Electrical Permit in Casper, Wyoming

Verified

Required for electrical installations, alterations, and service changes within the City of Casper. Casper's Building Inspection Division holds delegated local electrical authority and performs its OWN electrical plan review and inspections under the 2023 NFPA 70 NEC — electrical permits here are NOT issued by the Wyoming State Fire Marshal's statewide electrical program.

Verified 2026-07-01 · Source

$35Initial Building Permit Fee

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Initial Building Permit Fee$35City of Casper Permit Fee Schedule (eff. February 2, 2026) — Casper does not publish a separate electrical-only fee table; electrical work is priced off the combined valuation table
Combined Building/Electrical/Plumbing/Mechanical Permit Fee — valuation-basedGraduated table from $70 (valuation $1–$1,000) up to $841 (valuation $99,001–$100,000); over $100,000 = $806 + $5.60 per additional $1,000 or fraction thereofCity of Casper Permit Fee Schedule (eff. February 2, 2026) — labeled 'Combined Building, Electrical, Plumbing and Mechanical Permit Fee Schedule'

Review timeline

~110 business days

Typical estimate — confirm current times with the Casper building department

Inspection process

  1. 1

    Temporary Power

    For a temporary power pole or similar setup used during construction

  2. 2

    Rough Electrical

    Performed after the structure is framed and dried in, and after electrical components are roughed in, before trim out

  3. 3

    Service

    Performed for service replacement and for permanent power to new structures; structure must be secured prior to requesting

  4. 4

    Final Electrical

    Performed when all electrical work is 100% complete; typically coordinated with other trades as part of Final/C.O. inspection

Tips

Frequently asked questions

Does the State of Wyoming or the City of Casper issue electrical permits in Casper?
The City of Casper issues its own electrical permits and performs its own electrical inspections through its Building Inspection Division (which includes a Deputy Building Official/Electrical Inspector and an Electrical Inspector). This is because Casper holds delegated local building/electrical code enforcement authority under W.S. § 35-9-121, rather than defaulting to the Wyoming State Fire Marshal's statewide electrical program. Confirm current requirements with the Building Inspection Division at (307) 235-8254.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Casper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Casper

Related guides

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.