EV Charging Station Permit (Electrical Permit) — Riverton, Wyoming · Requirements sheet
Verified 2026-07-20 · Source: https://www.rivertonwy.gov/departments/community_dev/building_permits___inspections/index.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charging Station Permit (Electrical Permit) in Riverton, Wyoming
Required for installation of a Level 2 (or higher) electric vehicle charging station/EVSE within Riverton city limits, permitted under the City's standard Electrical Permit process (RMC Chapter 15.08). City of Riverton Resolution No. 1355 has no dedicated EV charger/EVSE fee line item — the same finding this file's solar-pv-permit entry documents for solar — so an EV charger circuit is charged under the general Electrical Alteration or Electrical Service Upgrade fee categories, whichever fits the scope of work.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for the new/upgraded circuit and EVSE connection under RMC Chapter 15.08
- Installation must comply with NEC Article 625 (Electric Vehicle Power Transfer System) as adopted by the City
- A standalone new dedicated circuit for an EVSE is expected to fall under the 'Electrical Alteration' fee category; a project also requiring a panel/service upgrade would fall under 'Electrical Service Upgrade' instead
- If installed as part of new construction, the EV charger circuit is covered by the new-construction per-square-foot fee, which 'includes building and all building systems' per Resolution No. 1355
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electric (if applicable)
Conduit runs, wire sizing, and disconnect placement before cover
- 2
Final
EVSE breaker sizing, working clearances, and final electrical connections verified
See the full Riverton inspection guide — scheduling & re-inspection fees →
Tips
- There is no separate EV-charger-specific fee line in Resolution No. 1355 — budget for the general Electrical Alteration category ($26.00 minimum) for a standalone circuit, or Electrical Service Upgrade ($52.00 minimum) if a panel/service upgrade is also required.
- If the EV charger is installed as part of new construction, it is covered under the new-construction per-square-foot fee rather than a separate electrical line item.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Riverton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Riverton
EV Charging Station Permit (Electrical Permit) in other cities
Compare ev charging station permit (electrical permit) fees across Wyoming →
Look up this fee in a different city →
Related guides
Now live
Build your Riverton project checklist
Describe your project once and get every permit, document, and fee it triggers in Riverton — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →