Solar PV Permit in Cheyenne, Wyoming

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Cheyenne. Processed through the standard building/electrical permit process (structural + electrical scope); a separate Solar Access Permit System review exists for solar-access-rights questions under UDC § 39-4.

Verified 2026-07-01 · Source

Varies by project valuation — see Building and Construction Permit Fee table under residential-building-permitBuilding and Construction Permit Fee — valuation-based (solar system cost)

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building and Construction Permit Fee — valuation-based (solar system cost)Varies by project valuation — see Building and Construction Permit Fee table under residential-building-permitPV construction is charged under the general valuation table (Ord 4254); no separate flat-rate solar construction fee line exists in the adopted Schedule of Fees.
Solar Access Permit System Review Fee (solar-access-rights review, not the installation permit itself)$35.00City of Cheyenne Schedule of Fees, In-House fee, City Code § 39-4
Plan Review Fee65% of the Building Permit FeeCity of Cheyenne Schedule of Fees (Ordinance 4254)

Review timeline

~1021 business days

Typical estimate — confirm current times with the Cheyenne building department

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before cover

  2. 2

    Final — Structural/Racking

    Panel mounting, racking attachment, roof penetration sealing verified

  3. 3

    Final — Electrical

    All connections, inverter, interconnection point verified

Tips

Frequently asked questions

Does Cheyenne have special fire code rules for solar installations?
Yes. The 2024 International Fire Code, adopted Feb 24, 2025, includes a pathway-to-ridge access requirement for rooftop solar systems. Systems in existence or permitted before March 1, 2025 are grandfathered from this specific requirement.
How is a solar PV installation permit fee calculated in Cheyenne?
PV construction (structural/racking and electrical interconnection) is charged under the City's general valuation-based Building and Construction Permit Fee table (Ordinance 4254) — there is no separate flat solar-construction fee line. The distinct $35 Solar Access Permit System Review Fee (Muni Code § 39-4) only applies to solar-access-rights disputes, not the construction permit itself.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cheyenne building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Cheyenne

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.