Sign Installation Permit in Lander, Wyoming

Required for new sign installation or alteration within the City of Lander. Charged per square foot of sign face, with a stated minimum, under Resolution 1359.

Verified 2026-07-18 · Source

When you need this permit

  • New sign installation or alteration requires a permit, per the City's Application for Building Permit ('SIGN — New OR Alteration' checkbox)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign installationCity of Lander Resolution 1359, Fee Schedule 2025-26, 'BUILDING DEPARTMENT' section.
$0.53 per square foot of sign face, or $39 minimum

Review timeline

Plan review
Not published — contact the department

How long did your Sign Installation Permit permit actually take in Lander?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection

    Final inspection of the installed sign.

See the full Lander inspection guide — scheduling & re-inspection fees →

Tips

  • The $0.53-per-square-foot rate is measured against sign face area, with a $39 minimum charge regardless of size, per Resolution 1359.

Frequently asked questions

Lander requires a sign installation permit for: New sign installation or alteration requires a permit, per the City's Application for Building Permit ('SIGN — New OR Alteration' checkbox). If your project isn't listed, confirm with City of Lander Building Department at 307-330-3114 or 307-332-2870 x115 (Building Inspector Dustin Springston); 307-332-2870 (City Hall main line) before starting work.

$0.53 per square foot of sign face, or a $39 minimum, whichever is greater, per City of Lander Resolution 1359 (Fee Schedule 2025-26).

Lander does not publish a plan-review timeline for this permit. Contact City of Lander Building Department at 307-330-3114 or 307-332-2870 x115 (Building Inspector Dustin Springston); 307-332-2870 (City Hall main line) for current turnaround.

You'll need: City of Lander Application for Building Permit. See the required-documents checklist on this page for details on each.

Lander requires 1 inspection(s) for a sign installation permit, in order: Final Inspection. Schedule each through City of Lander Building Department (307-330-3114 or 307-332-2870 x115 (Building Inspector Dustin Springston); 307-332-2870 (City Hall main line)).

Apply through City of Lander Building Department at 240 Lincoln Street, Lander, WY 82520. Phone: 307-330-3114 or 307-332-2870 x115 (Building Inspector Dustin Springston); 307-332-2870 (City Hall main line), email: dspringston@landerwyoming.org (Building Inspector Dustin Springston). Office hours: Not separately published for the Building Department on the City of Lander website as of 2026-07-18 (checked the Building Inspector contact page and the citywide Contact Us page — neither lists specific hours); call 307-332-2870 or 307-330-3114 to confirm.. Official information: https://www.landerwy.gov/building/page/building-permits.

Lander, Wyoming has adopted: 2024 International Building Code (IBC), including Appendices A, B, G, H, I, J, K and N — adopted as Lander Municipal Code (LMC) Chapter 3.08.10 by Ordinance 2025-16, effective 12/13/2025.; 2024 International Existing Building Code (IEBC) — LMC Chapter 3.09.10, Ordinance 2025-16 (12/13/2025).; 2024 International Residential Code (IRC), including Appendices AA, BA, BB, BC, BE, BJ, BO, CA, and CD — LMC Chapter 3.10.10, Ordinance 2025-16 (12/13/2025).; 2024 International Plumbing Code (IPC), including Appendices B, C, D, and E — LMC Chapter 3.12.10, Ordinance 2025-16 (12/13/2025).; 2024 International Fire Code (IFC) — LMC Chapter 3.14.10, Ordinance 2025-16 (12/13/2025).; 2024 International Mechanical Code (IMC), including Appendix A — LMC Chapter 3.16.10, Ordinance 2025-16 (12/13/2025).; National Electrical Code (NEC), 2023 Edition, as published by the National Fire Protection Association — LMC Chapter 3.20.10, Ordinance 2025-16 (12/13/2025); this is the only Title 3 code NOT on the 2024 ICC cycle.; 2024 International Fuel Gas Code (IFGC), including Appendices A, B, and C — LMC Chapter 3.22.10, Ordinance 2025-16 (12/13/2025).; 2024 International Property Maintenance Code (IPMC) — LMC Chapter 3.24.10, Ordinance 2025-16 (12/13/2025).; Flood Damage Prevention regulations — LMC Chapter 3.32, Ordinance 2025-16 (12/13/2025).; Notably, LMC 3.08.20(B) REPEALS/does not enforce Section 101.4.6 of the IBC ('Energy'), meaning the City of Lander does not separately enforce the International Energy Conservation Code (IECC) as part of its Title 3 building-code adoption — confirmed by reading the full Title 3 code text live on lander.municipalcodeonline.com as of 2026-07-18; no IECC chapter appears anywhere in Title 3's table of contents (3.04 through 3.32).. Local amendments apply — see the Lander overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-18.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lander building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.