Trade / Small Project Alteration Permit (Electrical, Plumbing, Mechanical, Re-roof, Siding) — Lander, Wyoming · Requirements sheet
Verified 2026-07-18 · Source: https://www.landerwy.gov/sites/g/files/vyhlif13931/files/media/city-clerk/file/3276/1359%20Fee%20Schedule2025%202026.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Trade / Small Project Alteration Permit (Electrical, Plumbing, Mechanical, Re-roof, Siding) in Lander, Wyoming
Covers smaller trade and alteration work that does not rise to the level of new construction or a full remodel — electrical service inspections/alterations, mechanical equipment replacement, plumbing alterations, water heater replacement, gas piping pressure tests, water/sewer line replacement, siding, and re-roofing. Priced under Resolution 1359's 'Small project Equipment/Material, including labor' category, which sets a general rate of 1% of contract amount with specific flat-fee alternates listed by trade.
Verified 2026-07-18 · Source
When you need this permit
- Completed City of Lander Application for Building Permit, checking the applicable PLUMBING, ELECTRICAL, MECHANICAL, or ROOF/RE-ROOF boxes
- For plumbing work: indicate whether required backflow-prevention check valve and expansion tank are in place, and water tap size (tap sizes 2 inches and greater require Wyoming DEQ review), per the application form and IPC Section 714
- For electrical work: indicate wiring modifications, service upgrade, panel modification, meter modification/relocation, and electrical service size (amps)
- For mechanical work: indicate new system, alteration, or component replacement
- For re-roofing: indicate residence or garage, and metal or shingles
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Trade Inspection
Rough electrical, plumbing, or mechanical inspection prior to cover, consistent with the City's mandatory-inspection list (plumbing, mechanical and electrical) on the Residential/Commercial Plan Submittal Checklist; a Sample Inspection Form is available from the Building Department's Inspections page.
- 2
Final Inspection
Final inspection of the completed trade work or re-roof.
See the full Lander inspection guide — scheduling & re-inspection fees →
Tips
- Gas piping pressure tests are billed per test ($30 each) rather than as a single flat fee, per Resolution 1359 — budget for multiple tests if the scope requires more than one.
- Water tap sizes of 2 inches or greater trigger a mandatory Wyoming Department of Environmental Quality (DEQ) review, per the Application for Building Permit form.
- The application form cites IPC Section 714 for backflow-prevention requirements on existing sewer services.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-18.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lander building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lander
Look up this fee in a different city →
Now live
Build your Lander project checklist
Describe your project once and get every permit, document, and fee it triggers in Lander — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →