Lander building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Lander, Wyoming.

Verified 2026-07-18 · Source

How to schedule

Inspections are requested through the building department below.

Address
240 Lincoln Street, Lander, WY 82520
Phone
307-330-3114 or 307-332-2870 x115 (Building Inspector Dustin Springston); 307-332-2870 (City Hall main line)
Office hours
Not separately published for the Building Department on the City of Lander website as of 2026-07-18 (checked the Building Inspector contact page and the citywide Contact Us page — neither lists specific hours); call 307-332-2870 or 307-330-3114 to confirm.

Inspection sequence

Applies to: Building Permit (New Construction, Addition, Alteration, Demolition)

  1. 1

    Foundation

    Per the City's Residential/Commercial Plan Submittal Checklist, mandatory inspections include foundation, concrete or under-floor, structural framing, lath and/or gypsum board, plumbing, mechanical and electrical, and final.

  2. 2

    Concrete or Under-Floor

    Concrete or under-floor inspection, per the City's mandatory-inspection list.

  3. 3

    Structural Framing

    Structural framing inspection, per the City's mandatory-inspection list.

  4. 4

    Lath and/or Gypsum Board

    Lath/gypsum board (drywall cover) inspection, per the City's mandatory-inspection list.

  5. 5

    Plumbing, Mechanical and Electrical

    Combined trade inspections, per the City's mandatory-inspection list.

  6. 6

    Final Inspection

    Final inspection; a Certificate of Occupancy is issued at no additional cost after successfully completing the final inspection.

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough Electrical

    Wiring, box placement, and grounding verified before walls are closed, where applicable, consistent with the City's mandatory-inspection list

  2. 2

    Final Inspection

    EVSE circuit, breaker/disconnect, and NEC Article 625 compliance verified; system energized

Applies to: Manufactured Home Placement Permit (HUD Standard)

  1. 1

    Foundation/Set

    Foundation and home-set inspection, consistent with the City's general mandatory-inspection list; a specific manufactured-home inspection checklist was not found separately published online as of 2026-07-18.

  2. 2

    Final Inspection

    Final inspection prior to occupancy.

Applies to: Solar PV Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before cover, consistent with the City's mandatory plumbing/mechanical/electrical inspection.

  2. 2

    Final Inspection

    Racking, roof penetrations, and electrical connections verified; panel labeled and system energized.

Applies to: Trade / Small Project Alteration Permit (Electrical, Plumbing, Mechanical, Re-roof, Siding)

  1. 1

    Rough Trade Inspection

    Rough electrical, plumbing, or mechanical inspection prior to cover, consistent with the City's mandatory-inspection list (plumbing, mechanical and electrical) on the Residential/Commercial Plan Submittal Checklist; a Sample Inspection Form is available from the Building Department's Inspections page.

  2. 2

    Final Inspection

    Final inspection of the completed trade work or re-roof.

Re-inspection fees

Fire Sprinkler / Fire Alarm System PermitOther inspections/fees (after-hours inspection, reinspection, additional plan review from revisions) · Dept. Rules Chapter 2, Section 3.
$49.31 per hour, one-half hour minimum (or the jurisdiction's actual total hourly cost, whichever is greater)

Lander building permits

Get alerts for Lander

We'll email you when Lander's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.