Solar PV Permit in Green River, Wyoming

Rooftop or ground-mounted solar photovoltaic installations in Green River require a building permit (structural) and an electrical permit, since solar PV falls under both the adopted 2024 IRC/IBC (structural/racking) and the locally-enforced NEC (electrical interconnection, Article 690).

Verified 2026-07-01 · Source

When you need this permit

  • Solar PV installation is not called out as a distinct permit type on the city's Work Requiring a Building Permit list or Building Permit Application form; it is processed as an Alteration/Addition building permit plus an Electrical Permit, per the general Sec. 105.1 requirement that any work regulated by the adopted codes (including electrical) requires a permit
  • Structural plans showing roof-mount racking attachment and load path required for the building permit component
  • Electrical single-line diagram, load calculations, and disconnect location required for the electrical permit component, per Sec. 7-76 (NEC adoption) and the Wyoming-licensed electrical contractor requirement
  • Confirm with Development Services (307) 872-6140 whether your project needs the State Fire Marshal's office review in addition to City review

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Solar PV — Building Permit component (valuation-based)City of Green River Development Services Fees schedule (effective July 1, 2018) does not list a distinct 'solar' line item; solar PV racking/structural work is charged as ordinary valuation-based construction under the same table used for building permits generally.
Charged under the general valuation-based Building Permit fee schedule (residential 50%, commercial/multi-family 100%)
Solar PV — Electrical Permit componentConsistent with how Green River charges all electrical work — see the electrical-permit entry.
Charged under the same general valuation-based fee table (no distinct flat electrical line item published)

Review timeline

Plan reviewTypical estimate — confirm current times with the Green River building department
~1–14 business days

How long did your Solar PV Permit permit actually take in Green River?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before cover

  2. 2

    Final — Structural/Racking

    Panel mounting and roof penetration sealing verified

  3. 3

    Final — Electrical

    Interconnection point and system energization verified by City inspection

See the full Green River inspection guide — scheduling & re-inspection fees →

Tips

  • Green River does not publish a solar-specific permit type or fee — budget using the general valuation-based building and electrical fee tables and confirm exact project cost classification with Development Services before applying.
  • Structural calculations for roof-mounted solar should reference the city's amended IRC Table R301.2(1) snow load (30 psf) and wind speed (115 mph) design criteria.

Frequently asked questions

Green River requires a solar pv permit for: Solar PV installation is not called out as a distinct permit type on the city's Work Requiring a Building Permit list or Building Permit Application form; it is processed as an Alteration/Addition building permit plus an Electrical Permit, per the general Sec. 105.1 requirement that any work regulated by the adopted codes (including electrical) requires a permit; Structural plans showing roof-mount racking attachment and load path required for the building permit component; Electrical single-line diagram, load calculations, and disconnect location required for the electrical permit component, per Sec. 7-76 (NEC adoption) and the Wyoming-licensed electrical contractor requirement; Confirm with Development Services (307) 872-6140 whether your project needs the State Fire Marshal's office review in addition to City review. If your project isn't listed, confirm with City of Green River Development Services — Building Inspection Division at (307) 872-6140 before starting work.

In Green River, the published Solar PV — Building Permit component (valuation-based) is: Charged under the general valuation-based Building Permit fee schedule (residential 50%, commercial/multi-family 100%). Additional published fees: Solar PV — Electrical Permit component — Charged under the same general valuation-based fee table (no distinct flat electrical line item published). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a solar pv permit in Green River typically runs 1–14 business days. This is an estimate, not a published figure — confirm current review times with City of Green River Development Services — Building Inspection Division at (307) 872-6140.

You'll need: Building Permit Application (DocumentCenter Doc #5572). See the required-documents checklist on this page for details on each.

Green River requires 3 inspection(s) for a solar pv permit, in order: Rough Electrical, Final — Structural/Racking, Final — Electrical. Schedule each through City of Green River Development Services — Building Inspection Division ((307) 872-6140).

Apply through City of Green River Development Services — Building Inspection Division at 50 E 2nd North Street, Green River, WY 82935. Phone: (307) 872-6140, email: Contact via Development Services (see department website). Office hours: Monday through Friday, 8:00 a.m. to 5:00 p.m.. Official information: https://www.grwyo.org/87/Building-Inspection.

Green River, Wyoming has adopted: 2024 International Building Code (IBC), including Appendices B, I, J — adopted by City of Green River Code of Ordinances Sec. 7-16 (Ord. No. 16-02, 8-1-16; amended through Ord. No. 25-01, 1-21-25); Chapter 27 (Electrical) of the IBC is deleted by local amendment since electrical is separately governed by the local NEC adoption (Sec. 7-76); 2024 International Residential Code (IRC), including Appendices AA, BA, BE, BF, CA, CB, CD — Sec. 7-17 (Ord. No. 25-01, 1-21-25); local design criteria: Ground Snow Load 30 psf, Wind Speed 115 mph, Seismic Design Category C, Weathering Severe, Frost Line Depth 42 inches, Termite None to Slight, Winter Design Temp -20°F, Ice Shield Underlayment Required, Air Freezing Index 2282, Elevation 6,132 ft; 2024 International Plumbing Code (IPC), including all appendices — Sec. 7-31 (Ord. No. 25-01, 1-21-25), with local amendment to Section 305.4 (Freezing) restricting exterior/attic/crawlspace pipe placement; 2024 International Mechanical Code (IMC), including all appendices — Sec. 7-46 (Ord. No. 25-01, 1-21-25); 2024 International Fuel Gas Code (IFGC) — Sec. 7-91 (Ord. No. 25-01, 1-21-25); National Electrical Code (NEC), latest edition as adopted by the Wyoming State Fire Marshal's Office (2023 NEC was in effect through June 30, 2026; per wsfm.wyo.gov/electrical-safety, the 2026 NEC took effect statewide July 1, 2026) — adopted by reference for Green River under Sec. 7-76 (Ord. No. 16-02, 8-1-16; amended through Ord. No. 25-01, 1-21-25); enforced locally by the City under Home Rule, not by the state electrical program. Local amendments apply — see the Green River overview page for the full list.

No. Green River does not list a distinct Solar PV permit type. A solar installation is processed as a building permit (structural/racking) plus an electrical permit (interconnection), both charged under the city's general valuation-based fee schedule. Confirm project-specific requirements with Development Services at (307) 872-6140.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Green River building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.