Sign Permit in Cheyenne, Wyoming

Required for new permanent signs and remodels/alterations of existing signs (wall, projecting, ground, low-profile, freestanding, billboard, and pedestrian-category signs) in Cheyenne, per Unified Development Code (UDC) Section 6.5. A sign permit is issued by the Building Safety Division at the same time as the building permit -- no sign may be erected without a building permit -- and certain low-impact sign types are exempt from the permit requirement entirely.

Verified 2026-07-22 · Source

When you need this permit

  • A sign plan/permit is required for all new signs and for alterations of existing signs that replace more than 50% of the sign's surface area (UDC 6.5.2, 6.5.5.a); a sign plan is also required with the site plan review application for all new uses/buildings (except detached dwellings, duplexes, townhouses) and for any change of use involving alteration of an existing sign
  • Plans are submitted to the Development Office/Planning and Development Department with the site plan review application, then submitted to the Director with any building plans; the Director determines issuance of the sign permit(s) at the same time as the building permit (UDC 6.5.5.a.1-2)
  • No sign shall be erected without a building permit (UDC 6.5.5.a.3)
  • Freestanding, billboard, and ground sign applications require digital structural/foundation plans stamped by a Wyoming registered design professional, and a final certification of sign placement/dimensions/setbacks stamped by a Wyoming engineer or land surveyor, submitted prior to final inspection (UDC 6.5.6.d; City Sign Permit Check List)
  • Certain sign types are EXEMPT from the permit requirement if they meet the specific thresholds in UDC 6.5.5.b -- e.g., nonilluminated temporary signs within the allowances of UDC 6.5.4, nonilluminated incidental/directional signs in residential districts not exceeding 3 sq ft, nameplates/building markers not exceeding 1 sq ft per 10 linear ft of building frontage (max 10 sq ft), window signs, government/public-safety signs, and signs in place as of 6-14-93 that were properly permitted or required no permit at the time
  • Signs exceeding any of the UDC 6.5.5.b exemption thresholds require a full sign permit subject to all applicable district regulations

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 5 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Planning Fees -- Sign Permit Review FeeCity of Cheyenne Schedule of Fees, Planning Fees section (Resolution 6213); verified directly against the live Schedule of Fees PDF 2026-07-22
$50.00
Building and Construction Permit Fee -- valuation-based (sign construction scope)No separate flat-rate sign construction fee line exists in the adopted Schedule of Fees (Ordinance 4254); sign construction is charged under the same general valuation-based table used for other permit types without a dedicated fee line (e.g. reroof, demolition, deck)
Varies by project valuation -- see Building and Construction Permit Fee table under residential-building-permit
Plan Review FeeCity of Cheyenne Schedule of Fees (Ordinance 4254); applied generally to building-permit-scope work in this jurisdiction
65% of the Building Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Cheyenne?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final -- Sign Placement

    Verifies installed sign matches approved plans; for freestanding, billboard, and ground signs, the Wyoming-stamped placement certification (dimensions, setbacks, height) must be submitted to the Development Office and Building Department prior to this inspection (UDC 6.5.6.d)

See the full Cheyenne inspection guide — scheduling & re-inspection fees →

Tips

  • No sign may be erected without a building permit in Cheyenne, even signs that seem 'temporary' -- only the specific exemptions listed in UDC 6.5.5.b (small nonilluminated incidental signs, certain temporary signs within allowances, window signs, nameplates, government signs, etc.) skip the permit requirement.
  • Freestanding, billboard, and ground signs carry an extra step beyond wall/window signs: a final placement certification stamped by a Wyoming engineer or land surveyor must be submitted before final inspection -- budget time for this survey/certification step.
  • The $50.00 Sign Permit Review Fee (Planning Fees, Resolution 6213) is separate from the valuation-based Building and Construction Permit Fee (Ordinance 4254) charged for the sign's construction cost -- both can apply to the same sign permit.
  • 2026-07-22 grounded-extraction pass: fetched the current UDC Article 6 (Design Regulations, Section 6.5 Signs), the City's live Sign Permit Check List handout, the Building/Planning FAQ page, and the live Schedule of Fees PDF directly; all facts above are drawn from these official City of Cheyenne sources.

Frequently asked questions

Cheyenne requires a sign permit for: A sign plan/permit is required for all new signs and for alterations of existing signs that replace more than 50% of the sign's surface area (UDC 6.5.2, 6.5.5.a); a sign plan is also required with the site plan review application for all new uses/buildings (except detached dwellings, duplexes, townhouses) and for any change of use involving alteration of an existing sign; Plans are submitted to the Development Office/Planning and Development Department with the site plan review application, then submitted to the Director with any building plans; the Director determines issuance of the sign permit(s) at the same time as the building permit (UDC 6.5.5.a.1-2); No sign shall be erected without a building permit (UDC 6.5.5.a.3); Freestanding, billboard, and ground sign applications require digital structural/foundation plans stamped by a Wyoming registered design professional, and a final certification of sign placement/dimensions/setbacks stamped by a Wyoming engineer or land surveyor, submitted prior to final inspection (UDC 6.5.6.d; City Sign Permit Check List); Certain sign types are EXEMPT from the permit requirement if they meet the specific thresholds in UDC 6.5.5.b -- e.g., nonilluminated temporary signs within the allowances of UDC 6.5.4, nonilluminated incidental/directional signs in residential districts not exceeding 3 sq ft, nameplates/building markers not exceeding 1 sq ft per 10 linear ft of building frontage (max 10 sq ft), window signs, government/public-safety signs, and signs in place as of 6-14-93 that were properly permitted or required no permit at the time; Signs exceeding any of the UDC 6.5.5.b exemption thresholds require a full sign permit subject to all applicable district regulations. If your project isn't listed, confirm with City of Cheyenne Compliance Department — Building Safety Division at (307) 637-6265 before starting work.

In Cheyenne, the published Planning Fees -- Sign Permit Review Fee is: $50.00. Additional published fees: Building and Construction Permit Fee -- valuation-based (sign construction scope) — Varies by project valuation -- see Building and Construction Permit Fee table under residential-building-permit; Plan Review Fee — 65% of the Building Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Cheyenne does not publish a plan-review timeline for this permit. Contact City of Cheyenne Compliance Department — Building Safety Division at (307) 637-6265 for current turnaround.

You'll need: Building Permit Application (via OpenGov portal); Plot Plan; Digital Building Plans; Digital Structural/Foundation Plans (Wyoming registered design professional, wet-sealed); Digital Certification of Final Sign Placement (Wyoming engineer or land surveyor, wet-sealed). See the required-documents checklist on this page for details on each.

Cheyenne requires 1 inspection(s) for a sign permit, in order: Final -- Sign Placement. Schedule each through City of Cheyenne Compliance Department — Building Safety Division ((307) 637-6265).

Apply through City of Cheyenne Compliance Department — Building Safety Division at 2101 O'Neil Avenue, Room 202, Cheyenne, WY 82001. Phone: (307) 637-6265, email: Not published on city site — use main phone or OpenGov portal messaging. Office hours: Mon–Fri (contact department for current hours); permits/inspections managed via OpenGov portal (cheyennewy.portal.opengov.com). Official information: https://www.cheyennecity.org/Your-Government/Departments/Compliance-Department/Building-Permitting-Licensing.

Yes. Both new signs and remodels of existing signs require a building permit, per the City's Building FAQ. Sign regulations are in UDC Section 6.5. The sign permit is issued at the same time as the building permit.

Yes, a specific list of low-impact sign types is exempt under UDC 6.5.5.b, including small nonilluminated incidental/directional signs in residential districts (3 sq ft or less), certain temporary signs within the UDC 6.5.4 allowances, window signs, nameplates/building markers up to 1 sq ft per 10 linear ft of building frontage, and government/public-safety signs. Any sign exceeding these specific thresholds requires a full sign permit.

Sources & verification

Verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cheyenne building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.