Skip to main content
PermitBase

Fire Alarm System Permit in Gillette, Wyoming

Required for installation of a commercial/industrial fire alarm system in Gillette. Campbell County Fire Department (CCFD) lists "Fire Alarm System" as its own distinct plan-review category (separate from Fire Sprinkler System) and "fire alarm acceptance" as its own distinct construction-inspection type — but unlike fire sprinkler systems, Gillette's City Code Chapter 5, Article IV fee schedule has NO dedicated fire-alarm fee line item. This is a genuine, confirmed gap after a full read of the adopted fee schedule, not an omission in this entry.

Reviewed 2026-07-22 · Source

When you need this permit

  • Campbell County Fire Department's published Plan Review list separately names "Fire Alarm System" alongside "Fire Sprinkler System" as its own plan-review category, using Wyoming State Fire Marshal's Office (WSFO) checklist forms for the submittal
  • CCFD states that if a submittal is missing required information, the review cannot be completed and a resubmittal is required
  • "Fire alarm acceptance" is listed as its own CCFD construction-inspection type, distinct from the sprinkler rough-in/hydro inspections
  • CCFD inspection scheduling requires at least 48 hours advance notice (call (307) 682-5319)
  • Fire alarm plans for new commercial construction are also routed to CCFD as part of the standard Commercial Tenant Improvement/Commercial Building Permit submittal (see that entry)
  • City Code Chapter 5, Article III's contractor-license structure (Article III sections A-H) has no dedicated fire-alarm contractor license category — alarm/low-voltage work is typically performed under state-level licensure rather than a City of Gillette trade license; confirm current requirements with the Building Division at (307) 686-5260 Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fire Alarm System Permit feeA full read of City Code Chapter 5, Article IV (§ 5-IV-1 through § 5-IV-3, the complete adopted fee schedule as of the 6-16-2026 revision) turned up a dedicated $30 line item for "Fire Sprinkler Systems" but NO corresponding line item for fire alarm systems. This is reported as a confirmed gap, not a fabricated or assumed fee — do not assume the $30 sprinkler fee also covers fire alarm systems. Confirm current fee treatment directly with the Building Division ((307) 686-5260) or CCFD ((307) 682-5319) before budgeting.
Not published

Review timeline

Plan review
Not published — contact the department

How long did your Fire Alarm System Permit permit actually take in Gillette?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Fire Alarm Acceptance

    CCFD acceptance test/inspection of the completed fire alarm system, per CCFD's published inspection-type list; schedule at least 48 hours in advance via (307) 682-5319

See the full Gillette inspection guide — scheduling & re-inspection fees →

Tips

  • Don't assume the $30 Fire Sprinkler Systems fee from City Code § 5-IV-1(b) also applies to a fire alarm system — the adopted fee schedule does not carry a matching line item for fire alarm, and this jurisdiction's data-integrity policy prohibits guessing a fee that isn't published. Call ahead to confirm what, if anything, will be charged.
  • CCFD treats fire alarm and fire sprinkler as two separate plan-review and inspection tracks (separate WSFO checklists, separate 'fire alarm acceptance' vs. 'sprinkler rough-in/hydro' inspections) — don't combine the two scopes into one submittal expecting a single review.

Frequently asked questions

Gillette requires a fire alarm system permit for: Campbell County Fire Department's published Plan Review list separately names "Fire Alarm System" alongside "Fire Sprinkler System" as its own plan-review category, using Wyoming State Fire Marshal's Office (WSFO) checklist forms for the submittal; CCFD states that if a submittal is missing required information, the review cannot be completed and a resubmittal is required; "Fire alarm acceptance" is listed as its own CCFD construction-inspection type, distinct from the sprinkler rough-in/hydro inspections; CCFD inspection scheduling requires at least 48 hours advance notice (call (307) 682-5319); Fire alarm plans for new commercial construction are also routed to CCFD as part of the standard Commercial Tenant Improvement/Commercial Building Permit submittal (see that entry); City Code Chapter 5, Article III's contractor-license structure (Article III sections A-H) has no dedicated fire-alarm contractor license category — alarm/low-voltage work is typically performed under state-level licensure rather than a City of Gillette trade license; confirm current requirements with the Building Division at (307) 686-5260. If your project isn't listed, confirm with City of Gillette Development Services — Building Division at (307) 686-5260 before starting work.

Not published. Unlike fire sprinkler systems, which carry an explicit $30 City Code fee line item (§ 5-IV-1(b)), Gillette's adopted fee schedule has no corresponding fee for fire alarm systems as of the 2026-07-22 chase. Confirm current fee treatment directly with the Building Division ((307) 686-5260) or Campbell County Fire Department ((307) 682-5319).

Gillette does not publish a plan-review timeline for this permit. Contact City of Gillette Development Services — Building Division at (307) 686-5260 for current turnaround.

You'll need: Fire Alarm System Plan Review Submittal (per WSFO checklist, routed to CCFD); Building Permit / Fire Plans (via EnerGov Self Service). See the required-documents checklist on this page for details on each.

Gillette requires 1 inspection(s) for a fire alarm system permit, in order: Fire Alarm Acceptance. Schedule each through City of Gillette Development Services — Building Division ((307) 686-5260).

Apply through City of Gillette Development Services — Building Division at City Hall, 201 E. 5th St., 2nd Floor, Gillette, WY 82716. Phone: (307) 686-5260, email: Not published on city site — use "Send an E-mail" contact form on the Building Division page or main line gillette@gillettewy.gov. Office hours: Mon–Fri (contact department for current hours); permits/plans/licenses/inspections managed via EnerGov Self Service online portal (registration required). Official information: https://www.gillettewy.gov/Departments/Development-Services/Building-Division.

Gillette, Wyoming has adopted: International Building Code (IBC), 2021 Edition — including Appendix C, adopted by City of Gillette Code Chapter 5, Article I § 5-I-2 (Revised 6-16-2026). CHANGED 2026-07-16 audit: the live § 5-I-2.A text now reads "2021 Edition, including Appendix C" and no longer cites Ord. 4052 (12-17-2024), which had adopted the 2024 IBC edition with Appendices C and H per the source PDF as of the prior 2026-07-01 verification; the 2024-edition adoption no longer appears in the current ordinance text.; International Residential Code (IRC), 2021 Edition — including Appendices AA, AB, AC, AE, AN, AQ, and AW (AW 3D Printed Construction), adopted § 5-I-3 (Revised 6-16-2026). CHANGED 2026-07-16 audit: the live § 5-I-3.A text now reads "2021 Edition" with this different appendix set (previously 2024 Edition, Appendices CA, CB, BA, CE, BB, BM per Ord. 4052, 12-17-2024, which no longer appears in the current ordinance text).; International Plumbing Code (IPC), 2021 Edition — including Appendices B, D, E, adopted § 5-I-4 (Revised 6-16-2026) — NOTE: Gillette uses the IPC, not the Uniform Plumbing Code. CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited); appendices B, D, E unchanged.; International Mechanical Code (IMC), 2021 Edition — adopted § 5-I-5 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited).; National Electrical Code — City Code § 5-I-6 (Revised 6-16-2026) (including Article 80/Annex H). CHANGED 2026-07-16 audit: the live § 5-I-6.A paragraph now contains two different edition references in the same sentence — "...adopted by reference the National Electrical Code, 2023 Edition..." and later "...of the National Electrical Code, 2026 Edition, including Article 80, are hereby referred to, adopted..." — with the amendment history newly listing Ord. 4081 (6-16-2026) as the latest ordinance for this section. The ordinance's own text does not reconcile the two edition years; previously cited cleanly as 2023 Edition only.; International Fuel Gas Code (IFGC), 2021 Edition — including Appendices A, B, C, D, adopted § 5-I-7 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited); appendices A, B, C, D unchanged.; International Fire Code (IFC), 2021 Edition — including Appendices B, C, D, E, F, and G, adopted § 5-I-8 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 and Appendices H and I are absent (previously 2024 Edition with Appendices B–I per Ord. 4052, 12-17-2024, no longer cited).; International Existing Building Code (IEBC), 2021 Edition — adopted § 5-I-9 (Revised 6-16-2026). CHANGED 2026-07-16 audit: § 5-I-9.A reads "2021 Edition" (previously cited as 2024 Edition; the current text carries no ordinance citation for the edition line).; Uniform Code for the Abatement of Dangerous Buildings, 1997 Edition — adopted § 5-I-10 (Revised 6-16-2026); edition unchanged, only the chapter revision date-stamp updated at the 2026-07-16 audit.. Local amendments apply — see the Gillette overview page for the full list.

Campbell County Fire Department reviews fire alarm plans, listing 'Fire Alarm System' as its own plan-review category (using Wyoming State Fire Marshal's Office checklist forms) separate from fire sprinkler systems, and performs a distinct 'fire alarm acceptance' inspection.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gillette building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.