Laramie building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Laramie, Wyoming.
Verified 2026-07-01 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 320 E. Grand Avenue, Laramie, WY 82070 (temporary location while the Historic Carnegie Building at 405 Grand Avenue undergoes renovations; mailing address P.O. Box C, Laramie, WY 82073)
- Phone
- (307) 721-5271
- Office hours
- Mon–Fri, 9:00 a.m.–3:00 p.m. (per Building Department Staff page, current); older bulletins/forms list Mon–Thu 8 a.m.–4 p.m., Fri 8 a.m.–2 p.m. — confirm current hours by phone
- Website
- Official site
Published scheduling rules
- Call at least 24 hours in advance to schedule any plumbing inspection. (Plumbing Permit)
- 24-hour advance notice required to schedule inspections (Plumbing Permit)
- 24-hour advance notice required to schedule inspections (standard convention across all Code Administration trade permits per the Plumbing/Mechanical/Electrical Permit Application form) (Fire Sprinkler System Permit)
- 24-hour advance notice required to schedule inspections (Fire Alarm System Permit)
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation / Under-floor
Before concrete pour — footings must extend below the 42-inch frost depth
- 2
Structural Framing
After framing complete, before insulation or wall cover
- 3
Plumbing, Mechanical and Electrical
Rough-in inspections for all trade work before it is concealed
- 4
Wall Coverings / Insulation
Insulation and wall-cover inspection before drywall
- 5
Final
All work complete; required before Certificate of Occupancy is issued
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation
Footings/foundation before concrete pour, below 42-inch frost depth
- 2
Framing
Structural framing before insulation/wall cover
- 3
MEP Rough-In
Mechanical, electrical, plumbing rough-in (separate trade permits required)
- 4
Final
All work complete; required for Certificate of Occupancy
Applies to: Residential Addition / Remodel Permit
- 1
Foundation (if new footings)
Before concrete pour, below 42-inch frost depth
- 2
Framing
After framing complete, before insulation or wall cover
- 3
Plumbing, Mechanical, Electrical Rough-In
Before walls closed, if applicable
- 4
Final
All work complete per approved plans
Applies to: Commercial Tenant Improvement / Remodel Permit
- 1
Framing / Structural
Structural alterations before concealment
- 2
MEP Rough-In
Mechanical, electrical, plumbing rough-in (separate trade permits required)
- 3
Final
All work complete; Certificate of Occupancy required before occupancy of altered space
Applies to: Deck Permit
- 1
Footing
Piers/footings before concrete pour — minimum 42 inches below frost depth
- 2
Framing
Deck framing, connection to existing structure, handrails/guards
- 3
Final
Completed deck per approved plans
Applies to: Demolition Permit
- 1
Pre-Demolition Utilities Verification
Verify gas, electric, water, and sewer disconnections before demolition begins
- 2
Final
Site remediation, public facility repair, and debris removal verified
Applies to: Electrical Permit
- 1
Rough-In
Before any work is covered by wall covering, paneling, or insulation
- 2
Final
All electrical devices and fixtures energized to verify proper operation; 24-hour advance notice required
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
Before any work is covered by wall covering, paneling, or insulation
- 2
Final
EVSE circuit, breaker/disconnect, and NEC Article 625 compliance verified; devices energized to verify proper operation; 24-hour advance notice required
Applies to: Fire Alarm System Permit
- 1
Rough-In
Wiring, initiating devices, and notification appliances before concealment
- 2
Final
System devices and monitoring/notification functions tested and verified operational; 24-hour advance notice required
Applies to: Fire Sprinkler System Permit
- 1
Rough-In
Sprinkler piping and system components before concealment
- 2
Final / Acceptance Test
System acceptance/flow testing before the system is placed in service; call at least 24 hours in advance to schedule
Applies to: Mechanical / HVAC Permit
- 1
Rough-In / Equipment
Equipment and ductwork installation before concealment
- 2
Final
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Underground / Rough-In
Before pipes are concealed — verify slope, materials, connections
- 2
Final
All fixtures connected, no leaks, proper venting verified
Applies to: Solar PV / Private Energy Generation Permit
- 1
Rough Electrical / Structural
Before any equipment is covered or concealed — 2 working days' advance notice required
- 2
Final
Structural systems, equipment attachments, and electrical code compliance verified before energizing; written approval issued to the power utility upon acceptance
Final inspection only: Certificate of Occupancy / Change of Use, Roofing Permit (Reroof), Sign Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Laramie building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Laramie building permits
Get alerts for Laramie
We'll email you when Laramie's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.