Lander building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Lander, Wyoming.
Verified 2026-07-18 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 240 Lincoln Street, Lander, WY 82520
- Phone
- 307-330-3114 or 307-332-2870 x115 (Building Inspector Dustin Springston); 307-332-2870 (City Hall main line)
- Office hours
- Not separately published for the Building Department on the City of Lander website as of 2026-07-18 (checked the Building Inspector contact page and the citywide Contact Us page — neither lists specific hours); call 307-332-2870 or 307-330-3114 to confirm.
- Website
- Official site
Inspection sequence
Applies to: Building Permit (New Construction, Addition, Alteration, Demolition)
- 1
Foundation
Per the City's Residential/Commercial Plan Submittal Checklist, mandatory inspections include foundation, concrete or under-floor, structural framing, lath and/or gypsum board, plumbing, mechanical and electrical, and final.
- 2
Concrete or Under-Floor
Concrete or under-floor inspection, per the City's mandatory-inspection list.
- 3
Structural Framing
Structural framing inspection, per the City's mandatory-inspection list.
- 4
Lath and/or Gypsum Board
Lath/gypsum board (drywall cover) inspection, per the City's mandatory-inspection list.
- 5
Plumbing, Mechanical and Electrical
Combined trade inspections, per the City's mandatory-inspection list.
- 6
Final Inspection
Final inspection; a Certificate of Occupancy is issued at no additional cost after successfully completing the final inspection.
Applies to: EV Charger / EVSE Permit
- 1
Rough Electrical
Wiring, box placement, and grounding verified before walls are closed, where applicable, consistent with the City's mandatory-inspection list
- 2
Final Inspection
EVSE circuit, breaker/disconnect, and NEC Article 625 compliance verified; system energized
Applies to: Manufactured Home Placement Permit (HUD Standard)
- 1
Foundation/Set
Foundation and home-set inspection, consistent with the City's general mandatory-inspection list; a specific manufactured-home inspection checklist was not found separately published online as of 2026-07-18.
- 2
Final Inspection
Final inspection prior to occupancy.
Applies to: Solar PV Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before cover, consistent with the City's mandatory plumbing/mechanical/electrical inspection.
- 2
Final Inspection
Racking, roof penetrations, and electrical connections verified; panel labeled and system energized.
Applies to: Trade / Small Project Alteration Permit (Electrical, Plumbing, Mechanical, Re-roof, Siding)
- 1
Rough Trade Inspection
Rough electrical, plumbing, or mechanical inspection prior to cover, consistent with the City's mandatory-inspection list (plumbing, mechanical and electrical) on the Residential/Commercial Plan Submittal Checklist; a Sample Inspection Form is available from the Building Department's Inspections page.
- 2
Final Inspection
Final inspection of the completed trade work or re-roof.
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-18.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lander building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Lander building permits
Get alerts for Lander
We'll email you when Lander's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.