PermitBaseMountain West

Solar PV Permit in Jackson, Wyoming

Verified

Solar photovoltaic and battery Energy Storage System (ESS) installations in Jackson require BOTH a building permit and an electrical permit. There is no separate flat-fee 'solar permit' type — solar work is charged under the general Building Permit (valuation-based) and Electrical Permit (valuation-based) fee schedules, with mandatory electrical plan review.

Verified 2026-07-01 · Source

Charged under the general Building Permit valuation/per-square-foot schedule (see residential-building-permit fees)Building Permit portion — valuation-based

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building Permit portion — valuation-basedCharged under the general Building Permit valuation/per-square-foot schedule (see residential-building-permit fees)Resolution 25-18 Appendix A; no dedicated solar building-permit line exists — verified general valuation table applies
Electrical Permit portion — Valuation of Electrical WorkTiered from $37.00 (up to $500 valuation) through the formula-based bands to $1,554 + $6/additional $1,000 over $100,000JMC 15.20.010; Resolution 25-18 Appendix A — same tiered table as the general Electrical Permit
Electrical Plan Review65% of the electrical permit feeResolution 25-18 Appendix A
Specialty Solar Panel Installer contractor license$451.00 initial; $35.00 renewal late feeJMC 15.36.034; Resolution 25-18 Appendix A Contractor Licensing section

Review timeline

~1045 business days

Typical estimate — confirm current times with the Jackson building department

Inspection process

  1. 1

    Rough Electrical

  2. 2

    Final — Structural/Racking (building permit)

  3. 3

    Final — Electrical

Tips

Frequently asked questions

Is there a dedicated solar permit fee in Jackson?
No. Solar PV and battery storage installations require both a building permit and an electrical permit, each charged under their respective general valuation-based fee schedules (Resolution 25-18 Appendix A) — there is no separate flat solar permit fee. Electrical plan review is always required for solar/ESS work.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Jackson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Jackson

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.