Certificate of Occupancy / Change of Use in Laramie, Wyoming

A Certificate of Occupancy (CO) is required before occupying any new building, addition, or space in Laramie, and is issued at no additional cost after a successful final inspection under the applicable building permit (per this file's residential-building-permit entry). Laramie has no separate standalone 'change of use permit' application or fee; instead, LMC 15.10.010 (Change of Use) classifies every land use into one of 14 numbered 'Use Levels' (Table 15.10-2), and LMC 15.14.010.B.4 determines whether a change of use triggers full Chapter 15.14 Development Standards compliance before a new Certificate of Occupancy can issue.

Reviewed 2026-07-22 · Source

When you need this permit

  • A Certificate of Occupancy is required before occupying any new building, addition, or altered/changed-use space; it is issued after a successful final inspection under whatever building permit governs the work, at no separate CO fee (consistent with this file's residential-building-permit entry)
  • LMC 15.10.010 (Change of Use) assigns every land-use category in Table 15.10-1 to one of 14 numbered 'Use Levels' in Table 15.10-2 (e.g., Level 1 = Agriculture/Household Living; Level 6 = Financial Service, Office and Technology, Personal Services, Retail Sales; Level 7 = Food and Beverage Services, Outdoor/Indoor Recreation; Level 14 = Waste and Salvage)
  • A change of use WITHIN the same Use Level does NOT require compliance with Chapter 15.14 Development Standards, per LMC 15.14.010.B.4.a — the code's own example: converting a financial institution (Level 6) to a clothing store (Level 6-Retail) triggers no additional site/building standards review
  • A change of use that moves OUTSIDE the existing Use Level DOES require full compliance with Chapter 15.14 Development Standards — building design, building materials, parking, landscaping, screening, buffering, and public improvements — applied to the ENTIRETY of the existing development, not just the portion changing use (LMC 15.14.010.B.2 and B.4)
  • There is no dedicated 'change of use permit' product or fee; the physical work associated with a change of use is processed through the standard building permit (see this file's commercial-tenant-improvement-permit entry), and any Chapter 15.14-triggering change additionally requires the applicable Planning Division site plan review (Type 1/Limited, Type 2/Partial, or Type 3/Full Compliance, per the Planning, Zoning and Engineering Fees schedule)
  • Confirm the current and proposed Use Level classification with the Planning Division before assuming a change of use is exempt from Chapter 15.14 compliance

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Certificate of OccupancyConsistent with this file's residential-building-permit entry and general City of Laramie practice; no dedicated CO fee schedule was found published separately from the building permit process
No separate fee — issued at no additional cost after a successful final inspection
Site Plan Review - Type 1 (Limited Compliance)Planning, Zoning and Engineering Fees, Attachment A (adopted by City Council June 7, 2016, effective same date) — applies only if the change of use triggers Chapter 15.14 compliance review
$35
Site Plan Review - Type 2 (Partial Compliance)Planning, Zoning and Engineering Fees, Attachment A
$225
Site Plan Review - Type 3 (Full Compliance)Planning, Zoning and Engineering Fees, Attachment A
$420

Review timeline

Plan review
Not published — contact the department

How long did your Certificate of Occupancy / Change of Use permit actually take in Laramie?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Building Inspection

    Required under the applicable building permit before a Certificate of Occupancy is issued

See the full Laramie inspection guide — scheduling & re-inspection fees →

Tips

  • Laramie has no standalone 'change of use permit' — whether a change of use requires extra review depends entirely on whether the new use falls within the same numbered Use Level (Table 15.10-2) as the prior use.
  • Staying within the same Use Level (e.g., swapping one Level-6 retail tenant for another) avoids triggering Chapter 15.14 Development Standards review — but crossing Use Levels brings the ENTIRE existing development into compliance with current parking, landscaping, screening, buffering, and building design standards, not just the space changing use.
  • Always confirm your current and proposed Use Level with the Planning Division before signing a lease or starting tenant improvements — the code's own worked example (financial institution to clothing store) shows how narrow 'same Use Level' can be in practice.

Frequently asked questions

Laramie requires a certificate of occupancy / change of use permit for: A Certificate of Occupancy is required before occupying any new building, addition, or altered/changed-use space; it is issued after a successful final inspection under whatever building permit governs the work, at no separate CO fee (consistent with this file's residential-building-permit entry); LMC 15.10.010 (Change of Use) assigns every land-use category in Table 15.10-1 to one of 14 numbered 'Use Levels' in Table 15.10-2 (e.g., Level 1 = Agriculture/Household Living; Level 6 = Financial Service, Office and Technology, Personal Services, Retail Sales; Level 7 = Food and Beverage Services, Outdoor/Indoor Recreation; Level 14 = Waste and Salvage); A change of use WITHIN the same Use Level does NOT require compliance with Chapter 15.14 Development Standards, per LMC 15.14.010.B.4.a — the code's own example: converting a financial institution (Level 6) to a clothing store (Level 6-Retail) triggers no additional site/building standards review; A change of use that moves OUTSIDE the existing Use Level DOES require full compliance with Chapter 15.14 Development Standards — building design, building materials, parking, landscaping, screening, buffering, and public improvements — applied to the ENTIRETY of the existing development, not just the portion changing use (LMC 15.14.010.B.2 and B.4); There is no dedicated 'change of use permit' product or fee; the physical work associated with a change of use is processed through the standard building permit (see this file's commercial-tenant-improvement-permit entry), and any Chapter 15.14-triggering change additionally requires the applicable Planning Division site plan review (Type 1/Limited, Type 2/Partial, or Type 3/Full Compliance, per the Planning, Zoning and Engineering Fees schedule); Confirm the current and proposed Use Level classification with the Planning Division before assuming a change of use is exempt from Chapter 15.14 compliance. If your project isn't listed, confirm with City of Laramie Code Administration Division (Building Department) at (307) 721-5271 before starting work.

No separate fee — a Certificate of Occupancy is issued at no additional cost after a successful final inspection under the applicable building permit. If a change of use triggers Planning Division site plan review, that review carries its own fee ($35-$420 depending on compliance type, per the Planning, Zoning and Engineering Fees schedule).

Laramie does not publish a plan-review timeline for this permit. Contact City of Laramie Code Administration Division (Building Department) at (307) 721-5271 for current turnaround.

You'll need: Building Permit Application (via Civic Access portal), for any tenant-improvement or change-of-use-related work. Depending on your project, Laramie may also ask for: Site Plan Review Application (Type 1, 2, or 3, via the Planning Division). See the required-documents checklist on this page for details on each.

Laramie requires 1 inspection(s) for a certificate of occupancy / change of use permit, in order: Final Building Inspection. Schedule each through City of Laramie Code Administration Division (Building Department) ((307) 721-5271).

Apply through City of Laramie Code Administration Division (Building Department) at 320 E. Grand Avenue, Laramie, WY 82070 (temporary location while the Historic Carnegie Building at 405 Grand Avenue undergoes renovations; mailing address P.O. Box C, Laramie, WY 82073). Phone: (307) 721-5271, email: codeadmin@cityoflaramie.org. Office hours: Mon–Fri, 9:00 a.m.–3:00 p.m. (per Building Department Staff page, current); older bulletins/forms list Mon–Thu 8 a.m.–4 p.m., Fri 8 a.m.–2 p.m. — confirm current hours by phone. Official information: https://www.cityoflaramie.org/432/Building-Permits-and-Informational-Bulletins.

Laramie, Wyoming has adopted: 2024 International Building Code (IBC) — adopted by the City of Laramie (Bulletin #2 Codes and Design Information, Feb. 2026 edition); Contractor Licensing page confirms the City adopted the 2024 ICC cycle effective September 1, 2024; 2024 International Residential Code (IRC) for One- and Two-Family Dwellings; 2024 International Existing Building Code (IEBC); 2024 International Mechanical Code (IMC); 2024 International Plumbing Code (IPC) — Laramie uses IPC (per Building Department (Code Administration) page), not the Uniform Plumbing Code; 2024 International Fuel Gas Code (IFGC); 2024 International Property Maintenance Code (IPMC); 2024 International Fire Code (IFC); 2024 International Energy Conservation Code (IECC); 2026 National Electrical Code (NEC), published by NFPA, adopted with certain local amendments, additions and deletions [2026-07-17 re-verification RESOLVED: LMC § 15.24.030(A)(1) adopts the NEC ambulatorily — "the most recently issued editions of the National Electrical Code is adopted by reference" — in a dedicated NEC-specific section (not merely inherited from the ICC cycle), so the governing edition tracks whatever NFPA's current edition is. The Wyoming State Fire Marshal confirms the 2026 NEC took effect statewide July 1, 2026 (wsfm.wyo.gov/electrical-safety). The City's Informational Bulletin #2 (dated Feb. 2026, i.e. before that July 1 transition) still lists "(2023)" — accurate when written, now stale, not a genuine ordinance/bulletin conflict. The 2023 NEC is retained here only as prior-edition history; see electrical-permit tips for the full resolution]; ICC A117.1 (2017) — ADA/accessibility standard; Laramie Municipal Code (LMC) Title 15.24 — Buildings and Construction (local amendments to the above codes); most recently amended by Ordinance No. 1881 (effective May 23, 2026) and Ordinance No. 1870 (effective Sept. 19, 2025). Local amendments apply — see the Laramie overview page for the full list.

No. Change of use is a zoning classification question under LMC 15.10.010 (Use Levels), not a standalone permit. If the new use stays within the same Use Level as the old one, no extra Chapter 15.14 compliance review is triggered; if it crosses Use Levels, the entire existing development must come into compliance with current development standards before a new Certificate of Occupancy can issue.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Laramie building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.