Fire Sprinkler / Fire Alarm System Permit in Lander, Wyoming
Installation, addition, or alteration of a fire alarm, fire sprinkler, or fire suppression system in Lander is not a City of Lander permit product at all — it is processed directly through the Wyoming Department of Fire Prevention and Electrical Safety (State Fire Marshal), which requires a Plan Review and a 'Permit to Construct' for this work 'regardless of size or valuation,' per the Department's own published Plan Review Information page. Resolution 1359 (the City's Fee Schedule 2025-26) has no fire-alarm/sprinkler/suppression line item, and the City's own Application for Building Permit has no checkbox covering this scope, which is consistent with the work being state-administered rather than City-billed.
Verified 2026-07-22 · Source
When you need this permit
- Installation, addition, or alteration of any fire alarm, fire sprinkler, or fire suppression system requires a Wyoming Department of Fire Prevention & Electrical Safety Plan Review and Permit to Construct, regardless of size or valuation, per the Department's Plan Review Information page and W.S. 35-9-108(s)
- Plans for fire alarm systems and fire sprinkler systems must be submitted as successive-phase plans after any initial (e.g., new-construction shell) plans for the same project are approved, per W.S. 35-9-108(s)
- Plans for fire protection systems and for fire detection/alarm systems designed by a NICET III-or-greater professional must be prepared under the direct supervision of a design professional registered to practice engineering in Wyoming; evidence of manufacturer verification is required if the system is manufactured/pre-engineered, per Dept. of Fire Prevention & Electrical Safety Rules, Chapter 2, Section 1(c)(ii)
- No City of Lander Application for Building Permit checkbox exists for a standalone fire alarm/sprinkler/suppression permit — Construction Type, Accessory Structure, Sign, Plumbing, Electrical, Mechanical, and Public R.O.W. are the only categories on the City's own form, confirming this is not a City-fee'd product
- For NEW commercial construction where a fire protection system is part of the building shell, 'details of required fire protection systems' and fire-resistive construction data are instead submitted as part of the standard City of Lander commercial building-permit packet (see this file's residential-commercial-building-permit entry); a standalone State Fire Marshal Plan Review applies to adding or altering a fire protection system independent of, or subsequent to, that base construction project
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Fire and Life Safety Inspection
Verifies the installation conforms to the approved plans. Approved plans are stamped 'REVIEWED AND APPROVED FOR FIRE AND LIFE SAFETY ONLY' or 'APPROVED AS NOTED,' which is not authorization to violate any other applicable code, per Dept. Rules Chapter 2, Section 2(i)-(k).
See the full Lander inspection guide — scheduling & re-inspection fees →
Tips
- Plans are accepted or rejected for review within 5 business days of receipt; a complete review is then finished within 21 business days of acceptance, so total elapsed time from submission to a completed review runs roughly 21-26 business days. If the Department requests additional information, review resumes within 10 business days of receiving it, or the original 21-day window, whichever is longer, per the WSFM's published Plan Review process and W.S. 35-9-108(b)-(c).
- Lander's own local IFC amendment (LMC 3.14.20, amending IFC Section 1103.5.3) sets January 1, 2027 as the compliance deadline by which certain existing buildings must have automatic sprinkler systems installed — a sprinkler system installed to meet that City retrofit deadline still goes through this same State Fire Marshal Plan Review / Permit to Construct process, since the City has no separate fire-sprinkler permit product of its own.
- No work may begin before the Permit to Construct is issued, and fees are due before plans are logged as accepted; pay by credit card in the applicant's portal account or by check mailed to the Department's Cheyenne office (320 W. 25th St., 3rd Floor, Cheyenne, WY 82002).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lander building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lander
Fire Sprinkler / Fire Alarm System Permit in other cities
Compare fire sprinkler / fire alarm system permit fees across Wyoming →
Look up this fee in a different city →