Skip to main content
PermitBase

Accessory Dwelling Unit (ADU) Permit in Green River, Wyoming

Green River's zoning ordinance (Code of Ordinances Appendix B, Chapter 9 — Use Regulations) has NO dedicated Accessory Dwelling Unit (ADU) permit type or zoning category. The zoning code's own definition of 'Accessory Buildings, Structures and Uses' (Section 9.6) explicitly excludes residential occupancy: an accessory use 'Does not include residential occupancy.' A second dwelling unit on a lot must instead be built as a recognized 'Multi-Unit Dwelling' use (permitted only in specific multi-family zoning districts, e.g. R-3/R-4), not as an accessory structure to a single-family home.

Verified 2026-07-01 · Source

When you need this permit

  • No ADU-specific permit or zoning pathway exists in Green River; do not apply expecting an 'ADU' permit type
  • An accessory structure (garage, shed, workshop) may NOT include residential occupancy per Zoning Code Section 9.6.A ('Accessory Buildings, Structures and Uses') and the Shed & Accessory Structure Brochure
  • A genuine second dwelling unit on a property requires the lot to be zoned for Multi-Unit Dwelling use (the zoning Table of Uses permits 'Multi-Unit Dwelling' only in specific districts, e.g. R-3/R-4, not R-1/R-2 single-family districts) — this is processed as a standard residential building permit for a duplex/multi-family structure, not an ADU permit
  • Confirm zoning district and permitted use eligibility with Development Services/Planning before attempting any second-unit project

Required documents

Check off what you have — your progress is saved on this device.

Fee schedule

Filing fee
Not published — contact the department

Review timeline

Plan reviewTypical estimate — confirm current times with the Green River building department
~1–14 business days

How long did your Accessory Dwelling Unit (ADU) Permit permit actually take in Green River?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Green River inspection guide — scheduling & re-inspection fees →

    Tips

    • If you are exploring a second dwelling unit in Green River, the correct question is whether your lot is zoned R-3 or R-4 (Multi-Unit Dwelling permitted), not whether an 'ADU' pathway exists — it does not.
    • The zoning Table of Uses (Section 9.2) lists 'Single Unit Dwelling' and 'Multi-Unit Dwelling' as the only residential use categories; there is no 'Accessory Dwelling Unit' row.
    • This is a verified finding (not a partial): the zoning code was read directly and confirmed to define accessory uses as excluding residential occupancy, and to lack any ADU use category in its Table of Uses.

    Frequently asked questions

    Green River requires an accessory dwelling unit (adu) permit for: No ADU-specific permit or zoning pathway exists in Green River; do not apply expecting an 'ADU' permit type; An accessory structure (garage, shed, workshop) may NOT include residential occupancy per Zoning Code Section 9.6.A ('Accessory Buildings, Structures and Uses') and the Shed & Accessory Structure Brochure; A genuine second dwelling unit on a property requires the lot to be zoned for Multi-Unit Dwelling use (the zoning Table of Uses permits 'Multi-Unit Dwelling' only in specific districts, e.g. R-3/R-4, not R-1/R-2 single-family districts) — this is processed as a standard residential building permit for a duplex/multi-family structure, not an ADU permit; Confirm zoning district and permitted use eligibility with Development Services/Planning before attempting any second-unit project. If your project isn't listed, confirm with City of Green River Development Services — Building Inspection Division at (307) 872-6140 before starting work.

    Plan review for an accessory dwelling unit (adu) permit in Green River typically runs 1–14 business days. This is an estimate, not a published figure — confirm current review times with City of Green River Development Services — Building Inspection Division at (307) 872-6140.

    Depending on your project, Green River may also ask for: Shed & Accessory Structure Brochure (DocumentCenter Doc #4092). See the required-documents checklist on this page for details on each.

    Apply through City of Green River Development Services — Building Inspection Division at 50 E 2nd North Street, Green River, WY 82935. Phone: (307) 872-6140, email: Contact via Development Services (see department website). Office hours: Monday through Friday, 8:00 a.m. to 5:00 p.m.. Official information: https://www.grwyo.org/87/Building-Inspection.

    Green River, Wyoming has adopted: 2024 International Building Code (IBC), including Appendices B, I, J — adopted by City of Green River Code of Ordinances Sec. 7-16 (Ord. No. 16-02, 8-1-16; amended through Ord. No. 25-01, 1-21-25); Chapter 27 (Electrical) of the IBC is deleted by local amendment since electrical is separately governed by the local NEC adoption (Sec. 7-76); 2024 International Residential Code (IRC), including Appendices AA, BA, BE, BF, CA, CB, CD — Sec. 7-17 (Ord. No. 25-01, 1-21-25); local design criteria: Ground Snow Load 30 psf, Wind Speed 115 mph, Seismic Design Category C, Weathering Severe, Frost Line Depth 42 inches, Termite None to Slight, Winter Design Temp -20°F, Ice Shield Underlayment Required, Air Freezing Index 2282, Elevation 6,132 ft; 2024 International Plumbing Code (IPC), including all appendices — Sec. 7-31 (Ord. No. 25-01, 1-21-25), with local amendment to Section 305.4 (Freezing) restricting exterior/attic/crawlspace pipe placement; 2024 International Mechanical Code (IMC), including all appendices — Sec. 7-46 (Ord. No. 25-01, 1-21-25); 2024 International Fuel Gas Code (IFGC) — Sec. 7-91 (Ord. No. 25-01, 1-21-25); National Electrical Code (NEC), latest edition as adopted by the Wyoming State Fire Marshal's Office (2023 NEC was in effect through June 30, 2026; per wsfm.wyo.gov/electrical-safety, the 2026 NEC took effect statewide July 1, 2026) — adopted by reference for Green River under Sec. 7-76 (Ord. No. 16-02, 8-1-16; amended through Ord. No. 25-01, 1-21-25); enforced locally by the City under Home Rule, not by the state electrical program. Local amendments apply — see the Green River overview page for the full list.

    Green River's zoning code has no dedicated ADU permit or use category. Its definition of an accessory structure/use explicitly excludes residential occupancy. A genuine second dwelling unit requires the property to be zoned for Multi-Unit Dwelling use (e.g., R-3 or R-4), processed as a standard residential building permit for that use — not as an accessory structure to an existing single-family home.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-01.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Green River building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.