Sign Permit — Cheyenne, Wyoming · Requirements sheet
Verified 2026-07-22 · Source: https://www.cheyennecity.org/files/sharedassets/public/v/2/departments/compliance-division/building/building-handouts/updated-handouts/sign-permit-check-list.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Cheyenne, Wyoming
Required for new permanent signs and remodels/alterations of existing signs (wall, projecting, ground, low-profile, freestanding, billboard, and pedestrian-category signs) in Cheyenne, per Unified Development Code (UDC) Section 6.5. A sign permit is issued by the Building Safety Division at the same time as the building permit -- no sign may be erected without a building permit -- and certain low-impact sign types are exempt from the permit requirement entirely.
Verified 2026-07-22 · Source
When you need this permit
- A sign plan/permit is required for all new signs and for alterations of existing signs that replace more than 50% of the sign's surface area (UDC 6.5.2, 6.5.5.a); a sign plan is also required with the site plan review application for all new uses/buildings (except detached dwellings, duplexes, townhouses) and for any change of use involving alteration of an existing sign
- Plans are submitted to the Development Office/Planning and Development Department with the site plan review application, then submitted to the Director with any building plans; the Director determines issuance of the sign permit(s) at the same time as the building permit (UDC 6.5.5.a.1-2)
- No sign shall be erected without a building permit (UDC 6.5.5.a.3)
- Freestanding, billboard, and ground sign applications require digital structural/foundation plans stamped by a Wyoming registered design professional, and a final certification of sign placement/dimensions/setbacks stamped by a Wyoming engineer or land surveyor, submitted prior to final inspection (UDC 6.5.6.d; City Sign Permit Check List)
- Certain sign types are EXEMPT from the permit requirement if they meet the specific thresholds in UDC 6.5.5.b -- e.g., nonilluminated temporary signs within the allowances of UDC 6.5.4, nonilluminated incidental/directional signs in residential districts not exceeding 3 sq ft, nameplates/building markers not exceeding 1 sq ft per 10 linear ft of building frontage (max 10 sq ft), window signs, government/public-safety signs, and signs in place as of 6-14-93 that were properly permitted or required no permit at the time
- Signs exceeding any of the UDC 6.5.5.b exemption thresholds require a full sign permit subject to all applicable district regulations
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final -- Sign Placement
Verifies installed sign matches approved plans; for freestanding, billboard, and ground signs, the Wyoming-stamped placement certification (dimensions, setbacks, height) must be submitted to the Development Office and Building Department prior to this inspection (UDC 6.5.6.d)
See the full Cheyenne inspection guide — scheduling & re-inspection fees →
Tips
- No sign may be erected without a building permit in Cheyenne, even signs that seem 'temporary' -- only the specific exemptions listed in UDC 6.5.5.b (small nonilluminated incidental signs, certain temporary signs within allowances, window signs, nameplates, government signs, etc.) skip the permit requirement.
- Freestanding, billboard, and ground signs carry an extra step beyond wall/window signs: a final placement certification stamped by a Wyoming engineer or land surveyor must be submitted before final inspection -- budget time for this survey/certification step.
- The $50.00 Sign Permit Review Fee (Planning Fees, Resolution 6213) is separate from the valuation-based Building and Construction Permit Fee (Ordinance 4254) charged for the sign's construction cost -- both can apply to the same sign permit.
- 2026-07-22 grounded-extraction pass: fetched the current UDC Article 6 (Design Regulations, Section 6.5 Signs), the City's live Sign Permit Check List handout, the Building/Planning FAQ page, and the live Schedule of Fees PDF directly; all facts above are drawn from these official City of Cheyenne sources.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cheyenne building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cheyenne
Sign Permit in other cities
Compare sign permit fees across Wyoming →
Look up this fee in a different city →
Now live
Build your Cheyenne project checklist
Describe your project once and get every permit, document, and fee it triggers in Cheyenne — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →