Deck Permit — Gillette, Wyoming · Requirements sheet
Verified 2026-07-16 · Source: https://www.gillettewy.gov/Departments/Development-Services/Building-Division/Residential-Building-Guides
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Deck Permit in Gillette, Wyoming
Required for most residential decks in Gillette under the IRC. Note that the live code text reads 2021 Edition, not the 2024 Edition — see codesAdopted. A flat $20 permit fee applies; small, low, detached decks not serving the main exit door are exempt from a building permit, though a zoning permit is generally still required.
Verified 2026-07-16 · Source
When you need this permit
- Decks exceeding 200 sq ft, attached to the dwelling, more than 30 inches above grade (within 36 inches of the deck), or serving the main exit door require a building/zoning permit
- Decks NOT exceeding 200 sq ft, NOT attached to the dwelling, NOT more than 30 inches above grade within 36 inches, and NOT serving the main exit door do not need a building permit (a zoning permit is still required in most instances)
- Footings: minimum 42 inches deep from finish grade to bottom of footing, 8 inches thick, extending 2 inches beyond post sides on all sides
- Posts: 4x4 minimum up to 8 ft height; 5x6 required over 8 ft; must rest on footings, secured with a galvanized steel post base or equivalent
- Decks 18 inches or less above finished grade must use pressure-treated or decay-resistant lumber (measured from the bottom of the floor joists)
- Ledger boards require proper flashing (stainless steel, UV-resistant plastic, or G-185 galvanized steel) at the connection to the house
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Footing
Before concrete pour — verify 42-inch minimum depth and post footing dimensions
- 2
Framing
Ledger board attachment/flashing, joist hangers, post/beam connections
- 3
Final
Completed deck per approved plans
See the full Gillette inspection guide — scheduling & re-inspection fees →
Tips
- A deck under 200 sq ft that's detached from the house, low (≤30 in. within 36 in. of the deck), and not at the main entry can skip the building permit — but confirm with the Building Division at (307) 686-5260, since a zoning permit is still typically required.
- Ledger board attachment requires the house siding/exterior finish to be removed first and proper flashing installed — a common inspection failure point.
- The $20 flat fee makes decks one of the cheapest permit types in Gillette.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fee schedules
Checklists & handouts
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gillette building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Gillette's permit history is searchable by address
414 permits in our copy of Gillette's register — searchable by street address, with permit type, status, issued date and valuation where the city publishes them. This is what we hold, not a statement of everything Gillette has issued.
All 414 carry an issued date, running from 2021 to 2026.
91% of Gillette's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.
Other permits in Gillette
Deck Permit in other cities
Compare deck permit fees across Wyoming →
Look up this fee in a different city →
Related guides
Now live
Build your Gillette project checklist
Describe your project once and get every permit, document, and fee it triggers in Gillette — in one checklist. Free, for any city and any number of projects.
Get started →