EV Charger / Electric Vehicle Charging Station Permit — Green River, Wyoming · Requirements sheet
Verified 2026-07-20 · Source: https://www.cityofgreenriver.org/425/Obtaining-a-Building-Permit
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / Electric Vehicle Charging Station Permit in Green River, Wyoming
Installing an EV charger circuit in Green River is electrical work regulated by the locally-enforced National Electrical Code (2026 NEC effective statewide July 1, 2026, per the Wyoming State Fire Marshal's Office; 2023 NEC applied previously). Green River has no distinct EV-charger permit type, application, or flat fee -- an EV charger circuit requires a standard City Electrical Permit, charged under the same general valuation-based Development Services fee schedule used for all electrical work (residential at 50% of the table, commercial/multi-family at 100%), the identical mechanism already documented in this corpus's electrical-permit and solar-pv-permit entries for Green River.
Verified 2026-07-20 · Source
When you need this permit
- Electrical Permit Application (checkbox on the City's Building Permit Application, DocumentCenter Doc #5572) required for a new dedicated EV charger circuit, per Sec. 7-76 (NEC adoption) and the Wyoming-licensed electrical contractor requirement
- Work must be performed by a Wyoming-licensed electrical contractor (or under a homeowner exemption where applicable), per City of Green River electrical permitting requirements Owner-builder
- No distinct EV-charger checklist or valuation-based line item is published; the general valuation-based Development Services Fees schedule (effective July 1, 2018) applies
- If the installation requires a new/upgraded electrical service to support the charger load, that scope is included in the same electrical permit valuation, not billed separately
- Confirm with Development Services (307) 872-6140 whether the specific installation needs additional review
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement verified before cover
- 2
Final — Electrical
New circuit, breaker sizing, and disconnect verified before the charger is energized
See the full Green River inspection guide — scheduling & re-inspection fees →
Tips
- Green River does not publish an EV-charger-specific permit type or fee -- budget using the general valuation-based electrical fee table and confirm exact project cost classification with Development Services before applying.
- This mirrors exactly how the City handles solar PV's electrical/interconnection scope -- both use the same general valuation-based Development Services fee schedule, since Green River has no dedicated fee line for either.
- Governed by the 2026 NEC (effective statewide July 1, 2026), including NEC Article 625 (Electric Vehicle Power Transfer System).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Green River building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Green River
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Wyoming →
Look up this fee in a different city →
Related guides
Now live
Build your Green River project checklist
Describe your project once and get every permit, document, and fee it triggers in Green River — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →