Demolition Permit — Green River, Wyoming · Requirements sheet
Verified 2026-07-01 · Source: https://www.grwyo.org/DocumentCenter/View/4182/Demolition-Permit-Application-41719---Fillable-Form
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Demolition Permit in Green River, Wyoming
Required for demolition of structures in Green River. Requires sign-off from electrical utility, gas utility, and water/wastewater/sewer confirming service disconnection before demolition, plus a City Building Department utility-shutoff inspection.
Verified 2026-07-01 · Source
When you need this permit
- No demolition work shall begin without issuance of the permit
- Site plan showing existing structures to remain and structures to be demolished, with location/size of each
- Photos of each side of the structure(s) to be demolished, with the front photo showing the full front elevation visible from the street
- Contact the State of Wyoming Air Quality Division at (307) 777-7391 prior to demolition for asbestos demolition/renovation requirements
- Required sign-offs from Electrical Utility, Gas Utility, and Water & Wastewater/Sewer confirming proper service termination
- Pre-demolition inspection by the City of Green River Building Department verifying all utilities are properly shut off (schedule via 307-872-6140)
- Demolition of structures must be completed within 45 days from the start of demolition
- Site must be backfilled, leveled, and cleared of all building debris within 60 days after demolition
- Applicant is responsible for site safety and security
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Pre-Demolition Utility Shutoff Verification
City of Green River Building Department verifies gas, electric, and water/sewer are properly shut off before demolition begins
- 2
Final
Site cleared, backfilled, leveled, and debris removed within 60 days after demolition
See the full Green River inspection guide — scheduling & re-inspection fees →
Tips
- Contact the State of Wyoming Air Quality Division at (307) 777-7391 before demolition — asbestos requirements apply regardless of building age.
- Demolition must be completed within 45 days of starting, and the site cleared/backfilled within 60 days after — plan your contractor schedule accordingly.
- All three utility sign-offs (electrical, gas, water/wastewater) are required on the application itself before the City will schedule its own shutoff-verification inspection.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Green River building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Green River
Demolition Permit in other cities
Compare demolition permit fees across Wyoming →
Look up this fee in a different city →
Now live
Build your Green River project checklist
Describe your project once and get every permit, document, and fee it triggers in Green River — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →