Certificate of Occupancy / Change of Use — Gillette, Wyoming · Requirements sheet
Verified 2026-07-22 · Source: https://www.gillettewy.gov/Departments/Development-Services/Building-Division
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Certificate of Occupancy / Change of Use in Gillette, Wyoming
Gillette has NO stand-alone 'Change of Use Permit' or separate 'Certificate of Occupancy' application/fee in City Code Chapter 5. A change to a building's occupancy classification is governed by the adopted International Existing Building Code (IEBC, 2021 Edition, City Code § 5-I-9), which by its own scope regulates the repair, alteration, change of occupancy, addition, and relocation of existing buildings. A Certificate of Occupancy (CO) or Temporary Certificate of Occupancy (TCO) is issued by Building Inspection as the FINAL STEP of the standard building-permit process — shown as the terminal 'TCO/CO — CERTIFICATE OF OCCUPANCY — BUILDING INSPECTION' box on the City's own Commercial Building Permit Process flow chart — not as an independently-applied-for product with its own line item in the § 5-IV fee schedule.
Verified 2026-07-22 · Source
When you need this permit
- No dedicated 'Change of Use' or 'Certificate of Occupancy' permit type or fee line exists anywhere in City Code Chapter 5, Article IV (confirmed by a full read of the adopted fee schedule, Revised 6-16-2026)
- A proposed change in use/occupancy classification for an existing building is evaluated by the Building Division under the adopted IEBC (2021 Edition, § 5-I-9); whether the change triggers permitted construction work depends on the specific occupancy-classification change and any life-safety/structural upgrades the IEBC requires for it
- If the change involves only minor commercial remodel work (≤500 sq ft, no new floor area), it is typically processed under the flat $30 'Miscellaneous Commercial' fee (City Code § 5-IV-1(b)) rather than a full commercial plan review
- If the change triggers a fuller scope of work, it follows the standard Commercial Tenant Improvement/Commercial Building Permit process (Planning Division site plan review → Building Inspection Division plan review/permit → Engineering Division ROW review if needed) — see the commercial-tenant-improvement-permit entry for that process and fee table in full
- Fire plans for the new occupancy are routed to Campbell County Fire Department as part of the Building Inspection Division submittal, same as any other commercial building permit
- The Commercial Building Permit Process flow chart's terminal step is 'TCO/CO Certificate of Occupancy — Building Inspection', issued after Council acceptance of utilities (if applicable) and Final Location Certificate (FLC) submittal to Planning/GIS — there is no separate CO application box on the flow chart
- Contact the Building Division ((307) 686-5260) before opening a new tenant space or business in an existing building to confirm whether the proposed new use/occupancy classification requires permitted work and, if so, which permit type(s) apply
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
TCO/CO — Final Building Inspection
Temporary Certificate of Occupancy or Certificate of Occupancy issued by Building Inspection as the terminal step of the Commercial Building Permit Process, after Council acceptance of utilities (if applicable) and Final Location Certificate (FLC) submittal to Planning/GIS
See the full Gillette inspection guide — scheduling & re-inspection fees →
Tips
- Don't go looking for a 'Change of Use Permit' application in Gillette's EnerGov portal — it doesn't exist as its own product. Occupancy-classification changes are handled through whichever building-permit type matches the actual construction scope, governed by the adopted IEBC.
- Moving a new business into an existing commercial space with no construction work still may need Building Division sign-off if the new use represents a different IEBC occupancy classification than the prior tenant — call (307) 686-5260 before signing a lease to confirm.
- The Certificate of Occupancy is the LAST step of the commercial building-permit flow chart, not a separate first step — plan on it arriving only after utilities acceptance and the Final Location Certificate submittal.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gillette building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Gillette
Certificate of Occupancy / Change of Use in other cities
Compare certificate of occupancy / change of use fees across Wyoming →