Required for construction in Olympia. The city adopts the current state edition rather than a named year, requires residential fire sprinklers with five exceptions, and prices a renewal on the work left to do.

Reviewed 2026-09-16 · Source

When you need this permit

  • Built to the CURRENT State adopted edition of the IBC and IRC, per Chapters 51-50 and 51-51 WAC
  • ICC A117.1-2017 accessibility standard is adopted by name
  • IRC Appendices F, Q, T and U are adopted; Chapter 29 Section P2904 is adopted
  • Residential fire sprinklers required to protect all areas of a dwelling unit, with five named exceptions
  • Permits expire after 180 days of inactivity, and after eighteen months regardless

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Permit fee (not set in the building title)
NO FEE AMOUNT IS STATED IN THIS ENTRY. Chapter 16.04 provides for "the issuance of permits and collection of fees" without setting them, and OMC Title 15 is a whole separate title called IMPACT FEES… Show full citationNO FEE AMOUNT IS STATED IN THIS ENTRY. Chapter 16.04 provides for "the issuance of permits and collection of fees" without setting them, and OMC Title 15 is a whole separate title called IMPACT FEES which was NOT opened for this entry - so a figure is declined rather than invented, and the reader is pointed at the title most likely to carry it. WHAT THE CHAPTER DOES FIX IS THE RENEWAL RULE, AND IT IS UNUSUAL: where a permit has expired, a new one must be obtained and "the fee therefor paid based on the work left to complete the project" - a renewal priced on the PERCENTAGE OF INCOMPLETE WORK rather than a flat charge, so the later you let it lapse the less the replacement costs. That is the opposite of the intuition most owners bring.
Not stated in this guide - see notes

Review timeline

Plan review
Not published — contact the department

How long did your Building Permit permit actually take in Olympia?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • The 180-day clock is measured by the gap between REQUIRED INSPECTIONS - an inspection is what restarts it
    • If a permit lapses, the replacement is issued under the codes current AT RE-ISSUANCE, and Olympia follows the state's current edition rather than a fixed year
    • A renewal is priced on the percentage of INCOMPLETE work
    • Fee amounts are not in the building title; OMC Title 15 is a separate IMPACT FEES title

    Frequently asked questions

    Often not. Olympia requires sprinklers to protect all areas of a dwelling unit, but exempts "Detached garage conversions to accessory dwelling units and detached accessory dwelling units with utilities served by an existing single-family residence that does not have an existing sprinkler system". Note this is an Olympia answer only - Camas applies its residential sprinkler requirement to new detached ADUs, so the two cities differ on the same question.

    In Olympia, the published Permit fee (not set in the building title) is: Not stated in this guide - see notes. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Olympia does not publish a plan-review timeline for this permit. Contact City of Olympia at (360) 753-8447 for current turnaround.

    You'll need: Permit application and plans. See the required-documents checklist on this page for details on each.

    Apply through City of Olympia at 601 4th Ave E, Olympia, WA 98507. Phone: (360) 753-8447. Official information: https://www.olympiawa.gov/.

    Olympia names no edition year. OMC 16.04.020 adopts "The current State adopted edition" of the International Building Code, International Residential Code and International Mechanical Code, as adopted by the State Building Code Council in Chapters 51-50, 51-51 and 51-52 WAC. The only year in the adoption belongs to the accessibility standard, ICC A117.1-2017.

    You need a new one, and it may be judged against a different code. A permit expires if work has not commenced within 180 days, or if work is suspended or abandoned for at least 180 days - measured by the length of time between required inspections - and in any case after eighteen months from issue where work is ongoing but incomplete. On expiry "a new permit shall first be obtained" and "Any new permit shall comply with the provisions of the codes currently adopted at the time of permit issuance". Because Olympia adopts the current state edition rather than a fixed year, that can mean a later edition than the one you designed to. The fee for the replacement is based on the work left to complete.

    Sources & verification

    Key facts verified against official sources. Last reviewed 2026-09-16.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Olympia building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Olympia's permit history isn't searchable here yet

    This page covers what the permit requires. What we don't have for Olympia yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

    Your email, and the place — never an address. We only use it to tell you when Olympia lands. Privacy.

    Other permits in Olympia

    Compare building permit fees across Washington

    Look up this fee in a different city →

    Embed this data card →

    Now live

    Build your Olympia project checklist

    Describe your project once and get every permit, document, and fee it triggers in Olympia — in one checklist. Free, for any city and any number of projects.

    Get started →