMC 14.01.050(9): “The design of HCT stations and associated facilities, including elevated structures, shall conform to the most current versions of all applicable sections of the building code, fire code, and National Fire Protection Standard No. 130 (NFPA 130). Conflicts among these codes shall be resolved in favor of the NFPA 130 or as otherwise approved by the Fire Marshal and Building Official.” A single named standard wins for high-capacity transit work, rather than a list position or a most-restrictive test.; DES MOINES RESOLVES CODE CONFLICTS BY A DIFFERENT PRINCIPLE FROM ITS NEIGHBOURS, AND CARRYING THEIRS HERE WOULD GIVE THE WRONG ANSWER. DMMC 14.05.040: “Where, in any specific case, different sections of this code specify different materials, methods of construction or other requirements, the most restrictive shall govern except that the hierarchy of the codes established in RCW 19.27.031 shall govern.” >>> SO THE DEFAULT IS MOST-RESTRICTIVE AND THE OVERRIDE IS A STATE STATUTE, NOT A LOCAL LIST. Pullman and Walla Walla both publish their own ordering and make the FIRST LISTED code govern — and they disagree with each other about where plumbing sits. Des Moines publishes no ordering of its own at all. RCW 19.27.031 was not read for this entry, so what that hierarchy contains is NOT asserted here.; TWO EXPIRY TRIGGERS AND NO ABSOLUTE CAP, WHICH IS UNUSUAL IN THIS SET. DMMC 14.05.110(1): “Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The Building Official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.” “ONE OR MORE EXTENSIONS” IS THE PHRASE TO NOTICE. Puyallup, Wenatchee and Walla Walla all add a two-year absolute limit that runs regardless of progress, and SeaTac allows a single extension only. Des Moines publishes neither an absolute cap nor a limit on the number of extensions.; THE APPLICATION HAS ITS OWN 180-DAY CLOCK, AND MISSING IT CAN COST YOU THE DRAWINGS. DMMC 14.05.110(2): “Applications for which no permit is issued within 180 days following the date of application filing shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official.” One extension of up to 180 days is available on request with cause shown.; A BOND OR CASH IS REQUIRED BEFORE ANY BUILDING PERMIT ISSUES, AND THE CODE PUBLISHES NO AMOUNT. DMMC 14.05.080: “Before issuing any building permit, the City shall require the applicant to execute and file with the City a bond or cash. The bond shall be in a form approved by the City Manager or the City Manager's designee in such reasonable sum and with such securities as the Building Official may specify. In the event of a failure by the applicant to satisfactorily complete the work included in the building permit, the bond or cash may be claimed by the City”. THIS IS SECURITY, NOT A FEE — it is returned if the work is completed satisfactorily. It applies to EVERY building permit, not to a class of work, and because the sum is set case by case there is no figure to budget from until the Building Official specifies one.; CONSTRUCTION HOURS PUT SATURDAY WITH SUNDAY, NOT WITH THE WORKING WEEK. DMMC 14.01.100: activities “shall be limited to the following hours: (1) Monday through Friday: 7:00 a.m. to 7:00 p.m. (2) Saturday, Sunday and Holidays: 8:00 a.m. to 5:00 p.m.” THREE CITIES IN THIS SET, THREE DIFFERENT PLACES FOR SATURDAY: Issaquah permits no nonemergency construction on weekends or legal holidays at all without an expanded work hours permit; University Place runs Monday THROUGH SATURDAY 7:00 to 7:00 with Sunday and legal holidays at 8:00 to 5:00; Des Moines gives Saturday the short day.; THERE IS A PUBLISHED ROUTE TO VEST BEFORE YOU FILE FOR THE BUILDING PERMIT. DMMC 14.05.070 “Optional method of obtaining prior approvals – Agreement regarding vested rights” lets an applicant seek design review approval, a shoreline substantial development permit, environmental review under SEPA and/or a land clearing, grading or filling permit BEFORE filing a building permit application, on terms the section sets out. The full terms run past the extract read for this entry and the vesting effect is NOT asserted here — the section title says an agreement regarding vested rights is involved, and the agreement itself was not read.; DMMC 14.01.050 closes with a filing duty that is useful to a reader: “Not less than one copy of each such code, standards, rules, and regulations, in the form in which it was adopted, and suitably marked to indicate amendments, additions, deletions and exceptions as provided in this Title, shall be filed in the Building Official's office and be available for use and examination by the public.” Because the city adopts by WAC chapter with no edition year, that marked-up filed copy is the concrete way to see which text is actually in force.; DMMC 14.01.140: appeals go to the Hearing Examiner under DMMC 18.20.150, 18.20.160 and chapter 18.240 DMMC, and “All references to ‘board of appeals’ in any codes, standards, rules, and regulations adopted in this Title shall hereafter mean the Hearing Examiner.” THE EXAMINER'S POWER IS BOUNDED: “The Hearing Examiner shall have no authority to waive requirements of this Title.” Chapter 18.240 DMMC was not opened, so no deadline is asserted.. If your project isn't listed, confirm with City of Des Moines at (206) 878-4595 before starting work.

    In Des Moines, the published Permit fee is: Set by the City Manager or designee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Des Moines does not publish a plan-review timeline for this permit. Contact City of Des Moines at (206) 878-4595 for current turnaround.

    You'll need: Building permit application; Assurance device — bond or cash filed with the City. See the required-documents checklist on this page for details on each.

    Apply through City of Des Moines at 21630 11th Ave S, Des Moines, WA 98198. Phone: (206) 878-4595. Official information: https://www.desmoineswa.gov/.

    Des Moines, Washington has adopted: DMMC 14.01.050 opens: “The following codes, standards, rules, and regulations, as amended, added to, or excepted in this Title, are adopted by reference pursuant to chapter 19.27 RCW and RCW 35.21.180 as presently constituted or as may be subsequently amended, added to, or excepted as though fully set forth in this Title:”; (1) Chapter 51-11C WAC – International Energy Conservation Code (IECC), Commercial.; (2) Chapter 51-11R WAC – International Energy Conservation Code (IECC), Residential.; (3) Chapter 51-50 WAC – International Building Code (IBC).; (4) Chapter 51-51 WAC – International Residential Code (IRC).; (5) Chapter 51-52 WAC – International Mechanical Code.; (6) Chapter 51-54A WAC – the International Fire Code (IFC), “including the Appendices B, C, E, F and I”, with Appendix B Section B105.2 replaced and Table B105.2 deleted.; (7) Chapter 51-56 WAC – Uniform Plumbing Code.; (8) “The Washington Cities Electrical Code as published and printed by the Washington Association of Building Officials”.; (9) HCT stations and associated facilities — “the most current versions of all applicable sections of the building code, fire code, and National Fire Protection Standard No. 130 (NFPA 130)”.; NO EDITION YEAR APPEARS FOR ANY OF THEM. Also adopted and amended elsewhere in the Title: the International Property Maintenance Code (DMMC 14.05.120, not opened for this entry).. Local amendments apply — see the Des Moines overview page for the full list.

    The city's own five-storey wood frame provisions no longer exist. DMMC 14.05.130 through 14.05.220 — ten sections — are all repealed by Ordinance 1800, although the section index still lists their original titles. What governs now is the adopted state building code without those local additions. Ordinance 1800 was not read for this entry, so the reason for the repeal is not stated here; ask the Building Official.

    DMMC 14.01.050(6) adopts Chapter 51-54A WAC — the International Fire Code — “including the Appendices B, C, E, F and I”, with Appendix B amended: Section B105.2 is replaced to allow a fire flow reduction of up to 50 percent for buildings sprinklered throughout to NFPA 13 or 13R, subject to a 1,500 gpm floor, and Table B105.2 is deleted.

    Sources & verification

    Verified against official sources. Last reviewed 2026-09-16.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Des Moines building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    This one’s complicated · Get an expediter

    Tell us about your project and we’ll connect you with a permit expediter who works in Des Moines.

    PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.

    Des Moines's permit history isn't searchable here yet

    This page covers what the permit requires. What we don't have for Des Moines yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

    Your email, and the place — never an address. We only use it to tell you when Des Moines lands. Privacy.