Solar PV Permit — Cheyenne, Wyoming · Requirements sheet
Verified 2026-07-17 · Source: https://www.cheyennecity.org/files/sharedassets/public/v/2/departments/city-treasurer/schedule-of-fees/schedule-of-fees.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar PV Permit in Cheyenne, Wyoming
Required for installation of rooftop or ground-mounted solar photovoltaic systems in Cheyenne. Processed through the standard building/electrical permit process (structural + electrical scope); a separate Solar Access Permit System review exists for solar-access-rights questions under UDC § 39-4.
Verified 2026-07-17 · Source
When you need this permit
- Rooftop or ground-mounted solar PV installation requires a building permit (structural/racking) and electrical permit (interconnection, wiring) from the Compliance Department
- 2024 IFC solar-system 'pathway to ridge' fire-access requirements apply to systems installed/permitted on or after March 1, 2025 (systems existing or permitted before that date are grandfathered)
- A separate Solar Access Permit System review ($35 fee, City Code § 39-4) exists specifically to address solar-access-rights disputes between neighboring properties — this is distinct from the construction/electrical permit for the PV system itself
- Structural calculations for roof-mounted arrays must account for 32 lb/ft² snow load and 105 mph (VULT) wind design criteria [corrected 2026-07-17 from previously stated 30 psf / 115 mph, per the City's current live Table R301.2(1) Design Criteria]
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before cover
- 2
Final — Structural/Racking
Panel mounting, racking attachment, roof penetration sealing verified
- 3
Final — Electrical
All connections, inverter, interconnection point verified
See the full Cheyenne inspection guide — scheduling & re-inspection fees →
Tips
- The 2024 IFC's new solar 'pathway to ridge' fire-access rule applies to systems installed or permitted on or after March 1, 2025 — systems in place or permitted before that date are grandfathered per the Feb 24, 2025 ordinance.
- Don't confuse the $35 'Solar Access Permit System Review Fee' (a solar-access-rights review under City Code § 39-4, for resolving shading disputes between neighbors) with the actual building/electrical permit needed to install the PV system, which is charged under the general valuation table (Ord 4254).
- 2026-07-17 rotation audit: the $35.00 Solar Access Permit System Review Fee, the valuation-based PV construction fee table, and the 65% Plan Review Fee were all re-confirmed against the live Schedule of Fees PDF, unchanged.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-17.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cheyenne building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cheyenne
Solar PV Permit in other cities
Compare solar pv permit fees across Wyoming →
Look up this fee in a different city →