Residential Building Permit (New Construction) — Riverton, Wyoming · Requirements sheet
Verified 2026-07-01 · Source: https://www.rivertonwy.gov/departments/community_dev/building_permits___inspections/index.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction) in Riverton, Wyoming
Required for new single-family dwellings, manufactured homes on permanent foundations (IRC or HUD standard), and accessory buildings/additions/covered decks in the City of Riverton. Governed by the 2024 IRC (Riverton Municipal Code Chapter 15.04, Ordinance No. 25-003).
Verified 2026-07-01 · Source
When you need this permit
- Submit a completed Application for Building Permit (or Simple Permit Application for smaller scopes)
- Submit two (new residential checklist) or three (per the application's submittal checklist) complete sets of plans and specifications, or one electronic copy
- Site plan showing property lines, north arrow, easements, dimensions, and all development
- Floor plans, building elevations (N/S/E/W), foundation plan, roof/truss plan with engineered truss data
- Framing sections (wall height, eave width, roof pitch) and other construction details
- A letter from the Director of Public Works certifying availability of water and sewer service for the land (RMC § 15.04.010.A.1.a(4))
- Engineering calculations required for any design deviating from conventional IBC/IRC framing, stamped by a Wyoming-licensed architect/engineer
- Projects requiring professional design: most new commercial/industrial buildings, buildings 3+ stories, residential buildings with 5+ living units
- Automatic sprinklers NOT required for detached one- and two-family dwellings or townhouses built to the IRC (locally amended IBC § 903.2.8 exception)
- Planning Division approval of setbacks (RMC § 17.16.070) required before building permit submittal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Temporary Electric Service
After installation of the temporary meter base post with approved grounding; may be installed by a licensed electrical contractor or homeowner
- 2
Footing
Forms and rebar in place and tied before concrete placement
- 3
Foundation Wall
After forms are in place and vertical/horizontal rebar tied, before concrete placement
- 4
Perimeter Drain
Before backfill is placed around foundation walls enclosing an interior space below finished grade
- 5
Underground Plumbing
After all underground waste/vent/water plumbing is installed and pressure tested, before backfill/concrete
- 6
Interior Footings
After forms and rebar in place; interior footings isolated from the floor slab
- 7
Rough Plumbing / Rough Electric / Rough Mechanical / Gas
Required after wiring/boxes, waste/vent/water piping, venting/ductwork, and gas piping are installed, prior to insulation and sheetrock
- 8
Rough Framing / Penetration Sealing
After rough electrical, plumbing, mechanical, gas, roofing, and framing are complete and the structure is weather tight
- 9
Sewer and Water
After sewer and water service lines are installed, before backfill
- 10
Final Inspection
After the building is completed and ready for occupancy; a Certificate of Occupancy is required before moving in furnishings or occupying the structure
See the full Riverton inspection guide — scheduling & re-inspection fees →
Tips
- The permit application is a single combined form covering building, plumbing, electrical, and mechanical scope — no need for four separate applications for a typical new home.
- Fees are charged per square foot of building area (not a percentage-of-valuation table like many other cities) — $0.42/sq ft for new residential construction under Resolution No. 1355.
- Call the Community Development Department at (307) 856-2999 at least one business day before you need any inspection; give the permit number and inspection type.
- Riverton's 2024 code cycle (Ordinance No. 25-003) took effect March 22, 2025 — confirm which edition applies if your project spans the transition from the prior 2021 codes.
- A Director of Public Works letter confirming water/sewer availability is a locally-added submittal requirement (RMC § 15.04.010.A.1.a(4)) not found in the stock IBC.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Riverton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Riverton
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Wyoming →
Look up this fee in a different city →
Related guides
Now live
Build your Riverton project checklist
Describe your project once and get every permit, document, and fee it triggers in Riverton — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →