Solar PV Permit in Casper, Wyoming
Casper issues no separate solar-PV permit type; rooftop or ground-mounted PV is permitted as a combined building permit (structural/racking) and electrical permit (interconnection, wiring) under the City's general valuation-based fee schedule (City of Casper Fee Schedule, eff. Feb 2, 2026), the same schedule that prices every other building/electrical trade permit in Casper.
Verified 2026-07-16 · Source
When you need this permit
- Building permit required for racking/structural attachment to roof or ground mount
- Electrical permit required for PV wiring, disconnects, and interconnection (issued by Casper's own Building Inspection Division — see electrical-permit)
- Structural adequacy of the roof (snow/wind load per 2024 IRC/IBC) must be demonstrated
- Fee based on the value of the solar installation per the combined valuation-based fee schedule
- Contact the Building Inspection Division at (307) 235-8254 before submitting plans, as Casper does not publish a dedicated solar permit guide
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before concealment
- 2
Final Electrical
All connections, inverter, and interconnection point verified
- 3
Final (Building/Structural)
Racking attachment and roof penetration sealing verified
See the full Casper inspection guide — scheduling & re-inspection fees →
Tips
- Casper issues no separate solar-PV permit type; rooftop PV is permitted as a combined building + electrical permit under the general valuation-based fee schedule (City of Casper Fee Schedule, eff. Feb 2, 2026) — confirm the exact submittal path directly with the Building Inspection Division at (307) 235-8254 before applying.
- Structural calculations should account for Casper's snow and wind load design criteria under the 2024 IRC/IBC.
- The electrical portion is inspected by Casper's own Building Inspection Division (not the WY State Fire Marshal), consistent with Casper's local electrical authority.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Casper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Casper
Solar PV Permit in other cities
Compare solar pv permit fees across Wyoming →
Look up this fee in a different city →
Now live
Build your Casper project checklist
Describe your project once and get every permit, document, and fee it triggers in Casper — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →