Residential Building Permit (New Construction) — Gillette, Wyoming · Requirements sheet
Verified 2026-07-16 · Source: https://www.gillettewy.gov/Departments/Development-Services/Building-Division
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction) in Gillette, Wyoming
Required for new single-family dwellings and other one- and two-family residential construction in Gillette. Governed by the IRC per City Code § 5-I-3 — live text as of 2026-07-16 reads 2021 Edition (previously 2024 Edition; see codesAdopted). Fee is based on total building square footage per the adopted schedule in City Code § 5-IV-1(b), reverified unchanged 2026-07-16.
Verified 2026-07-16 · Source
When you need this permit
- Building permit required for all new one- and two-family residential construction
- Plans required for all dwellings (no plan review fee is charged for one- and two-family dwellings)
- Applications and plan sets submitted digitally via EnerGov Self Service portal
- Foundation plan must be stamped by a Wyoming-licensed engineer, with written verification of footing/foundation type from the soils engineer, submitted before the footing inspection
- A Foundation Location Certificate prepared and signed by a licensed Wyoming surveyor must be submitted before any inspections beyond sill plate are completed
- Wyoming 811 (One Call) must be contacted prior to excavation
- Contractor must hold a current City of Gillette contractor license (Class A/B/R as applicable) Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Open Hole Letter / Footing
Open Hole Letter sent to Building Inspection before footing inspection; soils engineer verification of footing/foundation type on file; rebar tied before concrete pour
- 2
Foundation Wall
After forms and rebar tied, before concrete placed
- 3
Damp-Proofing / Drain Tile
Before backfill placed around foundation or crawl space walls
- 4
Underground Plumbing
After all underground waste/vent/water piping installed and under test, before backfill/concrete
- 5
Sill Plate
When sill plate and sill seal are bolted in place, before floor system installed
- 6
Rough Plumbing / Rough Electric / Rough Mechanical / Gas
After respective waste/vent/water piping, wiring/boxes, venting/ductwork, and gas piping are installed and (for gas) under air test
- 7
Exterior Vapor Barrier, Windows & Doors Flashing, Rough Framing
After rough MEP/gas inspections complete, roofing done, framing and fire blocking complete, structure weather-tight
- 8
Insulation
After framing, before drywall on walls (sprayed ceiling insulation inspected at final)
- 9
Sewer and Water
After sewer and water lines installed, before backfill
- 10
Final / Certificate of Occupancy
Prior to moving furnishings into the building; tap fees must be paid when the permit is issued
See the full Gillette inspection guide — scheduling & re-inspection fees →
Tips
- Fee is based on total building square footage under a simple tiered table — not a percentage-of-valuation model like many other cities.
- Plan review is free for one- and two-family dwellings in Gillette — unlike commercial projects, which pay $100/$200/$1,125/$1,500 for the 1st/2nd/3rd/4th+ review.
- Call the Inspection Line before 7:00 a.m. to get a same-day inspection; field inspectors are generally in the office 8–9 a.m. and 1–2 p.m.
- A Foundation Location Certificate from a licensed Wyoming surveyor is required before any inspection beyond the foundation stage can proceed.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gillette building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Gillette
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Wyoming →
Look up this fee in a different city →