Green River building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Green River, Wyoming.
Verified 2026-07-01 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 50 E 2nd North Street, Green River, WY 82935
- Phone
- (307) 872-6140
- Office hours
- Monday through Friday, 8:00 a.m. to 5:00 p.m.
- Website
- Official site
Published scheduling rules
- Required inspections must be scheduled with Development Services a minimum of 24 hours in advance, (307) 872-6140 (Change of Use / Change of Occupancy Permit)
Inspection sequence
Applies to: Residential Addition / Remodel Permit
- 1
Foundation (if new footings)
Before concrete pour, if the addition involves new footings
- 2
Framing
After framing, before insulation or wall cover
- 3
MEP Rough-In
Electrical, plumbing, mechanical rough-in as applicable before walls closed
- 4
Final
All work complete per approved plans
Applies to: Residential Building Permit (New Construction)
- 1
Foundation / Footing
Before concrete pour — footings must extend below the 42-inch local frost line
- 2
Framing
After framing complete, before insulation or wall cover
- 3
MEP Rough-In
Mechanical, electrical, and plumbing rough-in before walls closed; electrical rough-in performed by the City under Home Rule
- 4
Final
All work complete, ready for certificate of occupancy
Applies to: Commercial Tenant Improvement Permit
- 1
Framing / Structural
After framing, before wall cover
- 2
MEP Rough-In
Mechanical, electrical, plumbing rough-in before walls closed
- 3
Final / Certificate of Occupancy
All work complete, life-safety systems verified
Applies to: Solar PV Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before cover
- 2
Final — Structural/Racking
Panel mounting and roof penetration sealing verified
- 3
Final — Electrical
Interconnection point and system energization verified by City inspection
Applies to: Demolition Permit
- 1
Pre-Demolition Utility Shutoff Verification
City of Green River Building Department verifies gas, electric, and water/sewer are properly shut off before demolition begins
- 2
Final
Site cleared, backfilled, leveled, and debris removed within 60 days after demolition
Applies to: Electrical Permit
- 1
Rough-In
Wiring and boxes installed, before walls closed
- 2
Final
All devices installed and energized, verified by City inspection prior to certificate of occupancy
Applies to: EV Charger / Electric Vehicle Charging Station Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement verified before cover
- 2
Final — Electrical
New circuit, breaker sizing, and disconnect verified before the charger is energized
Applies to: Fire Sprinkler & Fire Alarm System Permit (Wyoming State Fire Marshal's Office)
- 1
Rough-In Inspection
Fire sprinkler/alarm system rough installation (piping, wiring, devices) verified before concealment, per the WSFM-approved plans
- 2
Final Acceptance Test
System functional/acceptance test (hydrostatic test for sprinkler systems; device-by-device test for alarm systems) witnessed prior to final sign-off
Applies to: Mechanical / HVAC Permit
- 1
Rough-In / Equipment
Equipment and ductwork installed before walls closed
- 2
Final
Equipment operational, venting and combustion air verified
Applies to: Plumbing Permit
- 1
Underground / Rough-In
Before concealment — pipe slope, materials, connections verified
- 2
Final
All fixtures connected, no leaks, proper venting verified
Final inspection only: Change of Use / Change of Occupancy Permit, Roofing Permit (Reroof)
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Green River building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Green River building permits