Solar PV Permit in Lander, Wyoming
Required for installation of rooftop or ground-mounted solar photovoltaic systems in Lander. The electrical/structural work is processed through the City's standard Application for Building Permit (Trade/Small Project Alteration Permit for a retrofit, or the valuation-based Building Permit if bundled into new construction); separately, Wyoming's Solar Rights Act (Wyo. Stat. §§ 34-22-101 et seq.) requires the City to administer a distinct Solar Rights Permit, priced at $275 under Resolution 1359, that establishes a property owner's priority right to an unobstructed line-of-sight path from a solar collector to the sun.
Verified 2026-07-20 · Source
When you need this permit
- Electrical/structural installation work requires a City of Lander Application for Building Permit — for a standalone retrofit, filed under the Trade/Small Project Alteration Permit category (Electrical Alteration or Electrical Service Inspection, depending on scope); if bundled into new construction, priced per Attachment A's valuation table
- A separate Solar Rights Permit ($275, Resolution 1359, 'PLANNING & ZONING' / Board of Adjustment section) is required to establish statutory priority for an unobstructed line-of-sight path from the solar collector to the sun, per Wyoming's Solar Rights Act (Wyo. Stat. §§ 34-22-101 et seq.); priority vests as of the date the permit is applied for
- Wyoming's Solar Rights Act requires local governments to administer this permit system; it protects the applicant's solar access against later-constructed obstructions on neighboring property but does not itself authorize construction of the PV system
- Design/installation work must comply with the City's locally-adopted 2024 IBC/IRC and the 2023 NEC (LMC Title 3, Ord. 2025-16)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before cover, consistent with the City's mandatory plumbing/mechanical/electrical inspection.
- 2
Final Inspection
Racking, roof penetrations, and electrical connections verified; panel labeled and system energized.
See the full Lander inspection guide — scheduling & re-inspection fees →
Tips
- Don't confuse the $275 Solar Rights Permit (a Wyoming statutory solar-access-priority filing through the Board of Adjustment) with the actual electrical/building permit needed to install the PV system — both are required, but they are separate applications with separate fees.
- A simple retrofit PV installation with no new electrical service is billed at the flat $30 Electrical Alteration fee; a $75 Electrical Service Inspection fee applies instead if the project includes new or upgraded service equipment.
- Because Attachment A (the valuation table for new-construction-bundled PV) is not published online, call the Building Inspector (307-330-3114) for an exact cost if your solar installation is part of a larger new-construction project.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lander building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lander
Solar PV Permit in other cities
Compare solar pv permit fees across Wyoming →
Look up this fee in a different city →
Now live
Build your Lander project checklist
Describe your project once and get every permit, document, and fee it triggers in Lander — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →