Fire Alarm System Permit in Gillette, Wyoming
Required for installation of a commercial/industrial fire alarm system in Gillette. Campbell County Fire Department (CCFD) lists "Fire Alarm System" as its own distinct plan-review category (separate from Fire Sprinkler System) and "fire alarm acceptance" as its own distinct construction-inspection type — but unlike fire sprinkler systems, Gillette's City Code Chapter 5, Article IV fee schedule has NO dedicated fire-alarm fee line item. This is a genuine, confirmed gap after a full read of the adopted fee schedule, not an omission in this entry.
Reviewed 2026-07-22 · Source
When you need this permit
- Campbell County Fire Department's published Plan Review list separately names "Fire Alarm System" alongside "Fire Sprinkler System" as its own plan-review category, using Wyoming State Fire Marshal's Office (WSFO) checklist forms for the submittal
- CCFD states that if a submittal is missing required information, the review cannot be completed and a resubmittal is required
- "Fire alarm acceptance" is listed as its own CCFD construction-inspection type, distinct from the sprinkler rough-in/hydro inspections
- CCFD inspection scheduling requires at least 48 hours advance notice (call (307) 682-5319)
- Fire alarm plans for new commercial construction are also routed to CCFD as part of the standard Commercial Tenant Improvement/Commercial Building Permit submittal (see that entry)
- City Code Chapter 5, Article III's contractor-license structure (Article III sections A-H) has no dedicated fire-alarm contractor license category — alarm/low-voltage work is typically performed under state-level licensure rather than a City of Gillette trade license; confirm current requirements with the Building Division at (307) 686-5260 Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City Code Chapter 5, Article IV (§ 5-IV-1 through § 5-IV-3, the complete adopted fee schedule as of the 6-16-2026 revision) contains a dedicated $30 line item for "Fire Sprinkler Systems" but NO… Show full citationHide
City Code Chapter 5, Article IV (§ 5-IV-1 through § 5-IV-3, the complete adopted fee schedule as of the 6-16-2026 revision) contains a dedicated $30 line item for "Fire Sprinkler Systems" but NO corresponding line item for fire alarm systems — do not assume the $30 sprinkler fee also covers fire alarm systems. Nor does the state fill the gap: under W.S. 35-9-108, the Wyoming State Fire Marshal's statewide Department of Fire Prevention and Electrical Safety Rules Ch. 2 § 3 fee schedule ($16.03 for the first valuation tier, etc. — the schedule that applies in Green River and Evanston) does NOT apply in Gillette, because WSFM's own 'LOCAL AND STATE JURISDICTIONS' chart (legend 'L – MUNICIPALITY/COUNTY ENFORCES · S – STATE ENFORCES') lists the row 'CAMPBELL COUNTY / Gillette / Wright' with FIRE INSP = LLL and FIRE PR = LLL, i.e. all three jurisdictions enforce and plan-review fire locally. Gillette performs its own fire plan review, so the state fee schedule must not be applied to it, and the absence of a published city fire-alarm fee is a real gap. Do not resolve it by borrowing either the $30 sprinkler line or the state schedule; confirm current fee treatment directly with the Building Division ((307) 686-5260) or CCFD ((307) 682-5319) before budgeting.Review timeline
Inspection process
- 1
Fire Alarm Acceptance
CCFD acceptance test/inspection of the completed fire alarm system, per CCFD's published inspection-type list; schedule at least 48 hours in advance via (307) 682-5319
See the full Gillette inspection guide — scheduling & re-inspection fees →
Tips
- Don't assume the $30 Fire Sprinkler Systems fee from City Code § 5-IV-1(b) also applies to a fire alarm system — the adopted fee schedule does not carry a matching line item for fire alarm, and this jurisdiction's data-integrity policy prohibits guessing a fee that isn't published. Call ahead to confirm what, if anything, will be charged.
- CCFD treats fire alarm and fire sprinkler as two separate plan-review and inspection tracks (separate WSFO checklists, separate 'fire alarm acceptance' vs. 'sprinkler rough-in/hydro' inspections) — don't combine the two scopes into one submittal expecting a single review.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-22.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gillette building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Gillette's permit history is searchable by address
414 permits on record for Gillette, 2021–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
91% of Gillette's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.
Other permits in Gillette
Fire Alarm System Permit in other cities
Compare fire alarm system permit fees across Wyoming →