Swimming Pool, Hot Tub and Spa Permit — Edmonds, Washington · Requirements sheet
Verified 2026-09-16 · Source: https://edmonds.municipal.codes/ECDC/19.35
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Swimming Pool, Hot Tub and Spa Permit in Edmonds, Washington
Required for permanent swimming pools, hot tubs and spas in Edmonds, under the 2021 International Swimming Pool and Spa Code plus a locally written set of location, cross-connection and inspection rules.
Verified 2026-09-16 · Source
When you need this permit
- 2021 ISPSC adopted at ECDC 19.35.000 — the only chapter in Title 19 adopted with no WSBCC amendment clause
- The ISPSC applies to pools for the sole use of residents and invited guests at a single-family dwelling, or of a resident-owned duplex, or operated exclusively for physical therapy or rehabilitation under a licensed medical practitioner; other “water recreation facilities” per RCW 70.90.110 fall under Chapters 246-260 and 246-262 WAC
- Public swimming pool barriers are regulated by WAC 246-260-031(4), not by the ISPSC
- Setbacks are measured “from property lines to the inside face of the pool, hot tub or spa” as required by the zoning code for accessory structures (ECDC 19.00.025(Y))
- No direct connection may be made to any storm drain, city sewer main, drainage system, seepage pit, underground leaching pit or sub-soil drain; a sanitary tee is required for draining treated water to the sanitary sewer (ECDC 19.00.025(AA))
- PROHIBITED OUTRIGHT inside the North Edmonds earth subsidence and landslide hazard area (ECDC 19.10.070(E)(1))
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
ECDC 19.70 is titled “Fees” and contains no monetary figure. Show full citationHide
ECDC 19.70 is titled “Fees” and contains no monetary figure. Its five live sections were opened in full this session: 19.70.010 states “Fee schedules are on file in the city clerk’s office.” while 19.70.010(C) and 19.70.020 both state the amounts are “set forth in this chapter” — a cross-reference that points at its own chapter and is wrong. The one pointer that leaves the chapter, ECDC 15.00.020(A), was also opened in full and ends outside the code: “Fees are established by resolution of the city council and can be accessed at the following hyperlink: Development Fees.” No dollar amount is therefore published in the Edmonds code, and none is asserted here.ECDC 19.70.010(C) requires these to be paid before any inspection by city staff. Show full citationHide
ECDC 19.70.010(C) requires these to be paid before any inspection by city staff. ECDC 19.70 is titled “Fees” and contains no monetary figure. Its five live sections were opened in full this session: 19.70.010 states “Fee schedules are on file in the city clerk’s office.” while 19.70.010(C) and 19.70.020 both state the amounts are “set forth in this chapter” — a cross-reference that points at its own chapter and is wrong. The one pointer that leaves the chapter, ECDC 15.00.020(A), was also opened in full and ends outside the code: “Fees are established by resolution of the city council and can be accessed at the following hyperlink: Development Fees.” No dollar amount is therefore published in the Edmonds code, and none is asserted here.Review timeline
Inspection process
- 1
Footing and Wall
Part of the inspection sequence listed at ECDC 19.00.025(BB)(1).
- 2
Pre-Form / Pre-Gunite
Before the shell is placed.
- 3
Erosion Control
Listed in the required sequence at ECDC 19.00.025(BB)(1).
- 4
Underground Plumbing, Sanitary Extension and Cleanout
All pool, hot tub and spa piping “shall be inspected and approved before being covered or concealed” (ECDC 19.00.025(Z)(1)).
- 5
Mechanical Pool Equipment and Gas Piping
Including the mechanical enclosure location.
- 6
Cross Connection Control (initial installation)
ECDC 19.00.025(BB)(2): “An initial cross connection control installation inspection is required by the city cross connection control specialist prior to final installation approval.”
- 7
Final Inspection
Completes the sequence in ECDC 19.00.025(BB)(1).
See the full Edmonds inspection guide — scheduling & re-inspection fees →
Tips
- Check the landslide map before you design anything. Swimming pools and hot tubs are on the short list of things flatly prohibited inside the North Edmonds earth subsidence and landslide hazard area under ECDC 19.10.070(E), alongside ponds, irrigation systems, fill stockpiles and rockeries — and the waiver burden under 19.10.070(F) is on you by a clear preponderance of the evidence.
- Setbacks are measured to the inside face of the shell, not to the coping or the deck. ECDC 19.00.025(Y)(1) is explicit about it, and it is an easy way to lose a foot of yard you thought you had.
- Small prefabricated pools and spas can avoid the permit: ECDC 19.00.025(G)(1)(k) exempts prefabricated pools accessory to an occupancy where the walls are entirely above adjacent grade and capacity does not exceed 5,000 gallons, and hot tubs and spas under 5,000 gallons completely supported by the ground.
- The backflow obligation does not end at final inspection — assemblies must be retested annually by a state certified tester and the reports filed with the city water division every year thereafter.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-09-16.
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Edmonds building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Edmonds's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Edmonds yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Edmonds lands. Privacy.
Other permits in Edmonds
Swimming Pool, Hot Tub and Spa Permit in other cities
Compare swimming pool, hot tub and spa permit fees across Washington →
Look up this fee in a different city →
Now live
Build your Edmonds project checklist
Describe your project once and get every permit, document, and fee it triggers in Edmonds — in one checklist. Free, for any city and any number of projects.
Get started →